Well Details

Well ID: 37-005-30572
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 146935
Farm/Lease Name: NBSC 1M-63
License Status:
Spud Date: 2010-04-30
Permit Date: 2010-03-29
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.775439
Longitude: -79.614147

For data sources see[1][2][3]

Well History

Date Event
2010-03-29 New Permit Application
2010-04-30 Performed Spud Operation
2010-05-04 Drilling Completion
2010-06-16 New Permit Application
2010-09-28 NEWLY DRILLED
2011-05-08 Drilling Completion
2011-05-20 Perforation
2013-05-20 DRILLED DEEPER

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2011 MDS ENERGY LTD 31,456.00 189 0.00 0 0.00 0
2012 MDS ENERGY LTD 38,969.00 363 0.00 0 0.00 0
2013 MDS ENERGY LTD 27,494.00 351 0.00 0 0.00 0
2014 MDS ENERGY LTD 23,236.00 356 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 18,075.00 323 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 13,948.00 280 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 17,959.00 351 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 12,402.00 338 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 13,292.00 358 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MDS ENERGY LTD Fracing Fluid Waste 216.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 MDS ENERGY LTD Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2011 MDS ENERGY LTD Produced Fluid 1,030.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2011 MDS ENERGY LTD Produced Fluid 4,909.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2011 MDS ENERGY LTD Produced Fluid 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 MDS ENERGY LTD Fracing Fluid Waste 4,880.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 MDS ENERGY LTD Fracing Fluid Waste 360.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011 MDS ENERGY LTD Produced Fluid 315.00 Bbl INJECTION DISPOSAL WELL 34-007-23262
2012 MDS ENERGY LTD Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 MDS ENERGY LTD Produced Fluid 83.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 MDS ENERGY LTD Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 MDS ENERGY LTD Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2013 MDS ENERGY LTD Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006
2015 MDS ENERGY LTD Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2019 MDS ENERGY DEV LLC Produced Fluid 144.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1883734 Primary Facility 2010-05-04 Drilling/Alteration No Violations Noted drilling/E&S ok/ID&pit ok
1887954 Primary Facility 2010-05-26 Routine/Complete Inspection No Violations Noted Well is drilled, but not equipped for production. Site ID sign and E&S plan located. Pit appears to be in sound condition. There are no E&S concerns at this time.
1993763 Primary Facility 2011-08-01 Administrative/File Review Viol(s) Noted & Immediately Corrected
2017541 Primary Facility 2011-10-27 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2081135 Primary Facility 2012-07-05 Site Restoration No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank located onsite appear to be in sound condition. The Department also notes that the site does not meet the 70% uniform vegetative coverage restoration criteria. The Department suggests the Operator continue to monitor the site to ensure the restoration criteria is met.
2137410 Primary Facility 2013-02-01 Routine/Complete Inspection No Violations Noted Ground was snow-covered during inspection making it difficult to determine if site has the required 70% uniform vegetative cover. No accelerated erosion or off-site transport of sediment was evident. Site was equipped for production. Brine tanks and production equipment appeared to be in good order. No leaks of production fluids were detected.
2165367 Primary Facility 2013-05-10 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located on-site and they appeared to be in sound condition. Site had been properly restored and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2480947 Primary Facility 2016-05-02 Routine/Complete Inspection No Violations Noted Well tagged-in production. Production set equipment- 2 grounded 100 bbl fiberglass tanks looked ok.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1993763 617091 08/01/2011 2011-08-01 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative
1993763 617093 08/01/2011 2011-08-01 212CMPLRPT - Failure to submit completion report within 30 days of completion of well Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
617091 274204 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-08-24 2011-08-24 $5,000.00 $5,000.00
617093 274204 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-08-24 2011-08-24 $5,000.00 $5,000.00

For data sources see[7]

References