X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22989

Well Details

Well ID: 34-153-22989
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: LAUREL LAKE
License Status: Producing
License Date: 2006-12-06
Spud Date: 2007-05-07
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2007-05-10
Well Total Depth: 3929.00 ft
Configuration: Vertical
Latitude: 41.240000
Longitude: -81.460000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-12-06 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:12/6/2006, Expired Date:12/6/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2007-05-10
Reached Total Depth 2007-05-10
Completion Report Received 2007-08-03
Construction Permit Expires 2007-12-06
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-11-06 3734 3752 38
2007-11-06 3768 3780 26
3734 3752 38
3768 3780 26
3734 3752 38

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2693 Bbl 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 OHIO VALLEY ENERGY SYSTEMS COR 737.00 541.00 49
2008 OHIO VALLEY ENERGY SYSTEMS COR 26214.00 988.00 365
2009 OHIO VALLEY ENERGY SYSTEMS COR 26217.00 678.00 365
2010 OHIO VALLEY ENERGY SYSTEMS COR 29730.00 553.00 365
2011 OHIO VALLEY ENERGY SYSTEMS COR 20040.00 436.00 365
2012 OHIO VALLEY ENERGY SYSTEMS COR 15537.00 358.00 366
2013 OHIO VALLEY ENERGY SYSTEMS COR 10698.00 278.00 365
2014 OHIO VALLEY ENERGY SYSTEMS COR 8898.00 253.00 365
2015 OHIO VALLEY ENERGY SYSTEMS COR 7466.00 218.00 365
2016 OHIO VALLEY ENERGY SYSTEMS COR 5315.00 128.00 365
2017 OHIO VALLEY ENERGY SYSTEMS COR 3923.00 120.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 4624.00 219.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 OHIO VALLEY ENERGY SYSTEMS COR Brine 4684 49
2008 OHIO VALLEY ENERGY SYSTEMS COR Brine 481 365
2009 OHIO VALLEY ENERGY SYSTEMS COR Brine 271 365
2010 OHIO VALLEY ENERGY SYSTEMS COR Brine 149 365
2011 OHIO VALLEY ENERGY SYSTEMS COR Brine 135 365
2012 OHIO VALLEY ENERGY SYSTEMS COR Brine 79 366
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 83 365
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 87 365
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 77 365
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 33 365
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 32 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1091389615 2007-6-1 0:00:0 DD No Violations
-1311809556 2008-1-9 0:00:0 PL No Violations
0102551764 2007-05-17 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and are being covered over. After this work has been completed, a drainage system will be installed to direct the artesian flow from around the outside of the conductor casing to the nearby catch basin.
0748568577 2007-05-03 Drill / Deepen / Reopen No Violations The drilling location has been built. The signage is posted and the silt fence has been installed. The rig should arrive in the next few days.
102551764 2007-5-17 0:00: DD No Violations
1091389615 2007-06-01 Drill / Deepen / Reopen No Violations The artesian flow containment system needs to be modified to more efficiently collect and remove the fresh water. It is still collecting around the wellhead.
1179321410 2007-05-14 Drill / Deepen / Reopen No Violations The drilling rig has moved off and Pander was on site pumping down the pits. The artesian flow coming around the backside of the conductor has been temporarily channeled to a catch basin that discharges into Laurel Lake. A Quantab test of the water indicated chloride concentrations less than 100 ppm. After the pits are closed, a permanent control system will be installed.
1235156958 2009-02-10 Production Wells No Violations Status check inspection found no violaitons at this time.
1311809556 2008-01-09 Preliminary Restoration No Violations Preliminary restoration is approved.
2046382330 2007-05-29 Drill / Deepen / Reopen No Violations Dons Excavating was on site to start construction on the artesian flow control project. The plan is to install a drywell at the wellhead to collect the water and then transport it to the catch basin via a four inch PVC drain pipe.
748568577 2007-5-3 0:00:0 DD No Violations

For data sources see[9]

References