Well ID: 37-005-30598
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID:
Farm/Lease Name: MILES E CLARK ET AL 1-10
License Status:
Spud Date:
Permit Date: 2010-04-01
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.804228
Longitude: -79.545289

For data sources see[1][2][3]

Well History

Date Event
2010-04-01 New Permit Application
2010-10-17 Performed Spud Operation
2010-10-21 Drilling Completion
2010-11-16 Perforation
2013-05-31 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MDS ENERGY LTD 960.00 21 0.00 0 0.00 0
2011 MDS ENERGY LTD 9,626.00 330 0.00 0 0.00 0
2012 MDS ENERGY LTD 4,296.00 324 0.00 0 0.00 0
2013 MDS ENERGY LTD 3,215.00 283 0.00 0 0.00 0
2014 MDS ENERGY LTD 2,962.00 326 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 2,230.00 353 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 1,418.00 290 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 1,338.00 184 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 471.00 316 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 663.00 293 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 MDS ENERGY LTD Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 MDS ENERGY LTD Fracing Fluid Waste 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 MDS ENERGY LTD Fracing Fluid Waste 600.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 MDS ENERGY LTD Produced Fluid 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1922232 Primary Facility 2010-10-19 Drilling/Alteration No Violations Noted Operator provided spud notification to begin as soon as 10/17/10. Dozer doing location prep at time of this inspection. Unlined pit on location.
1922269 Primary Facility 2010-10-20 Drilling/Alteration No Violations Noted Running 926¿ of 7¿ (17#/ft 0.231¿ wall) casing in 960¿ of 8 7/8¿ hole at time of inspection. Cement basket set @ 120¿.
1929382 Primary Facility 2010-11-22 Routine/Complete Inspection No Violations Noted Well was recently frac'd. Crew is currently on-site re-grading the well pad and repairing E&S controls. Site ID sign and E&S plan located. Spoke with operator representative Randy Morris. The E&S controls are being upgraded with the addition of hay bales to help stabilize the site.
2081139 Primary Facility 2012-07-05 Site Restoration No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and pump jack located onsite appear to be in sound condition. The Department notes that the brine tank associated with this well is located approximately 300 feet offsite nearest the access road entrance. The Brine tank appeared to be in sound condition. The Department also notes that the site is restored and meets the 70% uniform vegetative coverage criteria.
2137400 Primary Facility 2013-02-01 Routine/Complete Inspection No Violations Noted Site was lightly snow-covered at time of inspection. Site was equipped for production with brine tank located near access road on opposite side of valley from well head, pump jack, and other production equipment. All equipment appeared to be in good condition. No leaks of production fluid were noted. Site appeared to have been restored with 70% vegetative cover. No off-site transport of sediment was evident.