37-005-30625

Well Details

Well ID: 37-005-30625
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 147444
Farm/Lease Name: THOMAS D VASTINE ETUX 1-44
License Status:
Spud Date:
Permit Date: 2010-05-04
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.779917
Longitude: -79.542775

For data sources see[1][2][3]

Well History

Date Event
2010-05-04 New Permit Application
2010-05-12 Performed Spud Operation
2010-05-17 Drilling Completion
2011-02-25 New Permit Application
2011-06-21 Perforation
2012-10-26 DRILLED DEEPER
2013-05-31 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MDS ENERGY LTD 287.00 41 0.00 0 0.00 0
2011 MDS ENERGY LTD 36,420.00 164 0.00 0 0.00 0
2012 MDS ENERGY LTD 43,613.00 359 0.00 0 0.00 0
2013 MDS ENERGY LTD 28,385.00 353 0.00 0 0.00 0
2014 MDS ENERGY LTD 22,514.00 337 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 16,380.00 355 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 15,069.00 345 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 15,340.00 353 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 14,540.00 336 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 13,274.00 354 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MDS ENERGY LTD Fracing Fluid Waste 460.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011 MDS ENERGY LTD Produced Fluid 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011 MDS ENERGY LTD Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2011 MDS ENERGY LTD Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 525-1
2011 MDS ENERGY LTD Produced Fluid 9,954.00 Bbl INJECTION DISPOSAL WELL 34-133-22523
2011 MDS ENERGY LTD Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 MDS ENERGY LTD Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 MDS ENERGY LTD Produced Fluid 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1885019 Primary Facility 2010-05-14 Routine/Complete Inspection Violation(s) Noted Crews were on-site at the time of the inspection. Site ID and E&S plan located.
1887956 Primary Facility 2010-05-13 Drilling/Alteration No Violations Noted drilling/E&S inadequate - notified WQS/ID&pit ok
1887959 Primary Facility 2010-05-13 Drilling/Alteration No Violations Noted drilling/E&S being evaluated by WQS/ID&pit ok
1887961 Primary Facility 2010-05-14 Drilling/Alteration No Violations Noted drilling/E&S ok/ID&pit ok
1893445 Primary Facility 2010-06-02 Compliance Evaluation No Violations Noted CEI performed as a follow-up to a previously issued NOV.
2008613 Primary Facility 2011-10-06 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2009567 Primary Facility 2011-10-06 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Access road and site erosion controls had been implemented as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. A large frac pit was noted onsite located below the well pad. The pit appeared to contain flowback fluids and it had more than the required two feet of lined freeboard. The Department recommends that the operator endeavor to begin site reclamation activities as soon as possible or implement temporary erosion control measures that will insure minimization of accelerated erosion and sedimentation through the winter until the next growing season.
2039803 Primary Facility 2012-02-03 Routine/Complete Inspection Violation(s) Noted Drilling had been completed. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, however it had not been seeded & mulched or otherwise temporarily stabilized. In addition the access road as it crosses a small unamed drainage way does not have adequate erosion controls to minimize accelerated erosion or sedimentation. Specifically the dirt access road did not have any culverts, broad based dips or other erosion controls to break up total runoff, divert runoff off the access road, or othersie minimize sedement generation or transport. It was noted that the current access road enters the well area from a different direction than the road during well drilling and stimulation. Spoke with operator reprsentative Tyler Krukar via phone regarding the well site and the lack of access road erosion controls.
2044791 Primary Facility 2012-02-23 Follow-up Inspection Outstanding Violations - No Viols Req'd Drilling had been completed. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been regraded, however it had not been seeded & mulched or otherwise temporarily stabilized. The operator had begun to implement the access road erosion controls, specifically the culverts had clean durable rock placed at the inlets and outlets, and a rock lined turn out had been implemented on the hill side to convey runoff off of the access road.
2054523 Primary Facility 2012-03-28 Compliance Evaluation No Violations Noted Drilling had been completed. Well appeared to be equipped for production at the time of the inspection. Brine tanks located onsite and they appeared to be in sound condition. Site had been temporarily stabilized with mulch and it was noted vegetation had begun to grow over the majority of the well pad. The operator had also completed access road erosion control upgrades. The operator should continue to monitor the site for erosion issues and to insure that the 70% uniform coverage criteria is met.
2081138 Primary Facility 2012-07-05 Site Restoration No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank located onsite appear to be in sound condition. The Department also notes that the site is restored and meets the 70% uniform vegetative coverage criteria.
2366619 Primary Facility 2015-05-01 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimenation in relation to the access road.
2623703 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the access road.
2798101 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment and two grounded 100 bbl fiberglass fluid collection tanks look ok.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1885019 587171 05/14/2010 2010-05-14 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety The culverts were not properly stabilized which resulted in sediment entering culverts and eventually entering nearby stream.
1885019 587172 05/14/2010 2010-05-14 102.4INADPLN - E&S Plan not adequate Administrative The plan, as written, should have been adequate to control E&S. However, field changes were made to the plan that compromised the effectiveness of the plan.
1885019 587173 05/14/2010 2010-05-14 401 CSL - Discharge of pollutional material to waters of Commonwealth. Environmental Health & Safety There was a steady flow of sediment laden water exiting the culverts and entering directly into the stream.
1885019 587174 05/14/2010 2010-05-14 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety There was a steady flow of sediment laden water exiting the culvert and entering directly into the stream.
1885019 587175 05/14/2010 2010-05-14 691.401WPD - Failure to prevent sediment or other pollutant discharge into waters of the Commonwealth. Environmental Health & Safety There was a steady flow of sediemtn laden water exiting the culvert and entering directly into the stream.
2039803 631175 02/03/2012 2012-02-03 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
587171 257791 NOV - Notice of Violation Comply/Closed 2010-06-02
587171 261868 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-08-31 2010-08-31 $5,000.00 $5,000.00
587172 257791 NOV - Notice of Violation Comply/Closed 2010-06-02
587172 261868 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-08-31 2010-08-31 $5,000.00 $5,000.00
587173 257791 NOV - Notice of Violation Comply/Closed 2010-06-02
587173 261868 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-08-31 2010-08-31 $5,000.00 $5,000.00
587174 257791 NOV - Notice of Violation Comply/Closed 2010-06-02
587174 261868 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-08-31 2010-08-31 $5,000.00 $5,000.00
587175 257791 NOV - Notice of Violation Comply/Closed 2010-06-02
587175 261868 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-08-31 2010-08-31 $5,000.00 $5,000.00
631175 280178 NOV - Notice of Violation Comply/Closed 2012-03-28
631175 295546 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-03-21 2013-03-21 $4,000.00 $4,000.00

For data sources see[7]