34-153-23067

Well Details

Well ID: 34-153-23067
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: DOMINION EAST OHIO
Well Pad ID:
Farm/Lease Name: DEO UNIT
License Status: Storage Well
License Date: 2014-03-05
Spud Date: 2008-12-15
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-12-19
Well Total Depth: 4206.00 ft
Configuration: Vertical
Latitude: 40.940000
Longitude: -81.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-10-20 Proposed Formations:CLINTON, Issued Date:10/20/2008, Expired Date:10/20/2009 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-12-19
Completion Report Received 2009-01-29
Change of Owner 2010-04-30 Operator changed from 8321, DOMINION EXPL& PROD INC to 8632, DOMINION FIELD SERVICES INC
Change of Owner 2014-02-20 Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO
APP 2014-03-05 Proposed Formations:CLINTON, Issued Date:3/5/2014, Expired Date:3/4/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class:
Construction Permit Expires 2015-03-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-03-11 3937 4008 34
3937 4008 34
3937 4008 34

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 0 587 Mscf 67956 FRAC ALSO USED 1815 BBLS WATER

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 DOMINION EXPL& PROD INC 40189.00 5777.00 332
2010 DOMINION FIELD SERVICES INC 30590.00 3746.00 365
2011 DOMINION EAST OHIO 23259.00 2406.00 365
2012 DOMINION FIELD SERVICES INC 21802.00 2472.00 366
2013 DOMINION FIELD SERVICES INC 16493.00 1647.00 355

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 DOMINION EXPL& PROD INC Brine 417 332
2010 DOMINION FIELD SERVICES INC Brine 140 365
2011 DOMINION EAST OHIO Brine 0 365
2012 DOMINION FIELD SERVICES INC Brine 268 366
2013 DOMINION FIELD SERVICES INC Brine 123 355

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1323498027 2019-1-16 0:00: SO No Violations 0.50
-1487977358 2009-1-21 0:00: DD No Violations
-1748277296 2018-2-15 0:00: SO No Violations 0.50
-854882055 2014-12-26 0:00 UP No Violations
-875243062 2009-2-10 0:00: PW No Violations
-979669155 2009-4-8 0:00:0 PW No Violations
0471088939 2009-08-05 Preliminary Restoration No Violations Preliminary restoration is approved.
0854882055 2014-12-26 UrbanProduction Wells No Violations I was on location to conduct a status check of this well. The wellhead has a pump jack connected to it. The tank battery consists of three 140 BBL production tanks, a mechanical separator and a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on one of the 140 BBL production tanks. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found.
0875243062 2009-02-10 Production Wells No Violations W. Pol Contracting personnel were on site to connect and expand the tank battery with two additional 140 bbl stock tanks. The fencing and dike walls have been extended to accommodate the changes.
0979669155 2009-04-08 Production Wells No Violations Fences are up, identification is posted and the well is in production.
1206955571 2008-12-08 Drill / Deepen / Reopen No Violations The drilling location has been constructed and waiting for the rig which should arrive within the week. The location of the lease road has changed from what was proposed during the pre-permit inspection. A revised drawing will need to be submitted to Columbus.
1230585670 2008-12-16 Drill / Deepen / Reopen No Violations Wildcat is drilling surface hole. The pits are lined and in good condition. Wildcat placed road mat in the floor of the blow pit for added liner protection. The surface job should be up later today.
1230661738 2008-12-18 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead and should reach TD later tonight. The pits are fenced, lined and in good condition.
1230670832 2008-12-29 Drill / Deepen / Reopen No Violations Chem Tech is on site to start solidifying the drilling pits.
1231093210 2008-12-30 Drill / Deepen / Reopen No Violations Chemtech and Daley Excavating are on site to finish solidifying the drilling pits.
1232135828 2009-01-13 Drill / Deepen / Reopen No Violations The well is being fraced by Halliburton. The pits ahev been solidified and covered over.
1234360240 2009-01-29 Drill / Deepen / Reopen No Violations Waiting for turn on.
1323498027 2019-01-16 Storage Well No Violations My inspection found the well is equipped with a pumpjack. The diked tank battery consists of two steel tanks, a plastic brine tank, a meter run, a vertical and horizontal separator. The well is legibly identified. No compliance issues are cited at this time.
1487977358 2009-01-21 Drill / Deepen / Reopen No Violations The tank battery is under construction and should be completed in the next week. The well will be turned on as soon as the required fencing and identification are in place.
1748277296 2018-02-15 Storage Well No Violations I did a status check inspection for this storage well. The well is equipped with a pumpjack. The diked tank battery consists of two steel tanks, a plastic brine tank, a horizontal separator and a meter. The well and tank battery are fenced in with locked gates. The well is legibly identified. No compliance issues are cited at this time.
1956015796 2017-01-26 Storage Well No Violations At the time of this inspection, the well was still equipped with an electric motor on a pumpjack. The valves on the wellhead were open. The well was fenced and locked. The tank battery equipment was still present and consisted of two 100 BBL production tanks, one 50 BBL poly brine tank, a mechanical separator and a line heater. The valves on the separator were open. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the tank battery. Lease access was stable. No violations at this time.
471088939 2009-8-5 0:00:0 PL No Violations

For data sources see[9]

References