If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30140 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.92864,"lon":-79.649085,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Sugarcreek Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: MCELROY 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-12-22 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.928640 | |
Longitude: -79.649085 |
Date | Event |
---|---|
2008-12-22 | New Permit Application |
2009-10-23 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 357.12 | 92 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 4,378.61 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 1,691.82 | 304 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 2,313.23 | 305 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 1,466.88 | 304 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 1,335.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 1,085.77 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 1,608.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 1,360.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 966.99 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | DANNIC ENERGY CORP | 1,203.73 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1841166 | Primary Facility | 2009-11-03 | Drilling/Alteration | No Violations Noted | drilling/E&S ok/ID&pit ok |
1847590 | Primary Facility | 2009-11-16 | Routine/Complete Inspection | Violation(s) Noted | Well is drilled, but not equipped for production. The pit is still on-site and appears to be in sound condition. There are no E&S concerns at this time. However, the following deficiency was noted: |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1847590 | 577119 | 11/16/2009 | 2009-11-16 | 201E - Failure to comply with terms and conditions of permit | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
577119 | 253140 | NOV - Notice of Violation | Unresolvable | 2009-12-31 | |||
577119 | 262023 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-09-08 | 2010-09-08 | $4,000.00 | $4,000.00 |
For data sources see[6]