X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-115-24690

Well Details

Well ID: 34-115-24690
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Homer Township
Operator Name: AM-TEK OIL INC
Well Pad ID:
Farm/Lease Name: TOWNLEY
License Status: Producing
License Date: 2015-04-09
Spud Date: 2014-08-28
Spud Drilling Contractor: HIGHLAND DRLG
Final Drill Date: 2014-09-19
Well Total Depth: 7681.00 ft
Configuration: Vertical
Latitude: 39.510000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-05 Proposed Formations:POINT PLEASANT/CONASAUGA, Issued Date:8/5/2014, Expired Date:8/4/2016 12:00:00 PM, Drilling unit acres:, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2014-09-19 Re Permitted. Acidize Beekmantown.
Change of Owner 2015-03-20 Operator changed from 9307, ENERGY CORPORATION OF AMERICA to 7671, KEITO GAS INC
APP 2015-04-09 Proposed Formations:SECOND BEREA THRU CONASAUGA, Issued Date:4/9/2015, Expired Date:4/8/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW
Construction Permit Expires 2017-04-08 Re Permitted. Acidize Beekmantown.
Completion Report Received 2018-02-22 Re Permitted. Acidize Beekmantown.
Record Last Modified 2018-03-02 Re Permitted. Acidize Beekmantown.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-11-05 5605 5620 30
2014-11-05 7313 7328 32
7313 7328 32
5605 5620 30
5605 5620 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/22/2014 10/22/2014 7312 4704

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water ECA Base Fluid Water NA 100 99.9938 0
X-Chem B-84 X-Chem Inc. Microbiocide Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00085 0
n-alkyl dimethyl ammonium chloride 68424-85-1 5.5 0.000585 0
Ethanol 64-17-5 4 0.000425 0
Glutaradehyde 111-30-8 27 0.00287 0
X-Chem SC-30 X-Chem inc. Scale Inhibitor Sodium Polyacrylate 9003-04-7 20 0.00425 0
Sodium Hydroxide 1310-73-2 5 0.00106 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-10-22 H2O 0 2520 Gal 0 STAGE 1

32 HOLES CASED HOLE SOLUTIONS

2014-10-22 H2O 0 2184 Gal 0 STAGE 2

30 HOLES

2015-09-29 ACID 0 3500 Gal 0 Producers Service Corporation

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 KEITO GAS INC 360.00 0.00 365
2018 KEITO GAS INC 626.00 0.00 365

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 KEITO GAS INC Brine 0 365
2018 KEITO GAS INC Brine 0 365

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1355244503 2014-8-27 0:00: DD No Violations 3.00
-677247303 2014-10-22 0:00 DD No Violations
-820829092 2014-9-3 0:00:0 DD No Violations
0161596236 2014-09-11 Drill / Deepen / Reopen No Violations Currently drilling at 4774 feet. Plan to TD this section of the borehole this afternoon and will cement the intermediate string tomorrow morning. Also review well pad construction with Andy Thomas of Engineers.
0649381814 2014-09-04 Drill / Deepen / Reopen No Violations Operator has finished drilling the 17.5 hole for the surface casing. The wrong kind of lift nubbins were on location so they are currently awaiting for replacements.
0677247303 2014-10-22 Drill / Deepen / Reopen No Violations ECA was on location with Superior and Cased hole Solutions for a multi-stage DFIT injection test. Operator had run a cement bond log and the top of cement was at 5240 on the 4.5. They then pressure tested the casing and perfed stage 1 (Conasauga), and were beginning to pump on the well up to 10 bpm. Operator will then set two Blue Dot Retrievable bridge plugs and perf stage 2 (point pleasant).
0820829092 2014-09-03 Drill / Deepen / Reopen No Violations Highlands Drilling LLC is on location setting up the rig. Operator will be ready to spud sometime this evening. I performed a site inspection and there were no issues to report at this time.
1200549822 2014-12-03 Drill / Deepen / Reopen No Violations The well is currently shut in and the annulus is hooked up to a locked meter box. The site has been graded and seeded with vegetation beginning to grow in most places.
1299868209 2014-08-28 Drill / Deepen / Reopen No Violations Ziegenfuss Drilling Inc. was on location welding another 20 section of drive pipe. There is currently 40 in the hole. There is a total of 100 of pipe on location.
1355244503 2014-08-27 Drill / Deepen / Reopen No Violations Met company man for pre-spud meeting to discuss drilling program.
1407877757 2014-08-12 Not Drilled No Violations Precision Mechanics was on location using dozers to clear the area for well pad construction.
1409878409 2014-09-04 Drill / Deepen / Reopen No Violations I was on location to witness the cementing of the 13 3/8 surface casing. Highlands Drilling drilled a 17 1/2 hole to 540 and the casing depth was 515 with six centralizers. Universal Cement company pumped 20 bbls of 6% gel with flake set the string using 434 sacks of Type 1 cement. There were good returns at the surface. Universal held pressure at 1000 psi for 5 minutes with no issues.
1409939428 2014-09-05 Drill / Deepen / Reopen No Violations I was on location to witness Greenes Energy Group test the annular BOP (BAG). The first test was at 250 psi for 15 minutes. At the end of the test is had dropped to 215 psi. Operator added another bolt and tightened up the BOP. They tested at 1000 psi with no decline. The BOP passed the test.
1411061471 2014-09-18 Drill / Deepen / Reopen No Violations I was on location for a site inspection. Highlands Drilling in currently at a depth of6833 with a ROP of 27/hour. There are no issues to report at this time.
1463409666 2016-05-16 Preliminary Restoration No Violations The purpose of this inspection is a status check on a preliminary restoration. During my inspection I witnessed the well is equipped with 13.375 inch surface casing, 4.5 inch production casing, and 2 inch tubing. Well is shut in. A disassembled pumping unit is on location off to the side not in use. The production equipment includes two 100 bbl. tanks, one vertical separator, and a chart meter. The production equipment is within a 67 feet long, 25 feet wide, and 2 feet deep earthen dike. Rain water lays in the dike due to heavy rains in the last couple of weeks. One 100 bbl. tank sits on its side off to the side of location not in use. A gravel lease road leading to a locked gate is in place. Grass is growing alongside the lease road and around location. Location has met 1509.072 A requirements. Preliminary Restoration has passed.
161596236 2014-9-11 0:00: DD No Violations 2.00
649381814 2014-9-4 0:00:0 DD No Violations

For data sources see[10]

References