X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30164

Well Details

Well ID: 37-005-30164
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID:
Farm/Lease Name: MATTHEW ANTHONY 2-65
License Status:
Spud Date:
Permit Date: 2008-12-17
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.880279
Longitude: -79.554421

For data sources see[1][2][3]

Well History

Date Event
2008-12-17 New Permit Application
2009-06-14 Performed Spud Operation
2009-06-17 Drilling Completion
2009-08-04 Perforation
2009-11-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MDS ENERGY LTD 12,468.00 353 0.00 0 0.00 0
2011 MDS ENERGY LTD 9,010.00 353 0.00 0 0.00 0
2012 MDS ENERGY LTD 7,614.00 328 0.00 0 0.00 0
2013 MDS ENERGY LTD 6,694.00 340 0.00 0 0.00 0
2014 MDS ENERGY LTD 6,190.00 340 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 5,782.00 335 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 4,672.00 322 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 2,691.00 315 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 4,090.00 235 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MDS ENERGY LTD Produced Fluid 167.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 MDS ENERGY LTD Produced Fluid 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2015 MDS ENERGY DEV LLC Produced Fluid 61.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2015 MDS ENERGY DEV LLC Produced Fluid 61 Bbl CENT WASTE TRT FAC NPDES PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2041041 Primary Facility 2012-02-08 Routine/Complete Inspection No Violations Noted Drilling had been completed. Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no accelerated erosion or sedimentation observed in relation to the site or access road. Vegetative cover met the 70% uniform coverage criteria. It was noted that the access road was shared with an impoundment constructed for the well development activities associated with 005-30652 Matthew Anthony 3M-68 well.
2496650 Primary Facility 2016-06-23 Routine/Complete Inspection No Violations Noted Well was tagged and in production. Well head casing-pumpjack-equpment-grounded 100 bbl fiberglass tank ok.
2583436 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing-pumpjack-equipment-grounded 100 bbl fiberglass tank looked ok.

For data sources see[7]

References