If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30359 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.575874,"lon":-79.471428,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Kiskiminetas Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: C A WRIGHT 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-05-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.575874 | |
Longitude: -79.471428 |
Date | Event |
---|---|
2009-05-13 | New Permit Application |
2010-04-07 | Performed Spud Operation |
2010-04-14 | Drilling Completion |
2010-04-21 | Perforation |
2010-12-02 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 17,876.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | CONSOL GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CNX GAS CO LLC | 10,862.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 8,404.63 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 8,212.75 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 8,893.86 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 7,005.87 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 5,336.90 | 274 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 2,993.26 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | ALLIANCE PETRO CO LLC | 8,712.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CONSOL GAS CO | Fracing Fluid Waste | 200.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CONSOL GAS CO | Fracing Fluid Waste | 1,320.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CNX GAS CO LLC | Produced Fluid | 4.45 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2014 | CNX GAS CO LLC | Produced Fluid | 5.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015 | CNX GAS CO LLC | Produced Fluid | 55.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2015 | CNX GAS CO LLC | Produced Fluid | 55 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2016 | CNX GAS CO LLC | Produced Fluid | 1.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | CNX GAS CO LLC | Produced Fluid | 1 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1873848 | Primary Facility | 2010-03-31 | Routine/Complete Inspection | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Noted that the E&S plan located onsite outlined in the soils information that the seasonal high groundwater table rises to between 18 and 60 inches of the surface. The below grade pit located onsite was noted as being at least 20 feet below the original surface. In addition the gathering pipeline had been run up to the well pad, and it had compromised the outlet area for the collection and upslope diversion ditch. Spoke with operator representative Jeff Grove regarding both these matters. Mr. Grove stated that the encapsulation option will not be utilized at this site, and that he will be onsite 04/01/10 to evaluate the erosion control needs as a result of the pipeline work. |
1877867 | Primary Facility | 2010-04-19 | Routine/Complete Inspection | No Violations Noted | Drilling was completed, well had been equipped for production at the time of the inspection. Below grade pit still located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or site. The Department recommends that the operator reclaim the drill pit, dispose of the drill cuttings in accordance with Chapter 78, and begin restoration activities as soon as possible. |
1964047 | Primary Facility | 2011-04-07 | Site Restoration | No Violations Noted | Drilling completed on 04/14/10. Well appeared to be equipped for production at the time of the inspection. Brine tank located onsite and appeared to be in sound condition. Observed no erosion & sedimentation in relation to the access road or well-site. Vegetative cover met the 70% uniform coverage criteria. |
2215219 | Primary Facility | 2013-10-18 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2466921 | Primary Facility | 2016-03-22 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Annulus is open. Well head casing-equipment-100 bbl tank look ok. |
For data sources see[7]