If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31110 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.687342,"lon":-79.366311,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Plumcreek Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 145134 | |
Farm/Lease Name: GIRTY 591636 | |
License Status: Active | |
Spud Date: 2013-03-02 | |
Permit Date: 2012-12-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.687342 | |
Longitude: -79.366311 |
Date | Event |
---|---|
2012-12-05 | New Permit Application |
2013-02-05 | Performed Spud Operation |
2013-05-07 | Drilling Completion |
2013-05-20 | Perforation |
2013-05-20 | Performed Stage 1 of Stimulation |
2013-05-21 | Perforation |
2013-05-21 | Performed Stage 2 of Stimulation |
2013-05-21 | Performed Stage 3 of Stimulation |
2013-05-22 | Perforation |
2013-05-22 | Performed Stage 4 of Stimulation |
2013-05-23 | Perforation |
2013-05-23 | Performed Stage 5 of Stimulation |
2013-05-23 | Performed Stage 6 of Stimulation |
2013-05-23 | Performed Stage 7 of Stimulation |
2013-05-24 | Perforation |
2013-05-24 | Performed Stage 8 of Stimulation |
2013-05-24 | Performed Stage 9 of Stimulation |
2013-05-25 | Perforation |
2013-05-25 | Performed Stage 10 of Stimulation |
2013-05-25 | Performed Stage 11 of Stimulation |
2013-05-25 | Performed Stage 12 of Stimulation |
2013-05-26 | Perforation |
2013-05-26 | Performed Stage 13 of Stimulation |
2013-05-26 | Performed Stage 14 of Stimulation |
2013-05-27 | Perforation |
2013-05-27 | Performed Stage 15 of Stimulation |
2013-05-27 | Performed Stage 16 of Stimulation |
2013-05-28 | Perforation |
2013-05-28 | Performed Stage 17 of Stimulation |
2013-05-28 | Performed Stage 18 of Stimulation |
2013-05-29 | Perforation |
2013-05-29 | Performed Stage 19 of Stimulation |
2013-05-29 | Performed Stage 20 of Stimulation |
2013-05-30 | Perforation |
2013-05-30 | Performed Stage 21 of Stimulation |
2013-05-30 | Performed Stage 22 of Stimulation |
2013-05-31 | Perforation |
2013-05-31 | Performed Stage 22 of Stimulation |
2013-05-31 | Performed Stage 23 of Stimulation |
2013-05-31 | Performed Stage 24 of Stimulation |
2013-06-01 | Perforation |
2013-06-01 | Performed Stage 25 of Stimulation |
2013-06-01 | Performed Stage 26 of Stimulation |
2013-06-02 | Perforation |
2013-06-02 | Performed Stage 27 of Stimulation |
2013-06-02 | Performed Stage 28 of Stimulation |
2013-06-02 | Performed Stage 29 of Stimulation |
2013-06-03 | Perforation |
2013-06-03 | Performed Stage 30 of Stimulation |
2013-06-03 | Performed Stage 31 of Stimulation |
2013-06-03 | Performed Stage 32 of Stimulation |
2013-06-03 | Performed Stage 33 of Stimulation |
2013-06-04 | Perforation |
2013-06-04 | Performed Stage 34 of Stimulation |
2013-06-04 | Performed Stage 35 of Stimulation |
2013-06-04 | Performed Stage 36 of Stimulation |
2013-06-05 | Perforation |
2013-06-05 | Performed Stage 36 of Stimulation |
2013-06-05 | Performed Stage 37 of Stimulation |
2017-08-16 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-05-20 | 2014-03-05 | 7,407 | 12,898,300 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid (15%) | Halliburton | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0470695 | 56588.5 |
WG-36 Gelling Agent | Halliburton | Gel | Guar Gum | 9000-30-0 | 100 | 0.197476 | 237412 | |
FR-66 | Halliburton | Friction reducer | Hydrotreated Petroleum Distillate | 64742-47-8 | 30 | 0.0572388 | 68814.4 | |
Water | Halliburton | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.5303 | 107,636,000.0 | |
SP Breaker | Halliburton | Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00348167 | 4185.78 | |
LP-65 | Halliburton | Scale inhibitor | Ammonium Chloride | 12125-02-9 | 10 | 0.00373174 | 4486.42 | |
Sand (Proppant) | Halliburton | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.69279 | 11,653,000.0 | |
BE-9 | Halliburton | Biocide | Tributyl Tetradecyl Phosphonium Chloride | 81741-28-8 | 10 | 0.00339927 | 4086.71 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-05-20 | 1 | Sand | 3,350,592 | 7,552 | 9,085 |
2013-05-21 | 2 | Sand | 3,350,592 | 8,174 | 9,149 |
2013-05-21 | 3 | Sand | 3,350,592 | 8,525 | 8,840 |
2013-05-22 | 4 | Sand | 3,350,592 | 8,268 | 8,718 |
2013-05-23 | 5 | Sand | 3,350,592 | 8,552 | 8,901 |
2013-05-23 | 6 | Sand | 3,350,592 | 8,244 | 8,824 |
2013-05-23 | 7 | Sand | 3,350,592 | 8,507 | 9,198 |
2013-05-24 | 8 | Sand | 3,350,592 | 8,664 | 8,836 |
2013-05-24 | 9 | Sand | 3,350,592 | 8,162 | 9,416 |
2013-05-25 | 10 | 3,350,592 | 8,522 | 8,862 | |
2013-05-25 | 11 | Sand | 3,350,592 | 8,207 | 8,624 |
2013-05-25 | 12 | Sand | 3,350,592 | 0 | 6,691 |
2013-05-26 | 13 | Sand | 3,350,592 | 8,095 | 8,699 |
2013-05-26 | 14 | Sand | 3,350,592 | 8,491 | 9,258 |
2013-05-27 | 15 | Sand | 3,350,592 | 8,094 | 8,693 |
2013-05-27 | 16 | Sand | 3,350,592 | 8,545 | 8,783 |
2013-05-28 | 17 | Sand | 3,350,592 | 7,994 | 8,781 |
2013-05-28 | 18 | Sand | 3,350,592 | 8,248 | 8,898 |
2013-05-29 | 19 | Sand | 3,350,592 | 8,352 | 9,719 |
2013-05-29 | 20 | Sand | 3,350,592 | 7,878 | 8,493 |
2013-05-30 | 21 | Sand | 3,350,592 | 8,391 | 8,989 |
2013-05-30 | 22 | Sand | 3,350,592 | 8,434 | 8,949 |
2013-05-31 | 23 | Sand | 3,350,592 | 7,469 | 8,148 |
2013-05-31 | 24 | Sand | 3,350,592 | 7,658 | 8,691 |
2013-06-01 | 25 | Sand | 3,350,592 | 7,694 | 8,134 |
2013-06-01 | 26 | 3,350,592 | 4,983 | 7,605 | |
2013-06-02 | 27 | Sand | 3,350,592 | 7,243 | 7,827 |
2013-06-02 | 28 | Sand | 3,350,592 | 7,457 | 8,545 |
2013-06-02 | 29 | Sand | 3,350,592 | 7,468 | 8,026 |
2013-06-03 | 30 | Sand | 3,350,592 | 7,534 | 7,975 |
2013-06-03 | 31 | Sand | 3,350,592 | 7,664 | 8,652 |
2013-06-03 | 32 | Sand | 3,350,592 | 7,363 | 7,763 |
2013-06-03 | 33 | Sand | 3,350,592 | 7,845 | 9,333 |
2013-06-04 | 34 | Sand | 3,350,592 | 7,914 | 8,210 |
2013-06-04 | 35 | Sand | 3,350,592 | 7,556 | 7,959 |
2013-06-04 | 36 | Sand | 3,350,592 | 6,844 | 9,203 |
2013-06-05 | 37 | Sand | 3,350,592 | 7,110 | 8,475 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | EQT PROD CO | 1,030,416.00 | 302 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 807,314.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 568,767.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 454,184.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 353,319.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 307,948.00 | 336 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | EQT PROD CO | Produced Fluid | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Produced Fluid | 981.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | EQT PROD CO | Produced Fluid | 96.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | EQT PROD CO | Produced Fluid | 321.00 Bbl | INJECTION DISPOSAL WELL | 34-099-2-1956 |
2014 | EQT PROD CO | Fracing Fluid Waste | 8,354.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Produced Fluid | 318.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2014 | EQT PROD CO | Produced Fluid | 6,369.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2014 | EQT PROD CO | Produced Fluid | 99.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | EQT PROD CO | Produced Fluid | 43,518.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Produced Fluid | 574.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2015 | EQT PROD CO | Produced Fluid | 307.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24076 |
2015 | EQT PROD CO | Produced Fluid | 253.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015 | EQT PROD CO | Produced Fluid | 113.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2015 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28780 |
2015 | EQT PROD CO | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-007-23262 |
2015 | EQT PROD CO | Produced Fluid | 558.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2015 | EQT PROD CO | Produced Fluid | 1,742.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2015 | EQT PROD CO | Produced Fluid | 290.00 Bbl | INJECTION DISPOSAL WELL | 34-059-24202 |
2015 | EQT PROD CO | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2015 | EQT PROD CO | Produced Fluid | 17,078.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 380.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 1,162.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-007-2-3097 |
2016 | EQT PROD CO | Produced Fluid | 643.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016 | EQT PROD CO | Produced Fluid | 9,824.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | 1,049.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | EQT PROD CO | Produced Fluid | 295.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | EQT PROD CO | Produced Fluid | 1,464.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | 295.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
2017 | EQT PROD CO | 680.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | EQT PROD CO | Produced Fluid | 895.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Produced Fluid | 2,872.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | 1,327.00 Bbl | REUSE (AT WELL PAD) | ||
2018 | EQT PROD CO | Produced Fluid | 3,012.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | EQT PROD CO | Produced Fluid | 1,026.92 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 944.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Produced Fluid | 192.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | EQT PROD CO | Produced Fluid | 198.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 283.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | EQT PROD CO | Produced Fluid | 22.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | EQT PROD CO | Produced Fluid | 184.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 65.00 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 26.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | EQT PROD CO | Produced Fluid | 155.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Produced Fluid | 93.17 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Produced Fluid | 1,902.25 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2132928 | Primary Facility | 2013-01-24 | Routine/Complete Inspection | No Violations Noted | Met with operator reprsentative Bruce Gallick onsite. Site construction was underway. All perimeter and access road erosion controls had been implemented as outlined in the Girty Project ESCGP (ESX12-005-0015). There were no observed accelerated erosion or sedimentation issues observed in relation to the site or access road. |
2140195 | Primary Facility | 2013-02-08 | Drilling/Alteration | No Violations Noted | Conductor set |
2140251 | Primary Facility | 2013-02-14 | Drilling/Alteration | No Violations Noted | Conductor set |
2146791 | Primary Facility | 2013-02-26 | Drilling/Alteration | No Violations Noted | @ 40' |
2150772 | Primary Facility | 2013-03-12 | Drilling/Alteration | No Violations Noted | removing equipment from location |
2162061 | Primary Facility | 2013-04-26 | Drilling/Alteration | No Violations Noted | |
2164901 | Primary Facility | 2013-05-01 | Drilling/Alteration | No Violations Noted | @11,070' |
2164905 | Primary Facility | 2013-04-24 | Drilling/Alteration | No Violations Noted | moving rig |
2179815 | Primary Facility | 2013-07-01 | Routine/Complete Inspection | No Violations Noted | Well development activities were ongoing on the well-pad at the time of the inspection. Site containment was in place and appeared to be in sound condition. Eight Baker tanks were located onsite and all eight were located on containment. Both the (as labeled) Reserve pit and the Freshwater Impoundment contained fluids and had more than two feet of lined freeboard. Site and access road erosion controls appeared to be functioning properly, properly maintained and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. All soil stockpiles and slopes had been temporarily stabilized with vegetation. |
2179818 | Primary Facility | 2013-07-01 | Routine/Complete Inspection | No Violations Noted | Well development activities were ongoing on the well-pad at the time of the inspection. Site containment was in place and appeared to be in sound condition. Eight Baker tanks were located onsite and all eight were located on containment. Both the (as labeled) Reserve pit and the Freshwater Impoundment contained fluids and had more than two feet of lined freeboard. Site and access road erosion controls appeared to be functioning properly, properly maintained and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. All soil stockpiles and slopes had been temporarily stabilized with vegetation. |
2200228 | Primary Facility | 2013-08-30 | Routine/Complete Inspection | No Violations Noted | Drilling appeared to have been completed, well was not equipped for production. Site containment was still ocated onsite, however no well development equipment was located onsite. Both the (as labeled) Reserve and the Freshwater Impoundments contained fluids and had more than two feet of lined freeboard. Site and access road erosion controls appeared to be functioning properly, properly maintained and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. All soil stockpiles and slopes had been temporarily stabilized with vegetation. |
2211835 | Primary Facility | 2013-10-09 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well was in the process of being equipped for production. Both the (as labeled) Reserve and the Freshwater Impoundments contained fluids and had more than two feet of lined freeboard. Site and access road erosion controls appeared to be functioning properly, properly maintained and there was no observed evidence of accelerated erosion or sedimentation in relation to the site or access road. All soil stockpiles and slopes had been temporarily stabilized with vegetation. |
2225599 | Primary Facility | 2013-11-27 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Freshwater and flowback impoundments located onsite and both had more than two feet of freeboard. There was no accelerated erosion or sedimentation observed in relation to the site. Site and access road erosion controls appeared to have been maintained and were functioning as intended. |
2250972 | Primary Facility | 2014-03-05 | Complaint Inspection | No Violations Noted | 3 wells drilled and being equipped. |
2258799 | Primary Facility | 2014-04-01 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Freshwater and flowback impoundments located onsite and both had more than two feet of lined freeboard. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2290473 | Primary Facility | 2014-07-25 | Routine/Complete Inspection | No Violations Noted | operating; ID OK |
2291246 | Primary Facility | 2014-07-29 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Freshwater and flowback impoundments located onsite and both had more than two feet of lined freeboard. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2295453 | Primary Facility | 2014-08-12 | Complaint Inspection | No Violations Noted | 3 wells drilled and equipped. 1 conductor set. 3 tanks and 1 roll-off onsite. |
2296970 | Primary Facility | 2014-08-05 | Routine/Complete Inspection | No Violations Noted | operating ID OK |
2304366 | Primary Facility | 2014-09-05 | Routine/Complete Inspection | No Violations Noted | operating; under Alaph Hunter rig |
2313395 | Primary Facility | 2014-10-16 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Freshwater and flowback impoundments located onsite and both had more than two feet of lined freeboard. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2313990 | Primary Facility | 2014-10-21 | Complaint Inspection | No Violations Noted | Frac underway. |
2330944 | Primary Facility | 2014-12-19 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Freshwater and flowback impoundments located onsite and both had more than two feet of lined freeboard. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2353768 | Primary Facility | 2015-03-10 | Complaint Inspection | No Violations Noted | operating ID OK annuli open |
2360001 | Primary Facility | 2015-04-09 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite and it appeared to be in sound condition. All site and access road erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
2404142 | Primary Facility | 2015-09-01 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite and it appeared to be in sound condition. All implemented site and access road erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. |
2435450 | Primary Facility | 2015-12-23 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Equipment-tanks-dike-E&S controls-well site look good. |
2546433 | Primary Facility | 2016-12-15 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production, brine tank located onsite and it appeared to be in sound condition. All implemented site and access road erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. Site had been regraded to meet the PCSM drawing and it had been temporarily stabilized with mulch, the vegetation had not germinated and had subsequently not reached 70% uniform vegetative cover. |
2587885 | Primary Facility | 2017-04-27 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite within secondary containment. Brine tank appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2617151 | Primary Facility | 2017-07-20 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively restored. The majority of the site had attained 70% uniform perennial vegetation and the remainder has been returned to agricultural activities by the landowner. |
2627353 | Primary Facility | 2017-08-18 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2636300 | Primary Facility | 2017-09-15 | Routine/Complete Inspection | No Violations Noted | |
2664950 | Primary Facility | 2017-11-29 | Routine/Complete Inspection | No Violations Noted | Multi-well pad. At time of inspection, well drilled and appears equipped for production. The three other wells on this pad are also drilled and appear equipped for production. |
2788665 | Primary Facility | 2018-10-15 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2821719 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[9]