If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23529 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-80.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: NCL NATURAL RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: SECHLER | |
License Status: Final Restoration | |
License Date: 2013-05-20 | |
Spud Date: 1993-08-31 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1993-09-03 | |
Well Total Depth: 4842.00 ft | |
Configuration: Vertical | |
Latitude: 41.150000 | |
Longitude: -80.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1993-07-15 | Issued Date 7/15/93 Expired Date 7/15/94 Acres 0103253 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04842 Proposed Drill Depth 04842 |
Original Spud | 1993-08-31 | |
Completed | 1993-09-03 | |
Reached Total Depth | 1993-09-03 | |
CO | 1993-10-21 | 1100 GM/DELPHI PACKARD ELEC. GeoDate 7/15/93 |
Completion Report Received | 1994-01-19 | |
CO | 1996-07-11 | 4884 EASTERN STATES OIL & GAS GeoDate 7/15/93 |
Change of Owner | 2005-06-07 | Operator changed from 4884, EASTERN STATES OIL & GAS INC to 7849, NCL NATURAL RESOURCES LLC |
APP | 2013-05-20 | Proposed Formations:CLINTON, Issued Date:5/20/2013, Expired Date:5/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2013-08-09 | |
Construction Permit Expires | 2015-05-20 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4572 | 4712 | 0 |
4572 | 4712 | 0 | |
2006-09-11 | 4604 | 4648 | 74 |
4604 | 4648 | 74 | |
4572 | 4712 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 83650 Gal | 60000 | |||
ACID | 25 | 350 Gal | 0 | FRAC W/83,650 GAL H20 & 60M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1436842699 | 2004-1-16 0:00: | PL | No Violations | |
-1514430331 | 2013-8-9 0:00:0 | PB | No Violations | 3.00 |
-1795726432 | 2003-6-19 0:00: | PL | No Violations | 0.50 |
-403908431 | 2014-11-17 0:00 | FR | No Violations | 0.50 |
0403908431 | 2014-11-17 | Final Restoration | No Violations | I was on location for a final restoration. During my inspection, I found all of the production equipment was removed. The site was graded and vegetation was established. All debris was removed. Pits were not used during the plugging of the well. There was no lease road to restore; well was located next to a factory and access to the well was paved. Final restoration passed. |
0833902868 | 2013-08-08 | Plug / Plug Back | No Violations | I witnessed Nicks Well Plugging set the bottom plug for NCL. Nicks operator pumped on the well with 100 bbls of fresh water to circulate the rabbit out of the plunger lift unit. Next, 149 joints of 2.375 tubing were removed. The operator established circulation with fresh water. Nicks Well Plugging mixed and bull headed 25 sacks of Class A cement with 50 lbs. of Hulls. The well was shut-in at 1,500 psi. |
1436842699 | 2004-01-16 | Preliminary Restoration | No Violations | Restoration approved . |
1514430331 | 2013-08-09 | Plug / Plug Back | No Violations | Nicks Well Service ripped the 4.5 production casing at 3,254, then pulled 7 joints to set the Big Lime plug. The operator established circulation with 12 bbls of salt water, then pumped 86 sacks of Class A cement. The cement was displaced with approximately 43 bbls of salt water. Plug #2 was set from 2,690 to 2,990. Nick pulled 58 joints of casing to set the surface casing plug. Circulation was established with 15 bbls of fresh water, followed by 60 sacks of Class A cement. The cement was displaced with 5 bbls of fresh water. Plug #3 was set from 302 to 502. The operator pulled 7 joints of casing to set the surface plug. The operator established circulation and pumped 62 sacks of Class A cement. I witnessed a good cement returned to surface. The operator removed the final 5 joints and the cement was topped off at the surface. The cement was static at surface after 20 minutes. A total of 77 joints of 4.5 production casing and 149 joints of 2 tubing was removed from the well. |
1795726432 | 2003-06-19 | Preliminary Restoration | No Violations | Meets requirements for preliminary restoration. The tank battery consists of 1-100 bbl tank inside the dike. Onr separator outside the dike. |
833902868 | 2013-8-8 0:00:0 | PB | No Violations | 4.00 |
For data sources see[9]