If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23091 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-81.44,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SUMMIT PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF HUDSON | |
License Status: Producing | |
License Date: 2009-08-05 | |
Spud Date: 2009-08-15 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2009-08-20 | |
Well Total Depth: 3973.00 ft | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -81.440000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-08-05 | Proposed Formations:CLINTON, Issued Date:8/5/2009, Expired Date:8/5/2010 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-08-20 | |
Completion Report Received | 2009-10-14 | |
Construction Permit Expires | 2010-08-05 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-01-05 | 3800 | 3870 | 44 |
3800 | 3870 | 44 | |
3800 | 3870 | 44 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 87000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | SUMMIT PETROLEUM INC | 0.00 | 457.00 | 69 |
2010 | SUMMIT PETROLEUM INC | 25808.00 | 869.00 | 365 |
2011 | SUMMIT PETROLEUM INC | 20914.00 | 393.00 | 365 |
2012 | SUMMIT PETROLEUM INC | 15978.00 | 294.00 | 366 |
2013 | SUMMIT PETROLEUM INC | 12099.00 | 191.00 | 365 |
2014 | SUMMIT PETROLEUM INC | 9710.00 | 195.00 | 366 |
2015 | SUMMIT PETROLEUM INC | 8214.00 | 178.00 | 365 |
2016 | SUMMIT PETROLEUM INC | 7530.00 | 169.00 | 365 |
2017 | SUMMIT PETROLEUM INC | 6842.00 | 140.00 | 365 |
2018 | SUMMIT PETROLEUM INC | 6242.00 | 140.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | SUMMIT PETROLEUM INC | Brine | 3052 | 69 |
2010 | SUMMIT PETROLEUM INC | Brine | 485 | 365 |
2011 | SUMMIT PETROLEUM INC | Brine | 175 | 365 |
2012 | SUMMIT PETROLEUM INC | Brine | 169 | 366 |
2013 | SUMMIT PETROLEUM INC | Brine | 111 | 365 |
2014 | SUMMIT PETROLEUM INC | Brine | 104 | 366 |
2015 | SUMMIT PETROLEUM INC | Brine | 89 | 365 |
2016 | SUMMIT PETROLEUM INC | Brine | 107 | 365 |
2017 | SUMMIT PETROLEUM INC | Brine | 76 | 365 |
2018 | SUMMIT PETROLEUM INC | Brine | 77 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-200235089 | 2010-4-21 0:00: | PW | No Violations | |
-2134578777 | 2009-8-18 0:00: | DD | No Violations | |
-43825187 | 2009-10-7 0:00: | PW | No Violations | |
-569983321 | 2009-8-16 0:00: | DD | No Violations | |
0043825187 | 2009-10-07 | Production Wells | No Violations | The well is now in production. The required identification and fencing are in place. The site has been rough graded and will need more grading before seed and mulch. |
0200235089 | 2010-04-21 | Production Wells | No Violations | This preliminary restoration inspection found that the site has been graded, seeded and is starting to grow. Restoration can be approved as soon as the grass has established and filled in the affected area more completely. |
0569983321 | 2009-08-16 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection. There were no violations at this time. |
1280366244 | 2010-07-23 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1582601982 | 2009-08-16 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 5/8 casing. There were no violations at this time. |
2134578777 | 2009-08-18 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is drilling ahead. The pits are fenced and lined and in good condition. |
For data sources see[9]