37-003-22187

Well Details

Well ID: 37-003-22187
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: PENNECO OIL CO INC
Well Pad ID:
Farm/Lease Name: HANKEY UNIT 6H
License Status:
Spud Date:
Permit Date: 2011-05-16
Well Type: OIL
Unconventional Well: N
Configuration: Deviated Well
Conservation: No
Latitude: 40.514333
Longitude: -79.706389

For data sources see[1][2][3]

Well History

Date Event
2011-05-16 New Permit Application
2011-06-13 Performed Spud Operation
2011-08-02 Drilling Completion
2011-08-16 Perforation
2013-09-04 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 PENNECO OIL CO INC 7,897.00 92 130.20 92 0.00 0
2012 PENNECO OIL CO INC 20,871.00 366 117.86 366 0.00 0
2013 PENNECO OIL CO INC 14,620.00 365 103.87 365 0.00 0
2014 PENNECO OIL CO INC 12,231.00 365 76.79 365 0.00 0
2015 PENNECO OIL CO INC 9,647.75 365 69.82 31 0.00 0
2016 PENNECO OIL CO INC 7,836.47 366 0.00 0 0.00 0
2017 PENNECO OIL CO INC 6,647.00 365 86.11 365 0.00 0
2018 PENNECO OIL CO INC 5,528.31 365 36.69 30 0.00 0
2019 PENNECO OIL CO INC 4,872.46 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PENNECO OIL CO INC Fracing Fluid Waste 2,450.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Produced Fluid 160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 PENNECO OIL CO INC Drilling Fluid Waste 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 PENNECO OIL CO INC Drilling Fluid Waste 1,890.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PENNECO OIL CO INC Drilling Fluid Waste 960.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 PENNECO OIL CO INC Produced Fluid 356.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 PENNECO OIL CO INC Produced Fluid 246.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2013 PENNECO OIL CO INC Produced Fluid 246 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 35 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 PENNECO OIL CO INC Produced Fluid 35.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2016 PENNECO OIL CO INC Produced Fluid 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 PENNECO OIL CO INC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1983213 Primary Facility 2011-06-08 Drilling/Alteration No Violations Noted PAD BUILT FOR A SHALLOW HORIZONTAL OIL WELL.
1983776 Primary Facility 2011-06-14 Drilling/Alteration No Violations Noted CONDUCTOR IN AND CEMENTED IN THIS HORIZONTAL OIL WELL.
1983786 Primary Facility 2011-06-16 Drilling/Alteration No Violations Noted RIG DOWN FOR REPAIRS. SITE, PIT, E&S, AND ACCESS, OK.
1983787 Primary Facility 2011-06-24 Drilling/Alteration No Violations Noted RUNNING RODS TO RESUME DRILLING.
1983788 Primary Facility 2011-06-28 Drilling/Alteration No Violations Noted TD OF 7 7/8" HOLE IS 3392'. BIGGER RIG WILL MOVE IN ON 7/7/11.
1983789 Primary Facility 2011-06-15 Drilling/Alteration No Violations Noted RIG IDLE. PROBLEMS WIT THREADS ON CASING.
1985337 Primary Facility 2011-06-08 Routine/Complete Inspection No Violations Noted On June 8th , 2011 I conducted a routine inspection of the above site. The site was under construction but almost complete. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete.
1986504 Primary Facility 2011-06-14 Routine/Complete Inspection No Violations Noted On June 14th , 2011 I conducted a routine inspection of the above site. The rig was set up on site. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit was constructed. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1986608 Primary Facility 2011-06-24 Routine/Complete Inspection No Violations Noted On June 24th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. Water trucks were on site. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1991678 Primary Facility 2011-07-06 Drilling/Alteration No Violations Noted US ENERGY BIG RIG IS IN BUT NOT YET DRILLING THIS HORIZONTAL OIL AND GAS WELL.
1992021 Primary Facility 2011-07-06 Routine/Complete Inspection No Violations Noted On July 6th , 2011 I conducted a routine inspection of the above site. Drilling had started. The access road was in good condition. A Site ID and E&S plan were posted at the site. The next/bigger rig had moved in. E&S controls were in place. The pit appeared to be in good condition. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993478 Primary Facility 2011-07-26 Complaint Inspection No Violations Noted On July 26th , 2011 I conducted a routine inspection of the above site in response to a noise complaint. Drilling was occurring. The access road was in good condition. A Site ID and E&S plan were posted at the site. 12 frac tanks were at the site. E&S controls were in place. The pit appeared to be in good condition. A small slip was developing on the fill slope. Crews were on site to make repairs. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993497 Primary Facility 2011-08-03 Routine/Complete Inspection No Violations Noted On August 3rd , 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig was tearing down. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pit appeared to be in good condition. The silt sock required maintenance. The operator was contacted. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993503 Primary Facility 2011-08-04 Follow-up Inspection No Violations Noted On August 4th , 2011 I conducted a follow up inspection of the above site to check on repairs made to the silt sock surrounding the site. The necessary repairs had been completed. The rig had moved offsite. The access road was in good condition. A Site ID and E&S plan were posted at the site. E&S controls were in place. The pits appeared to be in good condition. Crews were cleaning the mud tanks. The operator should continue to inspect the E&S controls until site restoration is complete. No spills, leaks, or accelerated erosion were observed at the time of inspection.
1993798 Primary Facility 2011-07-26 Drilling/Alteration No Violations Noted RIG WORKING TO GET CORRECT ANGLE TO DRILL HORIZONTALLY IN THE SPEECHLY FORMATION.
1993803 Primary Facility 2011-07-18 Drilling/Alteration No Violations Noted HORIZONTAL OIL AND GAS WELL. TOP OF KOP IS 2492'. DRILLING 300' INTO CURVE.
1993812 Primary Facility 2011-07-13 Drilling/Alteration No Violations Noted HORIZONTAL OIL AND GAS WELL DRILLING AT 2600'. KOP IS 2492'
1998345 Primary Facility 2011-08-03 Drilling/Alteration No Violations Noted DRILLING COMPLETE AND THE RIG IS GONE.
1998347 Primary Facility 2011-08-05 Drilling/Alteration No Violations Noted THIS IS A HORIZONTAL OIL AND GAS WELL. THE RIG IS GONE.
2001758 Primary Facility 2011-08-16 Drilling/Alteration No Violations Noted HORIZONTAL OIL WELL.
2001797 Primary Facility 2011-08-29 Drilling/Alteration No Violations Noted RUNNING TUBING TO PUMP AIR TO CLEAN HOLE.
2001799 Primary Facility 2011-08-24 Drilling/Alteration No Violations Noted WELL IS COMPLETE AND FRACED. AFLARE STACK HAS BEEN SET, BUT IS NOT BURNING.
2035041 Primary Facility 2012-01-04 Routine/Complete Inspection No Violations Noted HORIZONTAL OIL WELL IS HOOKED UP. ANULUS IS OPEN. SITE IS RESTORED.
2054231 Primary Facility 2012-02-22 Routine/Complete Inspection No Violations Noted THIS IS A PRODUCING HORIZONTAL OIL AND GAS WELL.
2106083 Primary Facility 2012-10-04 Routine/Complete Inspection No Violations Noted John Ley WQS SWRO, was on site to complete a routine inspection. The well was equipped for production. Brine tank located onsite appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in on the access road or well-site. The site had at least 70% vegetation on the hillsides.
2464606 Primary Facility 2016-03-10 Incident- Response to Accident or Event Violation(s) Noted
2483885 Primary Facility 2016-05-11 Compliance Evaluation No Violations Noted
2678195 Primary Facility 2018-01-04 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tanks appear to be in sound condition.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2464606 754223 2016-03-10 2016-05-11 78.57(a) Environmental Health & Safety
2464606 754224 2016-03-10 2016-05-11 SWMA301 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
754223 340779 NOV - Notice of Violation 2016-05-11
754224 340779 NOV - Notice of Violation 2016-05-11

For data sources see[7]

References