If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23125 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Richfield Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: MATA UNIT | |
License Status: Producing | |
License Date: 2011-01-28 | |
Spud Date: 2011-04-12 | |
Spud Drilling Contractor: | |
Final Drill Date: 2011-04-17 | |
Well Total Depth: 3816.00 ft | |
Configuration: Vertical | |
Latitude: 41.260000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-01-28 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:1/28/2011, Expired Date:1/27/2013 12:00:00 PM, Drilling unit acres:36.79, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-04-17 | |
Completion Report Received | 2011-06-07 | |
Construction Permit Expires | 2012-01-28 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-08-12 | 3536 | 3579 | 71 |
3536 | 3579 | 71 | |
3536 | 3579 | 71 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-05-10 | H2O | 15 | 93065 Gal | 60000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 100.00 | 15 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 4875.00 | 2393.00 | 330 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 15521.00 | 3506.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 19673.00 | 2718.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 10099.00 | 1301.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 8494.00 | 891.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 7010.00 | 1047.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 6866.00 | 820.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 40 | 15 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 149 | 330 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 220 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 162 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 68 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 30 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1151620772 | 2011-4-21 0:00: | UD | No Violations | |
-1513241530 | 2011-5-10 0:00: | UD | No Violations | |
-1820054244 | 2011-7-13 0:00: | UD | No Violations | |
-1906505944 | 2011-4-25 0:00: | UD | No Violations | |
-458077968 | 2011-11-30 0:00 | UL | No Violations | |
-547636434 | 2011-4-28 0:00: | UD | No Violations | |
0167006008 | 2011-06-20 | Urban Drill / Deepen / Reopen | No Violations | The well has been fraced and the tank battery is under construction. Ohio Valley is also starting to work on reclamation. No violations at this time. |
0458077968 | 2011-11-30 | UrbanPreliminary Restoration | No Violations | Preliminary Restoration is approved. |
0547636434 | 2011-04-28 | Urban Drill / Deepen / Reopen | No Violations | Dons Excavating and Chem Tech were on site to solidify the drilling pits. Chem Tech placed one load of dust (approximately 22 tons) into each pit. After mixing, Dons Excavating covered each pit with available subsoil. |
1151620772 | 2011-04-21 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is still on location and rigging down. Pit solidification and closure is scheduled for 4/25. |
1313596774 | 2011-08-08 | Preliminary Restoration | No Violations | The site has been graded, seeded and mulched. Preliminary restoration will be approved if the vegetation establishes. The tank battery is under construction and needs to be fenced. |
1318361417 | 2011-04-12 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving on location and will spud the well later this afternoon. No violations at this time. |
1470129350 | 2011-09-20 | Urban Drill / Deepen / Reopen | No Violations | The majority of the affected area has been graded, seeded and mulched. A small area west of the tank battery still needs attention and the salesline/houseline excavation trenches need graded, seeded and mulched. According to OVE, the landowner is being paid to repair the parking lot and plant any trees that he may want on the lot. |
1513241530 | 2011-05-10 | Urban Drill / Deepen / Reopen | No Violations | Producers Service Corporation was on site to frac the well. The frac data will be submitted in the completion module of RBDMS. |
167006008 | 2011-6-20 0:00: | UD | No Violations | |
1820054244 | 2011-07-13 | Urban Drill / Deepen / Reopen | No Violations | Preliminary restoration is due soon and work still needs to be done to satisfy the restoration requirements. I talked to Ted Hill and Ben Funderberg about finishing the work as soon as possible. They both agreed that the work needs to be done and will be done. |
1906505944 | 2011-04-25 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling equipment is still on site. Pit solidification has been postponed until April 28. The pits have been pumped down and have sufficient freeboard. No violations at this time. |
2092036575 | 2015-03-18 | UrbanProduction Wells | No Violations | I inspected the Matta #1 well on 3/18/2015. The well is operated as a plunger lift well with 1.5 tubing inside of 4.5 production casing. The tubing pressure was 340 psi. with the 4.5 casing being 400 psi.. There are three (3) domestic house taps connected to the well. The well head was leak free. The well head is fenced with plank on plank fencing and was secured with a lock. The required signage was on the well fencing. The tank battery consists of a 140 barrel oil tank, 25 barrel poly brine, a 2408 horizontal mechanical separator and a DOM/EOG meter station. The load lines were locked and secure with flat plugs. I spoke with Ted Hill ( OVE ) to have a small amount of oil residue removed. All other fittings and equipment was free of leaks. The tank battery is surounded by an earthen dike and is fenced with plank on plank fencing. All locks were in place and working. The required I.D. signage was in place and legible. No violations were identified during this inspection. |
For data sources see[9]