34-153-22972

Well Details

Well ID: 34-153-22972
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name: DICKRIEDE UNIT
License Status: Final Restoration
License Date: 2013-06-05
Spud Date: 2006-02-14
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2006-02-17
Well Total Depth: 4036.00 ft
Configuration: Vertical
Latitude: 40.970000
Longitude: -81.630000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-01-23 Proposed Formations:CLINTON, Issued Date:1/23/2006, Expired Date:1/23/2007 6:00:00 AM, Drilling unit acres:28.054, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2006-02-14 RBDMS Rec
Completed 2006-02-17 RBDMS Rec
Reached Total Depth 2006-02-17 RBDMS Rec
Completion Report Received 2006-05-22 RBDMS Rec
APP 2013-06-05 Proposed Formations:CLINTON, Issued Date:6/5/2013, Expired Date:6/5/2015 12:00:00 PM, Drilling unit acres:28.054, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2013-09-20 RBDMS Rec
Construction Permit Expires 2015-06-05 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-08-07 3826 3871 17
3826 3871 17
3826 3871 17

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 82000 Gal 60000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 GONZOIL INC 6260.00 15.00 122
2007 GONZOIL INC 7495.00 0.00 365
2008 GONZOIL INC 3196.00 0.00 365
2009 GONZOIL INC 2413.00 0.00 365
2010 GONZOIL INC 1772.00 0.00 365
2011 GONZOIL INC 1396.00 0.00 365
2012 GONZOIL INC 1388.00 0.00 366
2013 GONZOIL INC 816.00 70.00 255

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 GONZOIL INC Brine 60 122
2007 GONZOIL INC Brine 150 365
2008 GONZOIL INC Brine 140 365
2009 GONZOIL INC Brine 117 365
2010 GONZOIL INC Brine 28 365
2011 GONZOIL INC Brine 0 365
2012 GONZOIL INC Brine 80 366
2013 GONZOIL INC Brine 108 255

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1489791325 2008-12-18 0:00 PW No Violations
-1916884268 2006-3-15 0:00: DD No Violations
-210668805 2006-7-12 0:00: PL No Violations
-448190492 2006-2-17 0:00: DD No Violations
-600162301 2006-2-10 0:00: DD No Violations
-864263411 2006-4-25 0:00: DD No Violations
-952903287 2006-2-15 0:00: DD No Violations
0210668805 2006-07-12 Preliminary Restoration No Violations Preliminary restoration is approved.
0256553276 2006-02-21 Drill / Deepen / Reopen No Violations Drilling rig has moved off. The pits are lined and fenced. No violations at this time.
0448190492 2006-02-17 Drill / Deepen / Reopen No Violations Wildcat drilling ahead. Pits are lined and in good condition. The rig did encounter some water flow from the Bass Island interval but was able to continue drilling by starting to soap at 2695. The excess water was transferred from the pits to the frac tanks and was then disposed by Pander Trucking. It does not appear that there is any significant communication between this well and the PPG solution mine.
0600162301 2006-02-10 Drill / Deepen / Reopen No Violations Gonzoil and Daley Excavating are on site building the lease road and scraping the topsoil. The drilling rig should arrive the first of next week.
0864263411 2006-04-25 Drill / Deepen / Reopen No Violations The tank battery has been set and the fence post have been cemented. The site has been graded and will be ready for planting in the near future. No violations at this time.
0952903287 2006-02-15 Drill / Deepen / Reopen No Violations On site to witness the BOP test before drilling out from under surface. The test began at 750 psi. After 15 minutes, the pressure had declined to 720 psi. The BOP test was successful.
1140118861 2006-02-14 Drill / Deepen / Reopen No Violations Wildcat Drilling is on the location and Daley Excavating has started digging the pits. No violations at this time.
1489791325 2008-12-18 Production Wells No Violations Status check inspection found no violations at this time.
1876905650 2006-03-03 Drill / Deepen / Reopen No Violations No change in the location since the last inspection. The pits are open and according to Doug Gonzalez, will be solidified on or about March 15.
1916884268 2006-03-15 Drill / Deepen / Reopen No Violations Daley Excavating and Chemtech were on site to solidify the drilling pits. No violations at this time.
199903505 2019-12-4 0:00: FR No Violations 0.50
256553276 2006-2-21 0:00: DD No Violations

For data sources see[9]

References