If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22205 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.513358,"lon":-79.715014,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: BURTON UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-01-11 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Deviated Well | |
Conservation: No | |
Latitude: 40.513358 | |
Longitude: -79.715014 |
Date | Event |
---|---|
2012-01-11 | New Permit Application |
2012-06-14 | Performed Spud Operation |
2012-06-24 | Drilling Completion |
2012-07-23 | Perforation |
2013-09-05 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | 3,449.00 | 92 | 72.30 | 92 | 0.00 | 0 |
2013 | PENNECO OIL CO INC | 10,833.00 | 365 | 97.80 | 365 | 0.00 | 0 |
2014 | PENNECO OIL CO INC | 5,164.00 | 365 | 92.19 | 365 | 0.00 | 0 |
2015 | PENNECO OIL CO INC | 8,702.07 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNECO OIL CO INC | 8,948.62 | 366 | 120.38 | 31 | 0.00 | 0 |
2017 | PENNECO OIL CO INC | 8,184.00 | 365 | 33.29 | 365 | 0.00 | 0 |
2018 | PENNECO OIL CO INC | 7,153.85 | 365 | 63.21 | 60 | 0.00 | 0 |
2019 | PENNECO OIL CO INC | 6,945.25 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | PENNECO OIL CO INC | Drilling Fluid Waste | 570.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | PENNECO OIL CO INC | Produced Fluid | 1,189.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2012 | PENNECO OIL CO INC | Fracing Fluid Waste | 1,310.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2013 | PENNECO OIL CO INC | Produced Fluid | 637 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2013 | PENNECO OIL CO INC | Produced Fluid | 637.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 2,313.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2014 | PENNECO OIL CO INC | Produced Fluid | 2,313.00 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 659 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2015 | PENNECO OIL CO INC | Produced Fluid | 659.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 91 Bbl | CENT WASTE TRT FAC NPDES | PA0095443 |
2016 | PENNECO OIL CO INC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | PENNECO OIL CO INC | Produced Fluid | 91.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 |
2017 | PENNECO OIL CO INC | Produced Fluid | 32.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | PENNECO OIL CO INC | Produced Fluid | 126.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | PENNECO OIL CO INC | Produced Fluid | 80.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | PENNECO OIL CO INC | Produced Fluid | 148.67 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3177 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2052685 | Primary Facility | 2012-02-29 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. TOP HOLE RIG IS GONE. |
2054239 | Primary Facility | 2012-02-22 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLING TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL. |
2054293 | Primary Facility | 2012-03-06 | Drilling/Alteration | No Violations Noted | US ENERGY DRILLED TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL. |
2054300 | Primary Facility | 2012-02-16 | Drilling/Alteration | No Violations Noted | US ENERGY RIG DRILLED INTO OPEN MINE AT 6OO'. |
2055030 | Primary Facility | 2012-03-21 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. BIG RIG WILL FINISH. |
2064318 | Primary Facility | 2012-04-19 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. SITE IS CLEAN AND DOZED FOR BOTTOM HOLE RIG. |
2067389 | Primary Facility | 2012-04-27 | Drilling/Alteration | No Violations Noted | TOP HOLE IS COMPLETE. NO BOTTOM HOLE RI YET. |
2072476 | Primary Facility | 2012-05-21 | Drilling/Alteration | No Violations Noted | TOP HOLE IS COMPLETE. NO BIG RIG YET. THERE IS NO ACTIVITY AT THIS SITE. |
2074687 | Primary Facility | 2012-06-08 | Drilling/Alteration | No Violations Noted | CONTRACTOR EXPANDING SITE AND SPREADING STONE. BIG RIG WILL ARRIVE IN THE NEXT FEW DAYS. |
2078182 | Primary Facility | 2012-06-14 | Drilling/Alteration | No Violations Noted | LES WILSON RIG #25 WILL DRILL THE BOTTOM PORTION OF THIS SHALLOW, HORIZONTAL OIL WELL. |
2081745 | Primary Facility | 2012-07-03 | Routine/Complete Inspection | No Violations Noted | John Ley WQS SWRO was on site to conduct a site inspection. The site sign was properly displayed and the E&S plan was on site. The Erosion and Sediment Pollution Control Program Manual, pg. 30 states "Rock filters are not required where roadway surface is stabilized, ditches are provided with protective liners, and cut banks are stabilized." |
2085953 | Primary Facility | 2012-07-05 | Drilling/Alteration | No Violations Noted | DRILLING COMPLTE AND THE RIG IS GONE. TD @ 5008'. |
2085954 | Primary Facility | 2012-07-09 | Drilling/Alteration | No Violations Noted | DRILLING EQUIPTMENT IS GONE. THE SITE IS CLEAN. WATER IS BEING TRUCKED IN FOR THE FRAC JOB. |
2093434 | Primary Facility | 2012-08-02 | Drilling/Alteration | No Violations Noted | THIS HORIZONTAL OIL WELL HAS BEEN DRILLED AND FRACED. |
2106815 | Primary Facility | 2012-10-09 | Drilling/Alteration | No Violations Noted | DRILLING COMPLETE. WELL IS FRACED. A SERVICE RIG IS UP AND WORKING. SITE IN GOOD CONDITION. |
2116548 | Primary Facility | 2012-10-22 | Routine/Complete Inspection | No Violations Noted | JACK IS OPERATING. THE SITE IS IN GOOD SHAPE. TANKS ARE DIKED. |
2167324 | Primary Facility | 2013-05-13 | Routine/Complete Inspection | No Violations Noted | A HORIZONTAL OIL AND GAS WELL. THE TANKS ARE DIKED AND THE SITE IS RESTORED. |
2402699 | Primary Facility | 2015-08-19 | Routine/Complete Inspection | No Violations Noted | THIS GAS WELL HAS BEEN WELL MAINTAINED. THE PRODUCTION EQUIPTMENT IS IN GOOD CONDITION. |
2804704 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | This well and tanks are in good condition. The site and access have been maintained. The anulus is open. |
For data sources see[7]