Well ID: 37-005-30743
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 147038
Farm/Lease Name: BVL - SOLOSKI 5-249
License Status:
Spud Date:
Permit Date: 2010-12-09
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.808761
Longitude: -79.574847

For data sources see[1][2][3]

Well History

Date Event
2010-12-09 New Permit Application
2011-03-07 Performed Spud Operation
2011-03-16 Drilling Completion
2011-06-03 Perforation
2013-05-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2011 SNYDER BROS INC 20,687.00 89 0.00 0 0.00 0
2012 SNYDER BROS INC 42,070.00 362 0.00 0 0.00 0
2013 SNYDER BROS INC 27,715.00 361 0.00 0 0.00 0
2014 SNYDER BROS INC 20,619.00 352 0.00 0 0.00 0
2015 SNYDER BROS INC 15,186.00 348 0.00 0 0.00 0
2016 SNYDER BROS INC 12,468.00 357 0.00 0 0.00 0
2017 SNYDER BROS INC 12,152.00 359 0.00 0 0.00 0
2018 SNYDER BROS INC 11,030.00 331 0.00 0 0.00 0
2019 SNYDER BROS INC 9,117.00 349 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 SNYDER BROS INC Produced Fluid 285.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 SNYDER BROS INC Produced Fluid 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 SNYDER BROS INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2013 SNYDER BROS INC Produced Fluid 194.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 50.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2015 SNYDER BROS INC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1973553 Primary Facility 2011-05-17 Routine/Complete Inspection No Violations Noted Site ID sign and E&S plan located. Site construction underway. Earthmoving activities are being completed. The pit is excavated and lined. There are no E&S concerns on the access road or well site.
1973555 Primary Facility 2011-04-18 Routine/Complete Inspection No Violations Noted Site ID sign and E&S plan located. Site prep started, but not finished. No crews or equipment on-site. There are no E&S concerns on the access road or well site.
1976054 Primary Facility 2011-05-19 Drilling/Alteration No Violations Noted Well shut in on 4 1/2" x 2" swage.
2042402 Primary Facility 2012-02-10 Routine/Complete Inspection No Violations Noted Drilling was completed on 06/07/11. Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly regraded, seeded and mulched. The operator should monitor the site to insure that 70% uniform vegetative cover is achieved.
2473342 Primary Facility 2016-04-11 Site Restoration No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tank located onsite and it appeared to be in sound condition. The majority of the vegetation had attained 70% vegetative cover.

For data sources see[7]