37-005-30493

Well Details

Well ID: 37-005-30493
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Manor Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149232
Farm/Lease Name: RUTH ISEMAN UNIT 3H
License Status:
Spud Date:
Permit Date: 2009-10-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.745941
Longitude: -79.508110

For data sources see[1][2][3]

Well History

Date Event
2009-10-23 New Permit Application
2010-02-24 Performed Spud Operation
2010-04-13 Drilling Completion
2010-06-18 Perforation
2010-09-23 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2010 EXCO RESOURCES PA INC 216,404.00 83 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 383,844.00 273 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 318,233.00 366 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 265,175.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 225,141.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 220,144.05 365 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 196,235.00 366 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 174,585.00 365 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 155,431.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 141,488.00 363 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 EXCO RESOURCES PA INC Produced Fluid 256.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 EXCO RESOURCES PA INC Produced Fluid 390.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 EXCO RESOURCES PA INC Produced Fluid 2,783.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 835.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 EXCO RESOURCES PA INC Drilling Fluid Waste 767.50 Bbl INJECTION DISPOSAL WELL 34-155-23203
2011 EXCO RESOURCES PA INC Produced Fluid 218.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EXCO RESOURCES PA INC Produced Fluid 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 EXCO RESOURCES PA INC Produced Fluid 1,949.91 Bbl INJECTION DISPOSAL WELL 34-119-27350
2011 EXCO RESOURCES PA INC Produced Fluid 106.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 EXCO RESOURCES PA LLC Produced Fluid 1,075.59 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2012 EXCO RESOURCES PA LLC Produced Fluid 111.89 Bbl INJECTION DISPOSAL WELL 34-013-20611
2012 EXCO RESOURCES PA LLC Produced Fluid 217.10 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EXCO RESOURCES PA LLC Produced Fluid 178.17 Bbl INJECTION DISPOSAL WELL 34-119-27350
2012 EXCO RESOURCES PA LLC Produced Fluid 1,120.57 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 121.01 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 46.76 Bbl STORAGE PENDING DISPOSAL OR REUSE
2013 EXCO RESOURCES PA LLC Produced Fluid 2,165.99 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 1,622.91 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2015 EXCO RESOURCES PA LLC Produced Fluid 2,031.90 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 1,216.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 414.10 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EXCO RESOURCES PA LLC Produced Fluid 1,102.30 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC 711.50 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 200.40 Bbl REUSE (AT WELL PAD)
2017 EXCO RESOURCES PA LLC 200.40 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 103.50 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 EXCO RESOURCES PA LLC Produced Fluid 938.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 843.40 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1865803 Primary Facility 2010-02-25 Routine/Complete Inspection No Violations Noted Drill rig was located onsite at the time of the inspection. Two below grade pits were observed onsite. Both pits had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation with respect tot eh access road or well-site at the time of the inspection. Silt fence had been trenched in properly. Noted that the silt fence had not been implemented on contour below the well-site facing the UNT to Campbelll Run to the west of the well. The installation of silt fence in this way could result in the accumualtion of runoff to a single low point along the silt fence and thus compromise the fencing. In this instance a collection ditch with sediment trap may have been a more functional erosion control.
1869079 Primary Facility 2010-03-10 Routine/Complete Inspection No Violations Noted Drill rig was not located onsite at the time of the inspection. Two below grade pits were observed onsite. Both pits had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation with respect to the access road or well-site at the time of the inspection. Silt fence had been trenched in properly. Noted that the silt fence had not been implemented on contour below the well-site facing the UNT to Campbelll Run to the west of the well. The installation of silt fence in this way could result in the accumualtion of runoff to a single low point along the silt fence and thus compromise the fencing. In this instance a collection ditch with sediment trap may have been a more functional erosion control.
1870282 Primary Facility 2010-02-26 Drilling/Alteration Violation(s) Noted Incorrect cement on lead slurry of 13 3/8" casing
1871257 Primary Facility 2010-03-03 Drilling/Alteration No Violations Noted MARCELLUS - tophole completed to 1150ft - awaiting downhole rig/E&S ok/ID&pit ok
1872821 Primary Facility 2010-03-16 Drilling/Alteration No Violations Noted Patterson - UTI moving equipment on location
1872823 Primary Facility 2010-03-25 Drilling/Alteration No Violations Noted Contractor @ 1751' & dusting; Pit, E&S OK
1878109 Primary Facility 2010-04-20 Routine/Complete Inspection No Violations Noted Drill rig was in the process of being moved off-site. Below grade pit located onsite and it contained a minimal amount of fluids along with the drill cuttings. The pit had more than the required two feet of lined freeboard. Frac pits had been constructed, however they had not been lined. All erosion control BMP¿s appeared to have been installed correctly, and no accelerated erosion & sedimentation was observed in association with the access road or well-site. The pits and erosion control BMP¿s should continue to be monitored until well development is completed. The operator should also undertake site restoration activity as soon as possible after the completion of well development activities.
1878684 Primary Facility 2010-04-14 Drilling/Alteration No Violations Noted Drilling complete @ 12,100ft - cleaning hole/E&S ok/ID&pit ok
1878699 Primary Facility 2010-04-06 Drilling/Alteration No Violations Noted MARCELLUS - drilling horzontal @ 7200ft/E&S ok/ID&pit ok
1884096 Primary Facility 2010-05-13 Routine/Complete Inspection No Violations Noted Inspection performed as a follow-up to a report of a bentonite spill.
1888016 Primary Facility 2010-05-28 Routine/Complete Inspection No Violations Noted Site inspection performed in response to stream crossing and bentonite mud concerns expressed by the operator. Met onsite with EXCO reps Perry Lupinetti and Russ Lichty. Area of concern is the stream crossing of the pipeline on sheet 5 of the ESCGP-1 covering this project (ESX10-005-0001). All E&S controls outlined in the ESCGP-1 had been implemented properly, and the operator had implemented additional measures to prevent any bentonite mud from reaching the unnamed tributary (UNT) to Campbell Run. These additional measures appeared to be adequate to prevent any mud from entering the stream. No adverse effects were observed in the UNT. The operator should continue to monitor this site to insure that all e&s controls continue to function properly and to insure that any bentonite mud does not enter the UNT.
1958038 Primary Facility 2011-03-16 Routine/Complete Inspection No Violations Noted Drill rig had just been moved to the Lenape Heights from the Iseman well pad. R. Iseman 3H was tagged properly and equipped with a production unit, however due to drilling which had been ongoing for other wells on the well pad the well was not in production at the time of the inspection. Brine tanks located onsite and appeared to be in sound condition. Noted that there was a metal containment system in place around the tanks. Observed no accelerated erosion sedimentation in relaition to the site or access road. Specifically there was evidence of sediment transported off-site while moving the drill rig and ancillary equipment to the Lenape Heights well pad.
2042778 Primary Facility 2012-02-15 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2129283 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2203326 Primary Facility 2013-09-06 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite, with containment and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. Well stimulation impoundments were observed onsite and they had more than the required two feet of lined freeboard.
2252480 Primary Facility 2014-03-11 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP.
2325804 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well stimulation impoundments were in the process of being emptied and the liner systems removed.
2391371 Primary Facility 2015-07-21 Routine/Complete Inspection No Violations Noted Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2443908 Primary Facility 2016-01-27 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2496621 Primary Facility 2016-06-20 Routine/Complete Inspection No Violations Noted Well was tagged and in production. Well head casing-production set equipment-tank battery-dike ok.
2559069 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2695084 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H drilled and appears equipped for production. Wells 2H, 4H, and 5H also drilled and appear equipped for production.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1870282 583293 02/26/2010 2010-02-26 78.85 - Inadequate, insufficient, and/or improperly installed cement Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
583293 256102 NOV - Notice of Violation Comply/Closed 2010-04-10
583293 264106 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-09 2010-11-09 $3,825.00 $3,825.00

For data sources see[7]

References