If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23054 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.27,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Richfield Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: HRADISKY UNIT | |
License Status: Producing | |
License Date: 2008-05-22 | |
Spud Date: 2008-10-03 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-10-09 | |
Well Total Depth: 3715.00 ft | |
Configuration: Vertical | |
Latitude: 41.270000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-05-22 | Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:5/22/2008, Expired Date:5/22/2009 6:00:00 AM, Drilling unit acres:21.22, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-10-09 | |
Completion Report Received | 2009-01-02 | |
Construction Permit Expires | 2009-05-22 | |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-02-20 | 3519 | 3572 | 30 |
3519 | 3572 | 30 | |
3519 | 3572 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 88000 Gal | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | GONZOIL INC | 8289.00 | 7474.00 | 365 |
2010 | GONZOIL INC | 38009.00 | 7200.00 | 365 |
2011 | GONZOIL INC | 35489.00 | 5178.00 | 365 |
2012 | GONZOIL INC | 17399.00 | 3526.00 | 366 |
2013 | GONZOIL INC | 12289.00 | 2508.00 | 365 |
2014 | GONZOIL INC | 12392.00 | 1959.00 | 365 |
2015 | GONZOIL INC | 10058.00 | 1502.00 | 365 |
2016 | GONZOIL INC | 9055.00 | 1057.00 | 365 |
2017 | GONZOIL INC | 6024.00 | 998.00 | 365 |
2018 | GONZOIL INC | 3806.00 | 411.00 | 180 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | GONZOIL INC | Brine | 282 | 365 |
2010 | GONZOIL INC | Brine | 58 | 365 |
2011 | GONZOIL INC | Brine | 0 | 365 |
2012 | GONZOIL INC | Brine | 0 | 366 |
2013 | GONZOIL INC | Brine | 0 | 365 |
2014 | GONZOIL INC | Brine | 30 | 365 |
2015 | GONZOIL INC | Brine | 0 | 365 |
2016 | GONZOIL INC | Brine | 0 | 365 |
2017 | GONZOIL INC | Brine | 0 | 365 |
2018 | GONZOIL INC | Brine | 0 | 180 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1062277784 | 2008-9-30 0:00: | DD | No Violations | |
-1110049666 | 2009-6-16 0:00: | PL | No Violations | |
-1258477807 | 2008-10-17 0:00 | DD | No Violations | |
-1626025634 | 2010-5-19 0:00: | PW | No Violations | |
-2078072192 | 2008-12-23 0:00 | DD | No Violations | |
-2116800432 | 2008-12-2 0:00: | DD | No Violations | |
-276640307 | 2009-2-24 0:00: | PW | No Violations | |
0276640307 | 2009-02-24 | Production Wells | No Violations | The well is now in production and the required fencing is up and signage is posted. Preliminary restoration should be approved later this spring. |
1062277784 | 2008-09-30 | Drill / Deepen / Reopen | No Violations | Dailey Excavating is on site building the location. The permit and signage are posted at the lease entrance and the silt fence has been installed. No violations at this time. |
1110049666 | 2009-06-16 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1223294297 | 2008-10-04 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 5/8 casing. I found no violations at this time. |
1258477807 | 2008-10-17 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified with two loads of dust from Chemtron. Dailey Excavating personnel mixed the dust and started covering the pits. |
1404231375 | 2008-11-12 | Drill / Deepen / Reopen | No Violations | The tank battery equipment is on site but still needs to be assembled. The pits have been solidified and the site has been rough graded. No violations at this time. |
1626025634 | 2010-05-19 | Production Wells | No Violations | On May 18, the Uniontown office received a call from Nancy Wagner at 4941 Berkley Road in Richfield reporting a problem with her pond. This spring they experienced a fish kill that depleted the pond almost entirely. The species included two amurs and numerous pan fish. The pond does have an inlet that diverts water from the neighboring Ohio Turnpike property to the east into the pond and an outlet that directs water to the west. There was no aparent impact to the vegetation both in the pond (catails) and adjacent to the pond (grass, conifer and deciduous trees). A Quantab test indicated that the chloride content of the pond was low. There was no odor or visible sheen on the pond. GonzOil operates the Hradisky well which is located approximately 100 south of the pond. Prior to drilling, GonzOil collected and analyzed a sample from the pond in question. The analytical results at that time indicated that the chlorides were slightly elevated as were sodium and sulfate. The pH was basic. I suggested that the Wagners close the diversion from the Turnpike property and monitor the pond. I asked that they call me if they notice any change. |
1677688486 | 2008-10-04 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection. The pit liners were in good shape. The location was in good shape. There were no violations at this time. |
2078072192 | 2008-12-23 | Drill / Deepen / Reopen | No Violations | The tank battery is under construction. |
2116800432 | 2008-12-02 | Drill / Deepen / Reopen | No Violations | The well has been fraced and the tank battery is under construction. The site has been rough graded and the silt fence is still in good condition. No violations at this time. |
For data sources see[9]