34-111-24412

Well Details

Well ID: 34-111-24412
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000538
Farm/Lease Name: NORMAN UNIT
License Status: Producing
License Date: 2014-05-23
Spud Date: 2013-11-02
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-02-13
Well Total Depth: 14882.00 ft
Configuration: Horizontal
Latitude: 39.810000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-10 Proposed Formations:POINT PLEASANT, Issued Date:7/10/2013, Expired Date:7/10/2015 12:00:00 PM, Drilling unit acres:449.996, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-02-13
Correction to Well 2014-04-04 CHANGE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 448.074 ACRES.
APP 2014-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:448.074, Proposed Well Type:OG, Proposed Well Class:EDPW
Completion Report Received 2015-04-20
Construction Permit Expires 2016-05-22
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-20 9001 14576 0
9001 14576 0
9001 14576 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/21/2014 05/01/2014 8335 8,227,630.0 50151

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexaid 673 Chemplex Scale Inhibitor Sodium Salt of Phosphonodimethylated Diamine Proprietary 5 0.00079 0
Water 7732-18-5 85 0.01335 0
Methyl Alcohol 67-56-1 25 0.00393 0
Plexbreak 145 Chemplex Non-emulsifier Water 732-18-5 66 0.00052 0
Cocamide Diethanolamine Salt 68603-42-9 10 0.00008000 0
Methyl Alcohol 67-56-1 15 0.00012 0
Ethylene Glycol Monobutyl Ether 111-76-2 15 0.00012 0
Diethanolamine 111-42-2 5 0.00004000 0
20/40 White US Silica Propppant Sand 14808-60-7 100 2.9237 0
Freshwater Antero Resources Water Water 7732-18-5 100 90.709 0
Sodium Persulfate Chemplex Breaker Sodium Persulfate 7775-27-1 100 0.00123 0
Plexcide 15G Chemplex Biocide Ethanol 64-17-5 3 0.00076 0
Water 7732-18-5 90 0.02285 0
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.00076 0
Glutaraldehyde 111-30-8 14 0.00355 0
Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.00076 0
Ferriplex 66 Chemplex Iron Control Citric Acid 77-92-9 30 0.00013 0
Acetic Acid 64-19-7 50 0.00022 0
Water 7732-18-5 35 0.00016 0
Plexhib 256 Chemplex Corrosion n-olefins Proprietary 10 0.00007000 0
thiourea-formaldehyde copolymer 68527-49-1 30 0.00021 0
Alcohol Ethoxylate Surfactants Proprietary 30 0.00021 0
Propargyl Alcohol 107-19-7 8 0.00006000 0
Methyl Alcohol 67-56-1 70 0.00049 0
40/70 White US Silica Propppant Sand 14808-60-7 100 4.9144 0
Plexslick 953 Chemplex Friction Reducer Polyacrylamide-co-acrylic acid 9003-06-9 32 0.01967 0
Alcohol Ethoxylate Surfactants Proprietary 8 0.00492 0
Hydrotreated Petroleum Distillate 64742-47-8 30 0.01844 0
Water 7732-18-5 35 0.02152 0
SOS 1545 Ultrablend Guar Gel Petroleum Distillate 64742-47-8 55 0.04677 0
Clay 1302-78-9 5 0.00425 0
Guar Gum 9000-30-0 50 0.04252 0
Surfactant 154518-36-2 1 0.00085 0
Hydrochloric Acid 10-15% Reagent Acid Hydrchloric Acid 7647-01-0 15 0.03424 0
100 Mesh US Silica Propppant Sand 14808-60-7 100 1.2677 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2020-05-01 H2O 15 5982 Bbl 251894 Go Frac LLC STAGE 32/32
2014-04-21 H2O 15 6442 Bbl 127570 Go Frac LLC STAGE 1/32

STAGES 2-31 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 1516805 194 182
2015 ANTERO RESOURCES CORPORATION 1166828 251 365
2016 ANTERO RESOURCES CORPORATION 575744 105 363
2017 ANTERO RESOURCES CORPORATION 446475 86 365
2018 ANTERO RESOURCES CORPORATION 341993 120 365
2019 ANTERO RESOURCES CORPORATION 66829 51 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 723 182
2015 ANTERO RESOURCES CORPORATION Brine 8779 365
2016 ANTERO RESOURCES CORPORATION Brine 5232 363
2017 ANTERO RESOURCES CORPORATION Brine 3174 365
2018 ANTERO RESOURCES CORPORATION Brine 2399 365
2019 ANTERO RESOURCES CORPORATION Brine 405 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-107011558 2014-2-3 0:00:0 DD No Violations 1.30
-1649848330 2013-11-12 0:00 DD No Violations
-1769440351 2013-12-12 0:00 DD No Violations 0.50
-1973906257 2014-6-9 0:00:0 CT No Violations
-282101817 2020-7-23 0:00: WR No Violations 1.50
-441854420 2018-3-7 0:00:0 PW No Violations 0.20
-60339106 2014-1-27 0:00: DD No Violations 1.50
0060339106 2014-01-27 Drill / Deepen / Reopen No Violations Status check inspection on the drilling progress found the current drilling depth to be 6,042 in the 12.250 2nd intermediate well bore section with a proposed total depth to be drilled of 7,149. The company is misting 3% KCL.
0107011558 2014-02-03 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found the current drilling depth to be 7,996 and the company beginning the horizontal well bore curve section with a current azimuth of 38.18 degrees and inclination of 65.48 degrees. The company is operating on a 21 day blow out preventer test cycle time period.
0427339870 2014-01-22 Drill / Deepen / Reopen No Violations Status check inspection found the current drilling depth to be 3,349 in the 12.2502nd intermediate well bore section with the company using directional drilling tools with a inclination of 4.76 and azimuth of 86.26 degrees. The company has completed the required deviating for this section and is preparing to pull out of the hole with the directional tolls and pick up a 12.250 hammer bit and run back in the hole and complete this well bore section with the next casing string to be set being 9.625. On this day I also addressed several issues with the ground of rig support equipment.
0441854420 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the back of the pad, and a midstream facility behind the gas processing units.
0540574392 2014-05-01 Completion Testing No Violations Status check inspection found the stimulation process complete with 32 stages stimulated by Go-Frac well services and the company rigging down and moving over to begin the stimulation on the Gary # 1-H well API # 3411124375-0000.
0817697556 2014-07-30 Preliminary Restoration No Violations Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 8- 400 barrel production tanks on site servicing all 6 wells on the drill pad now in production.
0834612231 2019-01-29 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units, (4) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
1249091200 2018-03-07 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 200 pounds pressure and the 9.625 casing well head reads 0 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair.
1383439976 2013-11-02 Drill / Deepen / Reopen No Violations The said well was spudded on 11/02.2013 with 100 of 26 conductor to be set inside a 32 well bore. Fresh water was hit at 4 while setting the cellar.
1384560714 2013-11-15 Drill / Deepen / Reopen No Violations Inspection found the current drilling depth to be 1164 using a 17.5 bit with the next casing point to be 2000, Gyro Deviation borehole surveys are being taken every 250 with the last survey at 1033 showing a inclination of .31 degrees.
1384799877 2013-11-18 Drill / Deepen / Reopen No Violations Status check inspection found the drilling company Falcon rig # 20 has completed the drilling and running of the 13.375 1st intermediate casing string with 2070 of 17.5 hole drilled and 2070 of 13.375 casing set inside of a 17.5 borehole with 73 barrels of cement returns to surface, inspector did not witness the surface cement job due to being in a mandatory training meeting on 11/17/2013.
1386943834 2013-12-12 Drill / Deepen / Reopen No Violations On site inspection to document the status of the drilling process, The well bore has been drilled to the point of the 1st intermediate casing string and the larger rig is slated to move in soon.
1391997681 2014-02-09 Drill / Deepen / Reopen No Violations Notification was received by the company man on site by phone that the total drilling depth has been reached at 14,882 and the were conditioning the hole in anticipation of pulling out of the hole with the drill string to begin running the production casing.
1649848330 2013-11-12 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling of the surface borehole found the well bore total drilling depth has been reached at 413 using a 26 diameter drill bit. The rig Kelly bushing is 11.
1769440351 2013-12-12 Drill / Deepen / Reopen No Violations Wells have been spudded but not completed. Waiting on drill rig for drilling intermittent strings and lateral.
1973906257 2014-06-09 Completion Testing No Violations Status check inspection on the workover process found Key Completion Service workover rig on the hole with Cudd services providing well head control, the company is currently running in the hole to drill out the completion plugs. The company completion supervisor Don Meador was on site and we discussed the drill out balanced drilling and well head control procedure along with the work over blow out preventer test in which I received the charted tests for.
2120846443 2020-5-22 0:00: PW No Violations 1.00
427339870 2014-1-22 0:00: DD No Violations 2.50
540574392 2014-5-1 0:00:0 CT No Violations 0.50
817697556 2014-7-30 0:00: PL No Violations 0.50
834612231 2019-1-29 0:00: PW No Violations 0.10

For data sources see[10]

References