X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-23583

Well Details

Well ID: 34-155-23583
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: FIRST ASSEMBLY OF GOD UNIT
License Status: Producing
License Date: 1995-03-16
Spud Date: 1995-03-27
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1995-04-05
Well Total Depth: 5472.00 ft
Configuration: Directional
Latitude: 41.250000
Longitude: -80.850000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1995-03-16 84 EVERFLOW EASTERN PTNS L P GeoDate 3/16/95
Oil and Gas 1995-03-16 Issued Date 3/16/95 Expired Date 3/15/96 Acres 0065490 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05472 Proposed Drill Depth 05472
Original Spud 1995-03-28 CHG TGT/COORDS 11-18-95
Completed 1995-04-05 CHG TGT/COORDS 11-18-95
Reached Total Depth 1995-04-05 CHG TGT/COORDS 11-18-95
Completion Report Received 1995-05-03 CHG TGT/COORDS 11-18-95
Construction Permit Expires 1996-03-15 CHG TGT/COORDS 11-18-95
Record Last Modified 2017-02-15 CHG TGT/COORDS 11-18-95

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5114 5298 0
5114 5298 0
2006-09-11 5147 5231 128
5147 5231 128
5114 5298 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 121750 Gal 100000 FRAC W/121,750 GAL H20 & 1000 SKS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1995 EVERFLOW EASTERN PARTNERS LP 25070.00 391.00 257
1996 EVERFLOW EASTERN PARTNERS LP 27903.00 674.00 365
1997 EVERFLOW EASTERN PARTNERS LP 21843.00 485.00 365
1998 EVERFLOW EASTERN PARTNERS LP 19389.00 331.00 365
1999 EVERFLOW EASTERN PARTNERS LP 17658.00 324.00 365
2000 EVERFLOW EASTERN PARTNERS LP 15882.00 165.00 365
2001 EVERFLOW EASTERN PARTNERS LP 12948.00 160.00 365
2002 EVERFLOW EASTERN PARTNERS LP 11514.00 85.00 365
2003 EVERFLOW EASTERN PARTNERS LP 12197.00 92.00 365
2004 EVERFLOW EASTERN PARTNERS LP 11093.00 0.00 365
2005 EVERFLOW EASTERN PARTNERS LP 10829.00 77.00 365
2006 EVERFLOW EASTERN PARTNERS LP 10211.00 80.00 365
2007 EVERFLOW EASTERN PARTNERS LP 11272.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 12008.00 83.00 365
2009 EVERFLOW EASTERN PARTNERS LP 10435.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 9589.00 0.00 365
2011 EVERFLOW EASTERN PARTNERS LP 12544.00 57.00 365
2012 EVERFLOW EASTERN PARTNERS LP 12081.00 63.00 366
2013 EVERFLOW EASTERN PARTNERS LP 9874.00 0.00 365
2014 EVERFLOW EASTERN PARTNERS LP 9098.00 0.00 365
2015 EVERFLOW EASTERN PARTNERS LP 9673.00 80.00 365
2016 EVERFLOW EASTERN PARTNERS LP 9673.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 7659.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 8367.00 80.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1995 EVERFLOW EASTERN PARTNERS LP Brine 206 257
1996 EVERFLOW EASTERN PARTNERS LP Brine 16 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 22 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 27 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1502121814 2015-2-24 0:00: UP No Violations 0.50
-21431144 2004-2-26 0:00: PL No Violations
-764001563 2003-7-25 0:00: PL No Violations 0.50
0021431144 2004-02-26 Preliminary Restoration No Violations Restoration approved .
0621082680 2012-10-31 UrbanProduction Wells No Violations I completed an urban production well inspection status check. My inspection found the well equipped with a plunger lift unit surrounded by a chain link fence and pine trees with the proper identification sign and located next to a white house on the church property. The tank battery was surrounded by a chain link fence with slats, a dike, and contained two, 100 barrel oil storage tanks, one, 50 barrel brine storage tank, two separators, and the proper identification sign. I noticed no visible spills or leaks. The lease road and tank battery was shared by 2-3415. There are no violations at this time.
0764001563 2003-07-25 Preliminary Restoration No Violations Meets requirements. The tank battery consists of 2-100 bbl storage tanks, 1-50 bbl salt water tank, 2-separators, diked and fenced. The tank battery is shared with the #1D-3415.
1502121814 2015-02-24 UrbanProduction Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift assembly. The tank battery consisted of two, 100 barrel production tanks, a 50 barrel brine tank and two, mechanical separators. A dike surrounded the tank battery. Identification signs were posted at the well and tank battery. There were plugs on the load lines. Locked, chain link fences with slats surrounded the tank battery and well. The lease road was part of the paved parking lot for the church. The well was placed into production prior to House Bill 278.
621082680 2012-10-31 0:00 UP No Violations 1.00

For data sources see[9]

References