If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23745 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: BULLHEAD POND UNIT | |
License Status: Producing | |
License Date: 2003-12-30 | |
Spud Date: 2004-02-25 | |
Spud Drilling Contractor: LANDOGS DRILLING | |
Final Drill Date: 2004-03-03 | |
Well Total Depth: 5037.00 ft | |
Configuration: Directional | |
Latitude: 41.250000 | |
Longitude: -80.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-05-03 | Proposed Formations:CLINTON, Issued Date:5/3/2002, Expired Date:5/3/2003 6:00:00 AM, Drilling unit acres:60.2, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2003-12-30 | Proposed Formations:CLINTON, Issued Date:12/30/2003, Expired Date:12/29/2004 6:00:00 AM, Drilling unit acres:60.06, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2004-02-25 | RBDMS Rec |
Completed | 2004-03-03 | RBDMS Rec |
Reached Total Depth | 2004-03-03 | RBDMS Rec |
Completion Report Received | 2004-04-06 | RBDMS Rec |
Correction to Well | 2004-05-07 | CHANGE IN TARGET INFORMATION: 496'NL & 305'WL OF LOT 20; X= 2,456,754 AND Y= 581,376. (SOURCE OF LOCATION: "AS DRILLED SURVEY"). |
Construction Permit Expires | 2004-12-29 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2004-06-09 | 4686 | 4806 | 0 |
4686 | 4806 | 0 | |
4686 | 4806 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2904 Bbl | 92000 | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PARTNERS LP | 881.00 | 0.00 | 91 |
2005 | EVERFLOW EASTERN PARTNERS LP | 10435.00 | 371.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 10831.00 | 82.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 8087.00 | 0.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 5553.00 | 0.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 8569.00 | 72.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 7523.00 | 26.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 7501.00 | 17.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 11614.00 | 34.00 | 366 |
2013 | EVERFLOW EASTERN PARTNERS LP | 10483.00 | 37.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 8900.00 | 13.00 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | 7333.00 | 0.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 8959.00 | 0.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 8172.00 | 0.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 8657.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | 1722 | 91 |
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 2569 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 2098 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 1817 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 1684 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 1995 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 1422 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 1541 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 1641 | 366 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 1905 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 1571 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 1385 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 1440 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 1304 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 1440 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1030614587 | 2013-1-28 0:00: | UP | No Violations | 0.50 |
-1730075083 | 2019-11-12 0:00 | UP | No Violations | |
0856713245 | 2016-07-18 | UrbanProduction Wells | No Violations
1 Production well | |
1030614587 | 2013-01-28 | UrbanProduction Wells | No Violations | My inspection found the well equipped with a pumping unit that was surrounded by a locked chain link fence. The tank battery was surrounded by a locked chain link fence and dike. It contained two, 50 barrel production tanks, one, 50 barrel brine tank, and a separator. The separator had a 7 day production chart. The lease road was in good, stable condition with a locked gate at the entrance. The production records were up to date in our database. The well was placed in production prior to House Bill 278. |
1098720252 | 2004-04-19 | Production Wells | No Violations | Case#04-007 ,Met with Jeff Cornelius [ Army corp. engineers ] Inspected site per per possible fill onto wetlands . NO VIOLATIONS . |
1140577122 | 2004-04-09 | Preliminary Restoration | No Violations | Check site per request from Tina Schroeder with Army Corp. of Engineers . Inspection showed drilling pits have been closed . Wellsite has been rough graded . Further inspection of area surrounding wellsite showed no violations . Contacted Tina Schoeder a |
856713245 | 2016-7-18 0:00: | UP | No Violations | 0.70 |
For data sources see[9]