If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23492 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.8,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: J WELL SERVICE INC | |
Well Pad ID: | |
Farm/Lease Name: ACEE | |
License Status: Producing | |
License Date: 1992-11-12 | |
Spud Date: 1992-12-10 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1992-12-14 | |
Well Total Depth: 4627.00 ft | |
Configuration: Vertical | |
Latitude: 41.250000 | |
Longitude: -80.800000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1992-11-12 | 2651 D & L ENERGY INC GeoDate 11/12/92 |
Oil and Gas | 1992-11-12 | Issued Date 11/12/92 Expired Date 11/12/93 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04627 Proposed Drill Depth 04627 |
Original Spud | 1992-12-09 | |
Completed | 1992-12-14 | |
Reached Total Depth | 1992-12-14 | |
Completion Report Received | 1993-07-01 | |
Construction Permit Expires | 1993-11-12 | |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4383 | 4505 | 0 |
4383 | 4505 | 0 | |
2006-09-11 | 4386 | 4498 | 55 |
4386 | 4498 | 55 | |
4383 | 4505 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 8 | 500 Gal | 0 | FRAC W/96M GAL H20 & 100M# SAND | ||
H2O | 0 | 96000 Gal | 100000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | D & L ENERGY INC | 47958.00 | 331.00 | 250 |
1994 | D & L ENERGY INC | 62882.00 | 213.00 | 365 |
1995 | D & L ENERGY INC | 49977.00 | 0.00 | 365 |
1997 | BOCOR HOLDINGS, LLC | 1312.00 | 243.00 | 365 |
1998 | D & L ENERGY INC | 26066.00 | 45.00 | 365 |
1999 | D & L ENERGY INC | 18558.00 | 0.00 | 365 |
2000 | D & L ENERGY INC | 15470.00 | 0.00 | 365 |
2001 | D & L ENERGY INC | 16165.00 | 0.00 | 365 |
2002 | D & L ENERGY INC | 13697.00 | 0.00 | 365 |
2003 | D & L ENERGY INC | 10692.00 | 0.00 | 365 |
2004 | D & L ENERGY INC | 10905.00 | 0.00 | 365 |
2005 | D & L ENERGY INC | 7278.00 | 0.00 | 365 |
2006 | D & L ENERGY INC | 8567.00 | 0.00 | 365 |
2007 | D & L ENERGY INC | 7183.00 | 27.00 | 365 |
2008 | D & L ENERGY INC | 5031.00 | 0.00 | 306 |
2009 | D & L ENERGY INC | 3805.00 | 0.00 | 365 |
2010 | D & L ENERGY INC | 4725.00 | 0.00 | 365 |
2011 | D & L ENERGY INC | 3731.00 | 0.00 | 0 |
2012 | D & L ENERGY INC | 2510.00 | 0.00 | 365 |
2013 | D & L ENERGY INC | 2157.00 | 0.00 | 365 |
2014 | D & L ENERGY INC | 3697.00 | 0.00 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | 3287.00 | 0.00 | 358 |
2016 | BOBCAT WELL & PIPELINE LLC | 4468.00 | 0.00 | 361 |
2017 | BOBCAT WELL & PIPELINE LLC | 4104.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | D & L ENERGY INC | Brine | 89 | 250 |
1994 | D & L ENERGY INC | Brine | 59 | 365 |
1995 | D & L ENERGY INC | Brine | 36 | 365 |
1997 | D & L ENERGY INC | Brine | 0 | 365 |
1998 | D & L ENERGY INC | Brine | 0 | 365 |
1999 | D & L ENERGY INC | Brine | 0 | 365 |
2000 | D & L ENERGY INC | Brine | 0 | 365 |
2001 | D & L ENERGY INC | Brine | 0 | 365 |
2002 | D & L ENERGY INC | Brine | 0 | 365 |
2003 | D & L ENERGY INC | Brine | 0 | 365 |
2004 | D & L ENERGY INC | Brine | 0 | 365 |
2005 | D & L ENERGY INC | Brine | 0 | 365 |
2006 | D & L ENERGY INC | Brine | 0 | 365 |
2007 | D & L ENERGY INC | Brine | 0 | 365 |
2008 | D & L ENERGY INC | Brine | 0 | 306 |
2009 | D & L ENERGY INC | Brine | 0 | 365 |
2010 | D & L ENERGY INC | Brine | 0 | 365 |
2011 | D & L ENERGY INC | Brine | 0 | |
2012 | D & L ENERGY INC | Brine | 0 | 365 |
2013 | D & L ENERGY INC | Brine | 0 | 365 |
2014 | D & L ENERGY INC | Brine | 0 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 358 | |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 361 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 25 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-116598356 | 2016-11-28 0:00 | UP | No Violations | 0.50 |
0116598356 | 2016-11-28 | UrbanProduction Wells | No Violations
-3587, 2-3572 and 2-3607. I spoke with Dave Rice from Bobcat and told him to post new identification signs at the well and tank battery. The equipment on the site consists of the following:
| |
2027857545 | 2014-03-27 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of four, 100 barrel production tanks, a 75 barrel brine tank and four separators. The dike was slightly weathered; however, it meets containment requirements. Identification signs were posted on the fence at the tank battery and the well. Locked, chain link fences with barb wire surrounded the production equipment and well. There were bull plugs on all of the load lines. There was a 7 day production chart at the separator. The lease road was the factories paved driveway. The tank battery location was shared with permit numbers 2-3572, 2-3607, 2-3587. The well was placed into production prior to House Bill 278. |
2050093249 | 2004-02-25 | Preliminary Restoration | No Violations | Restoration approved . |
For data sources see[9]