If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-27786 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.804663,"lon":-79.393258,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Valley Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: I P BROWN 4 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2004-10-25 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.804663 | |
Longitude: -79.393258 |
Date | Event |
---|---|
2004-10-25 | New Permit Application |
2004-11-18 | Performed Spud Operation |
2004-11-20 | Drilling Completion |
2004-12-14 | Perforation |
2005-12-22 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2005 | CONSOL GAS CO | 28720 | 365 | 0.00 | 0 | 0.00 | 0 |
2006 | CONSOL GAS CO | 15857.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2007 | CONSOL GAS CO | 17096.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2008 | CONSOL GAS CO | 14213.96 | 365 | 0.00 | 0 | 0.00 | 0 |
2009 | CONSOL GAS CO | 13738.99 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 11,805.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 8,437.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 7,462.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 6,110.10 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 5,558.30 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 4,485.98 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 4,616.86 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 3,581.87 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 3,691.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2005 | CONSOL GAS CO | Brine | 75.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2006 | CONSOL GAS CO | Brine | 0.00 Bbl | Other | |
2010 | CONSOL GAS CO | Produced Fluid | 65.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CNX GAS CO LLC | Produced Fluid | 64.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2012 | CNX GAS CO LLC | Produced Fluid | 9.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2014 | CNX GAS CO LLC | Produced Fluid | 40.12 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2019 | ALLIANCE PETRO CO LLC | Produced Fluid | 35.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1398451 | Primary Facility | 2004-11-19 | Drilling/Alteration | No Violations Noted | ES/Pit ok. |
2368628 | Primary Facility | 2015-05-08 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. It was noted that the access road required routine maintenance of the access road erosion controls. Specifically what appeared to have been water bars and roadside ditches required regrading to prevent runoff from flowing down the road. Additionally a collection ditch implemented at the bottom of the cut slope for the well pad required maintenance as well to minimize the erosion and sedimenation generated from runoff leaving the site. |
2382763 | Primary Facility | 2015-06-25 | Routine/Complete Inspection | Violation(s) Noted | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Due to recent precipitation events and inaction by the operator after receipt of the 05/08/15 inspection report for this site that outlined the necessity of work to repair and maintain access road erosion controls the erosion controls have further deterioated. The erosion ditches that had begun to form are now significantly deeper and more sediment has been generated and transported off the road. At this time the neglect of the access road controls has resulted in a violations of PA Code 25, Chapter 102. |
2398987 | Primary Facility | 2015-08-17 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Operator had taken initial action to begin addressing the E&S issues previously outlined with the access road. The road had been regraded and the ditches and ruts had been removed. At this time the operator still needs to implement permanent erosion controls, i.e. ditches, culverts, outlets and/or rock stabilization to fully address the previously outlined violations and achieve compliance. |
2411749 | Primary Facility | 2015-10-01 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. Operator had taken initial action to begin addressing the E&S issues previously outlined with the access road. The road had been regraded and the ditches and ruts had been removed. WQS Higgins met onsite with operator and contractor representatives to review the necessary permanent erosion controls for the access road. |
2419508 | Primary Facility | 2015-10-27 | Compliance Evaluation | No Violations Noted | Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and it appeared to be in sound condition. All previously discussed and necessary access road erosion controls had been implemented and final stabilization meausres, i.e. rock, had been implemented. There was no observed acclerated erosion or sedimentation in relation to the site or access road. |
2539596 | Primary Facility | 2016-11-15 | Routine/Complete Inspection | No Violations Noted | Tank, tag, pumpjack, annulus closed. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2382763 | 726522 | 06/25/2015 | 2015-06-25 | 102.4(b)1 - EROSION AND SEDIMENT CONTROL REQUIREMENTS - Person conducting earth disturbance activity failed to implement and maintain E & S BMPs to minimize the potential for accelerated erosion and sedimentation. | Environmental Health & Safety | 102.11 |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
726522 | 324885 | NOV - Notice of Violation | Comply/Closed | 2015-11-04 |
For data sources see[7]