Well Details

Well ID: 34-153-23064
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: DOMINION EAST OHIO
Well Pad ID:
Farm/Lease Name: METROPARKS
License Status: Storage Well
License Date: 2014-03-05
Spud Date: 2008-10-27
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-11-01
Well Total Depth: 4024.00 ft
Configuration: Vertical
Latitude: 40.940000
Longitude: -81.620000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-09-29 Proposed Formations:CLINTON, Issued Date:9/29/2008, Expired Date:9/29/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-11-01
Completion Report Received 2009-01-15
Change of Owner 2010-04-30 Operator changed from 8321, DOMINION EXPL& PROD INC to 8632, DOMINION FIELD SERVICES INC
Change of Owner 2014-02-20 Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO
APP 2014-03-05 Proposed Formations:CLINTON, Issued Date:3/5/2014, Expired Date:3/4/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class:
Construction Permit Expires 2015-03-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-02-26 3758 3844 25
3758 3844 25
3758 3844 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 530 Mscf 52000 FRAC ALSO INVOLVED 1537 BBLS OF WATER

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 DOMINION EXPL& PROD INC 47942.00 0.00 26
2009 DOMINION EXPL& PROD INC 379586.00 13.00 365
2010 DOMINION FIELD SERVICES INC 175351.00 50.00 365
2011 DOMINION EAST OHIO 227136.00 76.00 365
2012 DOMINION FIELD SERVICES INC 282692.00 113.00 366
2013 DOMINION FIELD SERVICES INC 177761.00 44.00 355

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 DOMINION EXPL& PROD INC Brine 84 26
2009 DOMINION EXPL& PROD INC Brine 171 365
2010 DOMINION FIELD SERVICES INC Brine 70 365
2011 DOMINION EAST OHIO Brine 0 365
2012 DOMINION FIELD SERVICES INC Brine 174 366
2013 DOMINION FIELD SERVICES INC Brine 125 355

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1113221047 2008-10-31 0:00 DD No Violations
-1843130628 2008-10-24 0:00 DD No Violations
-418854817 2009-6-23 0:00: PW No Violations
-601654796 2014-12-26 0:00 UP No Violations
-78541648 2009-10-22 0:00 PL No Violations
0078541648 2009-10-22 Preliminary Restoration No Violations Preliminary restoration is approved.
0418854817 2009-06-23 Production Wells No Violations Status check inspection for preliinary restoration status found that the affected area has been graded and seeded. The area between the well and the tank battery needs additional time and/or seed before restoration is approved.
0601654796 2014-12-26 UrbanProduction Wells No Violations I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of a 140 BBL production tank, mechanical separator, a 1500 gallon poly brine tank. The valves were open on the well and in production. The low pressure relief valve, spark arrestor and charcoal filter were installed on the 140 BBL production tank. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found.
0667361189 2019-02-20 Storage Well No Violations My inspection found the well is equipped with a pumpjack. The diked tank battery consists of a steel tank, a plastic brine tank, two meters, a heater, a verical and a horizontal separator. The well is legibly identified. The well and tank battery are fenced in, gated and locked. No compliance issues are cited at this time.
0907056654 2018-03-15 Storage Well No Violations I did a status check inspection for this storage well. The well is equipped with a plunger-lift system. The diked tank battery consists of a steel tank, a plastic brine tank, a vertical separator, a horizontal separator, a heater and a meter. The well is legibly identified. The well and tank battery are fenced in, gated and locked. No compliance issues are cited at this time.
1005263149 2008-12-02 Drill / Deepen / Reopen No Violations The required fence and ID are up and the well can be turned on. Preliminary restoration approval will require grading and seeding. Dominion is aware that should the use of this property change in the future, landscaping or screening of the wellhead and the tank battery may be required. No violations at this time.
1113221047 2008-10-31 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead and should TD the well later today. The pits are fenced, lined and in good condition.
1198210453 2008-11-12 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered. The well was fraced and the service rig was still on site flowing back the well. No violations at this time.
1509505921 2008-12-15 Production Wells No Violations The well has the required fencing and ID posted and has been turned on. Preliminary restoration will be due in the spring.
1798152943 2017-01-30 Storage Well No Violations At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were closed and locked. The well was fenced and locked. The tank battery still contained production equipment and consisted of one 100 BBL production tank, one 50 BBL poly brine tank, two mechanical separators, and a line heater. The valves on the separator were closed. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the tank battery. Lease access was stable. No violations at this time.
1843130628 2008-10-24 Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on location. The well will be spudded on 10/27.
2003453004 2008-11-19 Drill / Deepen / Reopen No Violations Wenger Pipeline is on site building the tank battery and installing the flowline and the salesline. The well should be ready to turn on early next month.
667361189 2019-2-20 0:00: SO No Violations 0.50
729562473 2020-6-25 0:00: SO No Violations 5.00
907056654 2018-3-15 0:00: SO No Violations 0.50

For data sources see[9]