X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-23944

Well Details

Well ID: 34-157-23944
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Mill Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: HOOKER
License Status: Producing
License Date: 1983-11-03
Spud Date: 1984-03-01
Spud Drilling Contractor: CVAS DRLG
Final Drill Date: 1984-03-06
Well Total Depth: 5380.00 ft
Configuration: Vertical
Latitude: 40.390000
Longitude: -81.320000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1983-11-03 Issued Date 11/3/83 Expired Date 5/1/84 Acres 0048750 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05380 Proposed Drill Depth 05380
Original Spud 1984-03-01 CHG ACREAGE 11-24-84
Completed 1984-03-06 CHG ACREAGE 11-24-84
Reached Total Depth 1984-03-06 CHG ACREAGE 11-24-84
CO 1984-03-15 84 EVERFLOW EASTERN PTNS L P GeoDate 11/3/83
Completion Report Received 1984-03-29 CHG ACREAGE 11-24-84
Construction Permit Expires 1984-05-01 CHG ACREAGE 11-24-84
Record Last Modified 2017-02-15 CHG ACREAGE 11-24-84

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5208 5255 15
5208 5255 15
5208 5255 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 100000 Gal 60000 FRAC;WATER,SAND,N2
N2 0 179400 0 SCF N2.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PARTNERS LP 74092.00 529.00 365
1986 EVERFLOW EASTERN PARTNERS LP 26289.00 189.00 365
1987 EVERFLOW EASTERN PARTNERS LP 21875.00 180.00 365
1989 EVERFLOW EASTERN PARTNERS LP 14887.00 115.00 365
1990 EVERFLOW EASTERN PARTNERS LP 12673.00 88.00 365
1991 EVERFLOW EASTERN PARTNERS LP 15512.00 0.00 365
1992 EVERFLOW EASTERN PARTNERS LP 11636.00 0.00 365
1993 EVERFLOW EASTERN PARTNERS LP 11036.00 167.00 365
1994 EVERFLOW EASTERN PARTNERS LP 8163.00 0.00 365
1995 EVERFLOW EASTERN PARTNERS LP 8692.00 85.00 365
1996 EVERFLOW EASTERN PARTNERS LP 7943.00 0.00 365
1997 EVERFLOW EASTERN PARTNERS LP 7141.00 0.00 365
1998 EVERFLOW EASTERN PARTNERS LP 7600.00 0.00 365
1999 EVERFLOW EASTERN PARTNERS LP 5810.00 122.00 365
2000 EVERFLOW EASTERN PARTNERS LP 5357.00 0.00 365
2001 EVERFLOW EASTERN PARTNERS LP 5667.00 0.00 365
2002 EVERFLOW EASTERN PARTNERS LP 4933.00 0.00 365
2003 EVERFLOW EASTERN PARTNERS LP 6421.00 0.00 365
2004 EVERFLOW EASTERN PARTNERS LP 4942.00 115.00 365
2005 EVERFLOW EASTERN PARTNERS LP 5534.00 0.00 365
2006 EVERFLOW EASTERN PARTNERS LP 6189.00 0.00 365
2007 EVERFLOW EASTERN PARTNERS LP 5969.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 5763.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 4419.00 115.00 365
2010 EVERFLOW EASTERN PARTNERS LP 5478.00 0.00 365
2011 EVERFLOW EASTERN PARTNERS LP 5628.00 0.00 365
2012 EVERFLOW EASTERN PARTNERS LP 4775.00 58.00 366
2013 EVERFLOW EASTERN PARTNERS LP 4414.00 0.00 365
2014 EVERFLOW EASTERN PARTNERS LP 4201.00 39.00 365
2015 EVERFLOW EASTERN PARTNERS LP 4228.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 4739.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 4684.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 4341.00 48.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PARTNERS LP Brine 120 365
1986 EVERFLOW EASTERN PARTNERS LP Brine 75 365
1987 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1989 EVERFLOW EASTERN PARTNERS LP Brine 105 365
1990 EVERFLOW EASTERN PARTNERS LP Brine 75 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 75 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 35 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 38 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 35 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 12 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 22 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 22 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 23 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-558404304 2015-5-11 0:00: PW No Violations 1.00
0000PL2922 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0558404304 2015-05-11 Production Wells No Violations On the date of inspection I found production equipment to include a 210bbl tank, concrete brine vault, and a horizontal separator. The well is equipped with a gas plunger lift system, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch casing. The tubing valve is in open position. Identification is present at the well head and tank. Both the well head and the tank battery are fenced in and locked. Production records are current through 2014.
1023085975 2018-09-07 Production Wells No Violations Upon arrival on location, I witnessed the well was equipped with8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Chain link fence surrounded the well. Production equipment included a horizonal separator, a steel 210 barrel tank, a concrete vault, and a chart recorder with a 2 by .750 inch orifice plate within an earthen dike and chain link fence. The production report was up to date and proper identification was present.
PL2922 PL No Violations

For data sources see[9]

References