If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22973 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Richfield Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: ESAREY UNIT | |
License Status: Producing | |
License Date: 2006-01-23 | |
Spud Date: 2006-02-20 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2006-02-23 | |
Well Total Depth: 3630.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-01-23 | Proposed Formations:CLINTON, Issued Date:1/23/2006, Expired Date:1/23/2007 6:00:00 AM, Drilling unit acres:22.732, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-02-20 | RBDMS Rec |
Completed | 2006-02-23 | RBDMS Rec |
Reached Total Depth | 2006-02-23 | RBDMS Rec |
Completion Report Received | 2006-05-22 | RBDMS Rec |
Construction Permit Expires | 2007-01-23 | RBDMS Rec |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-08-07 | 3479 | 3502 | 24 |
3479 | 3502 | 24 | |
3479 | 3502 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 88000 Gal | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | GONZOIL INC | 7416.00 | 5209.00 | 153 |
2007 | GONZOIL INC | 23100.00 | 5769.00 | 365 |
2008 | GONZOIL INC | 19247.00 | 4245.00 | 365 |
2009 | GONZOIL INC | 13361.00 | 3763.00 | 365 |
2010 | GONZOIL INC | 12937.00 | 3012.00 | 365 |
2011 | GONZOIL INC | 8459.00 | 2026.00 | 365 |
2012 | GONZOIL INC | 11924.00 | 1504.00 | 366 |
2013 | GONZOIL INC | 9339.00 | 1476.00 | 365 |
2014 | GONZOIL INC | 5291.00 | 1107.00 | 365 |
2015 | GONZOIL INC | 3374.00 | 893.00 | 365 |
2016 | GONZOIL INC | 2692.00 | 776.00 | 365 |
2017 | GONZOIL INC | 3938.00 | 760.00 | 365 |
2018 | GONZOIL INC | 2591.00 | 443.00 | 180 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | GONZOIL INC | Brine | 246 | 153 |
2007 | GONZOIL INC | Brine | 0 | 365 |
2008 | GONZOIL INC | Brine | 0 | 365 |
2009 | GONZOIL INC | Brine | 0 | 365 |
2010 | GONZOIL INC | Brine | 199 | 365 |
2011 | GONZOIL INC | Brine | 0 | 365 |
2012 | GONZOIL INC | Brine | 0 | 366 |
2013 | GONZOIL INC | Brine | 0 | 365 |
2014 | GONZOIL INC | Brine | 0 | 365 |
2015 | GONZOIL INC | Brine | 35 | 365 |
2016 | GONZOIL INC | Brine | 0 | 365 |
2017 | GONZOIL INC | Brine | 0 | 365 |
2018 | GONZOIL INC | Brine | 0 | 180 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2080263801 | 2006-2-3 0:00:0 | DD | No Violations | |
1141402936 | 2006-02-27 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling has moved off site. The pits are lined and have sufficient freeboard. The pits are also fenced. No violations at this time. |
1312671557 | 2006-07-11 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1745600048 | 2006-01-17 | Drill / Deepen / Reopen | No Violations | The signage is posted, the location has been cleared and graded and the lease road is completed. The drilling rig is cheduled to move on 2/20. |
1963557637 | 2006-04-27 | Drill / Deepen / Reopen | No Violations | Contractor was on site today to set the fence around the tank battery and wellhead. Gonzoil still needs to complete grading and seeding for preliminary restoration. |
2080263801 | 2006-02-03 | Drill / Deepen / Reopen | No Violations | Gonzoil and Daley Excavating are onsite to build the lease road and location. The required signage is posted at the entryway. |
For data sources see[9]