If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30119 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.672131,"lon":-79.621577,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Gilpin Township | |
Operator Name: US ENERGY EXPLORATION CORP | |
Well Pad ID: | |
Farm/Lease Name: L DILLER 1A | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2008-11-26 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.672131 | |
Longitude: -79.621577 |
Date | Event |
---|---|
2008-11-26 | New Permit Application |
2009-04-23 | Drilling Completion |
2009-04-27 | Performed Spud Operation |
2009-04-30 | Drilling Completion |
2009-05-07 | Perforation |
2009-09-10 | NEWLY DRILLED |
2009-10-30 | SKIDDED RIG |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | US ENERGY EXPLORATION CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | US ENERGY EXPLORATION CORP | 563.00 | 30 | 0.00 | 0 | 0.00 | 0 |
2010 | US ENERGY EXPLORATION CORP | 10,610.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2011 | US ENERGY EXPLORATION CORP | 4,865.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2012 | US ENERGY EXPLORATION CORP | 4,281.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2013 | US ENERGY EXPLORATION CORP | 3,738.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2014 | US ENERGY EXPLORATION CORP | 3,258.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | US ENERGY EXPLORATION CORP | 2,720.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | US ENERGY EXPLORATION CORP | 587.00 | 120 | 0.00 | 0 | 0.00 | 0 |
2017 | US ENERGY EXPLORATION CORP | 428.00 | 134 | 0.00 | 0 | 0.00 | 0 |
2018 | US ENERGY EXPLORATION CORP | 1,471.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1834955 | Primary Facility | 2009-10-09 | Routine/Complete Inspection | No Violations Noted | Drilling was completed on 04/30/09. Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. Observed that the well -site had been regraded and the vegetative cover appeared to meet the 70% uniform coverage criteria. Noted that the well pad and access road required further stabilization (i.e. clean durable rock) so as to minimize the amount of sediment generated and transported off the well site. |
1972712 | Primary Facility | 2011-05-13 | Site Restoration | No Violations Noted | Drilling was completed on 04/30/09. Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Observed no accelerated erosion or sedimentation related to the well-site or access road. Vegetative cover met the 70% uniform coverage criteria. |
For data sources see[6]