X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23076

Well Details

Well ID: 34-153-23076
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: DOMINION EAST OHIO
Well Pad ID:
Farm/Lease Name: SMITH
License Status: Storage Well
License Date: 2014-03-04
Spud Date: 2009-04-27
Spud Drilling Contractor: WHIPSTOCK OHIO DRILLING
Final Drill Date: 2009-05-01
Well Total Depth: 3990.00 ft
Configuration: Vertical
Latitude: 40.930000
Longitude: -81.630000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-03-18 Proposed Formations:CLINTON, Issued Date:3/18/2009, Expired Date:3/18/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2009-04-21 Proposed Formations:CLINTON, Issued Date:4/21/2009, Expired Date:4/21/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-05-01
Completion Report Received 2009-10-09
Change of Owner 2010-04-30 Operator changed from 8321, DOMINION EXPL& PROD INC to 8632, DOMINION FIELD SERVICES INC
Change of Owner 2014-02-20 Operator changed from 8632, DOMINION FIELD SERVICES INC to 240, DOMINION EAST OHIO
APP 2014-03-03 Proposed Formations:CLINTON, Issued Date:3/3/2014, Expired Date:3/2/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class:
APP 2014-03-04 Proposed Formations:CLINTON, Issued Date:3/4/2014, Expired Date:3/3/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class:
Construction Permit Expires 2015-03-04
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-01-04 3745 3814 23
3745 3814 23
3745 3814 23

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 1826 Bbl 65387 616M SCF NITROGEN ASSIST

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 DOMINION EXPL& PROD INC 29117.00 32.00 210
2010 DOMINION FIELD SERVICES INC 22068.00 67.00 365
2011 DOMINION EAST OHIO 18303.00 0.00 365
2012 DOMINION FIELD SERVICES INC 20120.00 80.00 366
2013 DOMINION FIELD SERVICES INC 11638.00 51.00 355

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 DOMINION EXPL& PROD INC Brine 70 210
2010 DOMINION FIELD SERVICES INC Brine 85 365
2011 DOMINION EAST OHIO Brine 0 365
2012 DOMINION FIELD SERVICES INC Brine 95 366
2013 DOMINION FIELD SERVICES INC Brine 41 355

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-155590550 2009-6-16 0:00: PW No Violations
-80379980 2020-6-26 0:00: SO No Violations 0.50
0155590550 2009-06-16 Production Wells No Violations The affected area has been graded, seeded and mulched. The well is in production and the required fencing and identification are in place.
0268042901 2014-12-26 UrbanProduction Wells No Violations I was on location to conduct a status check of this well. The well is of plunger lift construction. The tank battery consists of a 140 BBL production tank, mechanical separator and a 1500 gallon poly brine tank. The valves at the wellhead were open. The low pressure relief valve, spark arrestor and charcoal filter were installed on the 140 BBL production tank. The tank battery was diked. The fencing around the wellhead and tank battery is an 8 foot high chain link fence with green privacy slats and topped with three strands of barbed wire. The man doors to the tank battery and well were locked. The well is properly identified with a clear, legibly marked well identification sign. The lease road is stable and drivable. No violations found.
0452886449 2009-06-11 Production Wells No Violations The permanent chain link fence has been installed around both the tank battery and the wellhead and the identification sign is posted. The well has been turned on. Grading and seeding still need to occur before preliminary restoration is approved.
0829317766 2009-05-01 Drill / Deepen / Reopen No Violations Whipstock has reached TD and is running 4-1/2 casing. The pits are lined and in good condition. The rig will be moving on 5/2.
0959185874 2017-01-30 Storage Well No Violations At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were closed. The well was fenced and locked. The tank battery still contained production equipment and consisted of one 100 BBL production tank, one 50 BBL poly brine tank, a mechanical separator. The valves on the separator were closed. The tank battery was diked and fenced with a locked man door. The proper, legible signage was located at the tank battery. Lease access was stable. No violations at this time.
1239108785 2009-04-01 Drill / Deepen / Reopen No Violations Dailey Excavating was on site building the lease road. The drilling rig is scheduled to arrive within two weeks.
1435533454 2010-04-20 Preliminary Restoration No Violations Preliminary restoration is approved.
1676954967 2009-04-08 Drill / Deepen / Reopen No Violations The location has been built and Dominion has asked to move the well location to the north and west in order to set the rig on native material instead of fill. I advised them that the new location would need to be surveyed and a revised location submitted to Columbus.
1895702195 2009-05-06 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and are being covered over. No violations at this time.
1925001212 2009-06-02 Drill / Deepen / Reopen No Violations The tank battery has been built but has not been fenced. Dominion requested permission to install a temporary fence so that the well can be turned on. Permission was granted. The permanent fence should be installed within 7 to 10 days. The delay is due to the contractors schedule.
2047638605 2018-03-15 Storage Well No Violations I did a status check inspection for this storage well. The well is equipped with a plunger-lift system. The diked tank battery consists of a steel tank, a plastic brine tank, a horizontal separator, a vertical separator and two meters. The well is legibly. The well and tank battery are fenced in, gated and locked. No compliance issues are cited at this time.
268042901 2014-12-26 0:00 UP No Violations
452886449 2009-6-11 0:00: PW No Violations
829317766 2009-5-1 0:00:0 DD No Violations
929445872 2019-11-17 0:00 SO No Violations 0.40
959185874 2017-1-30 0:00: SO No Violations

For data sources see[9]

References