If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23900 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-80.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Liberty Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: CITY OF GIRARD/LIBERTY MEMORIAL PARK | |
License Status: Producing | |
License Date: 2008-03-07 | |
Spud Date: 2008-05-20 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2008-05-28 | |
Well Total Depth: 5093.00 ft | |
Configuration: Vertical | |
Latitude: 41.150000 | |
Longitude: -80.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-03-07 | Proposed Formations:CLINTON, Issued Date:3/7/2008, Expired Date:3/7/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2008-05-28 | |
Completion Report Received | 2008-09-23 | |
Construction Permit Expires | 2009-03-07 | |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-11-03 | 4861 | 4926 | 66 |
4861 | 4926 | 66 | |
4861 | 4926 | 66 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 108000 Gal | 90000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | D & L ENERGY INC | 9.00 | 0.00 | 31 |
2009 | D & L ENERGY INC | 7870.00 | 1118.00 | 365 |
2010 | D & L ENERGY INC | 6103.00 | 482.00 | 365 |
2011 | D & L ENERGY INC | 7114.00 | 763.00 | 0 |
2012 | D & L ENERGY INC | 6381.00 | 501.00 | 365 |
2013 | D & L ENERGY INC | 4864.00 | 561.00 | 365 |
2014 | D & L ENERGY INC | 4152.00 | 374.00 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | 3031.00 | 383.00 | 360 |
2016 | BOBCAT WELL & PIPELINE LLC | 3083.00 | 308.00 | 349 |
2017 | BOBCAT WELL & PIPELINE LLC | 2805.00 | 296.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | D & L ENERGY INC | Brine | 0 | 31 |
2009 | D & L ENERGY INC | Brine | 433 | 365 |
2010 | D & L ENERGY INC | Brine | 151 | 365 |
2011 | D & L ENERGY INC | Brine | 330 | |
2012 | D & L ENERGY INC | Brine | 154 | 365 |
2013 | D & L ENERGY INC | Brine | 70 | 365 |
2014 | D & L ENERGY INC | Brine | 65 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 77 | 360 |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 66 | 349 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1716394272 | 2011-9-21 0:00: | PL | No Violations | |
-1753261929 | 2020-1-13 0:00: | UP | No Violations | 0.50 |
-383983550 | 2014-3-25 0:00: | UP | No Violations | 0.50 |
0383983550 | 2014-03-25 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank, and a separator. The dike met containment requirements. An identification sign was posted on the fence. Safety equipment was properly installed on the production tank. There was a 7 day production chart at the separator. There were locked, chain link fences with slats and barb wire surrounding the production equipment and well. The lease road was in stable condition. The well was placed into production prior to House Bill 278. |
1716394272 | 2011-09-21 | Preliminary Restoration | No Violations | Preliminary Restoration meets all requirements. |
For data sources see[9]