If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-25980 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.584173,"lon":-79.506915,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Kiskiminetas Township | |
Operator Name: C & D GAS CO | |
Well Pad ID: | |
Farm/Lease Name: DONALD H MCKNIGHT 2 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 1998-07-06 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.584173 | |
Longitude: -79.506915 |
Date | Event |
---|---|
1998-07-06 | New Permit Application |
1999-04-10 | Performed Spud Operation |
1999-06-06 | Drilling Completion |
2000-01-24 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | C & D GAS CO | 562.50 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | C & D GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | C & D GAS CO | 841.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | C & D GAS CO | 1313.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | C & D GAS CO | 636.5 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | C & D GAS CO | 99.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | C & D GAS CO | 85.67 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | C & D GAS CO | 260.33 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | C & D GAS CO | 41.67 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | C & D GAS CO | 41.67 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | C & D GAS CO | 2,443.61 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | C & D GAS CO | 64.33 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | C & D GAS CO | 41.67 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1770916 | Primary Facility | 2009-02-19 | Routine/Complete Inspection | No Violations Noted | Drilling was completed on 06/06/99. Well appeared to be equipped for and in production. Noted areas on the well pad where it did not appear that the vegetative cover met the 70% uniform coverage criteria. Specifcally the cut slope above the well-site did not appear to have any vegetative cover nor was it stabilized with any other BMP. In addition erosion ruts were found on both the access road to the site and the shared portion of the access road approaching the township road. At this time the Department is requesting the operator forward documentation no later than 03/17/09 showing what actions have been/will be taken to address the issues noted in the above inspection. |
1796590 | Primary Facility | 2009-05-05 | Complaint Inspection | No Violations Noted | Drilling was completed on 06/06/99. Well appeared to be equipped for and in production. Noted areas on the well pad where it did not appear that the vegetative cover met the 70% uniform coverage criteria. Specifcally the cut slope above the well-site did not appear to have any vegetative cover nor was it stabilized with any other BMP. In addition erosion ruts were found on both the access road to the site and the shared portion of the access road approaching the township road. The work to rectify the vegetative cover & access road is to be completed by the end of May 2009 as outlined in previous correspondence from the operator in response to the 02/19/09 inspection. |
For data sources see[6]