If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-60189 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.93,"lon":-81.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: DOMINION EAST OHIO | |
Well Pad ID: | |
Farm/Lease Name: YAGER | |
License Status: Final Restoration | |
License Date: 2004-03-30 | |
Spud Date: 1929-11-21 | |
Spud Drilling Contractor: | |
Final Drill Date: 1930-04-27 | |
Well Total Depth: 4145.00 ft | |
Configuration: Vertical | |
Latitude: 40.930000 | |
Longitude: -81.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1929-11-21 | STORAGE, QUAD=MASSILLON FDT & PF = WH. |
Completed | 1930-04-27 | STORAGE, QUAD=MASSILLON FDT & PF = WH. |
Reached Total Depth | 1930-04-27 | STORAGE, QUAD=MASSILLON FDT & PF = WH. |
APP | 2004-03-30 | Proposed Formations:CLINTON, Issued Date:3/30/2004, Expired Date:3/30/2005 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SO, Proposed Well Class: |
Plugged/Abandoned | 2004-07-09 | STORAGE, QUAD=MASSILLON FDT & PF = WH. |
Construction Permit Expires | 2005-03-30 | STORAGE, QUAD=MASSILLON FDT & PF = WH. |
Record Last Modified | 2017-02-15 | STORAGE, QUAD=MASSILLON FDT & PF = WH. |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 60 Qts | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | DOMINION EAST OHIO | 0.00 | 0.00 | 0 |
2003 | DOMINION EAST OHIO | 0.00 | 0.00 | 0 |
2004 | DOMINION EAST OHIO | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | DOMINION EAST OHIO | Brine | 0 | 0 |
2003 | DOMINION EAST OHIO | Brine | 0 | 0 |
2004 | DOMINION EAST OHIO | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1112201053 | 2005-03-24 | Final Restoration | No Violations | Final restoration is approved. |
1914424291 | 2004-07-28 | Plug / Plug Back | No Violations | Grouted well to surface using approximately 2 cubic yards of low density ready mix (cement, fly ash, and sand). Grout stayed up at surface. Job was witnessed by Tom, Scott Armstrong (both of Dominion East Ohio), and Gary Voltz (Huth Ready Mix & Supply). Took a photo and GPS the casing. Tom will tack weld a metal plate on the casing on Monday, August 2, 2004. |
For data sources see[8]