X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-24527

Well Details

Well ID: 34-169-24527
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: JAMES R SMAIL INC
Well Pad ID:
Farm/Lease Name: WEST HILL BAPTIST
License Status: Final Restoration
License Date: 2018-11-16
Spud Date: 1987-08-07
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1987-08-11
Well Total Depth: 3444.00 ft
Configuration: Vertical
Latitude: 40.820000
Longitude: -81.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1987-08-05 169 SMAIL JAMES R GeoDate 8/5/87
Oil and Gas 1987-08-05 Issued Date 8/5/87 Expired Date 8/4/88 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 03444 Proposed Drill Depth 03444
Original Spud 1987-08-07 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.
Completed 1987-08-11 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.
Reached Total Depth 1987-08-11 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.
Completion Report Received 1989-12-06 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.
APP 2018-11-16 Proposed Formations:CLINTON, Issued Date:11/16/2018, Expired Date:11/15/2020 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2019-01-18 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.
Record Last Modified 2019-06-08 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.
Construction Permit Expires 2020-11-15 UPDATE COORDINATES PER DOGRM SURVEYOR 1/15/19 ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3244 3320 0
3244 3320 0
2006-09-11 3264 3321 14
3264 3321 14
3244 3320 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 51000 Gal 40000 FRAC:WATER&SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 JAMES R SMAIL INC 8527.00 0.00 183
1989 JAMES R SMAIL INC 7975.00 0.00 365
1990 JAMES R SMAIL INC 5096.00 0.00 365
1991 JAMES R SMAIL INC 4265.00 0.00 365
1992 JAMES R SMAIL INC 3483.00 0.00 365
1993 JAMES R SMAIL INC 3062.00 0.00 365
1994 JAMES R SMAIL INC 1712.00 0.00 365
1995 JAMES R SMAIL INC 1845.00 0.00 365
1996 JAMES R SMAIL INC 1926.00 0.00 365
1997 JAMES R SMAIL INC 1044.00 0.00 365
1998 JAMES R SMAIL INC 1204.00 0.00 365
1999 JAMES R SMAIL INC 1400.00 0.00 365
2000 JAMES R SMAIL INC 1368.00 0.00 365
2001 JAMES R SMAIL INC 975.00 0.00 365
2002 JAMES R SMAIL INC 1249.00 0.00 365
2003 JAMES R SMAIL INC 988.00 0.00 365
2004 JAMES R SMAIL INC 707.00 0.00 365
2005 JAMES R SMAIL INC 1049.00 0.00 365
2006 JAMES R SMAIL INC 1218.00 0.00 365
2007 JAMES R SMAIL INC 561.00 0.00 365
2008 JAMES R SMAIL INC 543.00 0.00 365
2009 JAMES R SMAIL INC 437.00 0.00 365
2010 JAMES R SMAIL INC 635.00 0.00 365
2011 JAMES R SMAIL INC 669.00 0.00 365
2012 JAMES R SMAIL INC 605.00 0.00 366
2013 JAMES R SMAIL INC 501.00 0.00 365
2014 JAMES R SMAIL INC 510.00 0.00 365
2015 JAMES R SMAIL INC 562.00 0.00 365
2016 JAMES R SMAIL INC 527.00 0.00 365
2017 JAMES R SMAIL INC 524.00 0.00 365
2018 JAMES R SMAIL INC 142.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 JAMES R SMAIL INC Brine 60 183
1989 JAMES R SMAIL INC Brine 60 365
1990 JAMES R SMAIL INC Brine 0 365
1991 JAMES R SMAIL INC Brine 65 365
1992 JAMES R SMAIL INC Brine 25 365
1993 JAMES R SMAIL INC Brine 0 365
1994 JAMES R SMAIL INC Brine 0 365
1995 JAMES R SMAIL INC Brine 0 365
1996 JAMES R SMAIL INC Brine 0 365
1997 JAMES R SMAIL INC Brine 0 365
1998 JAMES R SMAIL INC Brine 80 365
1999 JAMES R SMAIL INC Brine 365
2000 JAMES R SMAIL INC Brine 365
2001 JAMES R SMAIL INC Brine 365
2002 JAMES R SMAIL INC Brine 0 365
2003 JAMES R SMAIL INC Brine 0 365
2004 JAMES R SMAIL INC Brine 75 365
2005 JAMES R SMAIL INC Brine 0 365
2006 JAMES R SMAIL INC Brine 0 365
2007 JAMES R SMAIL INC Brine 0 365
2008 JAMES R SMAIL INC Brine 0 365
2009 JAMES R SMAIL INC Brine 0 365
2010 JAMES R SMAIL INC Brine 0 365
2011 JAMES R SMAIL INC Brine 0 365
2012 JAMES R SMAIL INC Brine 0 366
2013 JAMES R SMAIL INC Brine 70 365
2014 JAMES R SMAIL INC Brine 0 365
2015 JAMES R SMAIL INC Brine 0 365
2016 JAMES R SMAIL INC Brine 0 365
2017 JAMES R SMAIL INC Brine 0 365
2018 JAMES R SMAIL INC Brine 25 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1986118611 2016-3-22 0:00: PW No Violations
-1999272139 2017-7-3 0:00:0 PW No Violations
00000PL235 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0610336446 2019-06-03 Final Restoration No Violations Performed final restoration inspection on 06/03/2019. No surface expression of the well was noted, nor any tanks, production equipment, or lease roads. Vegetation has re-established. No problems were noted at the time of the inspection. Final restoration passes.
0702981883 2016-10-19 Production Wells No Violations Inspected production well on 10/19/2016. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, and 1-underground brine vault, located within an earthen dike; the diked area is located within an unlocked metal fence. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, located within an unlocked metal fence. No problems were noted at the time of the inspection.
1986118611 2016-03-22 Production Wells No Violations Inspected production well on 03/22/2016. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, and 1-underground brine vault located within an earthen dike. The diked area is located within a locked metal fence. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor, located within an unlocked metal fence. No problems were noted at the time of the inspection.
1999272139 2017-07-03 Production Wells No Violations Inspected production well on 07/03/2017. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, 1-drip, and 1-underground brine vault, located within an earthen dike; the diked area is located within a locked metal fence. The well is equipped with a pump jack with an electric motor, and a drip tank, located within a locked metal fence. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
2064757902 2018-03-02 Production Wells No Violations Inspected production well on 03/02/2018. The tank battery consists of 1-100 bbl steel tank, 1-vertical separator, 1-drip, and 1-underground brine vault, located within an earthen dike; the diked area is located within a locked metal fence. The well is equipped with a pump jack with an electric motor, and a drip and regulator, located within a locked metal fence. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
610336446 2019-6-3 0:00:0 FR No Violations
702981883 2016-10-19 0:00 PW No Violations
PL235 PL No Violations

For data sources see[9]

References