X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31152

Well Details

Well ID: 37-005-31152
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: MDS ENERGY DEV LLC
Well Pad ID: 149766
Farm/Lease Name: DAVID J PORE
License Status: Active
Spud Date: 2014-01-13
Permit Date: 2013-08-20
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.779908
Longitude: -79.573575

For data sources see[1][2][3]

Well History

Date Event
2013-08-20 New Permit Application
2014-01-11 Performed Spud Operation
2014-01-22 Drilling Completion
2014-02-26 Perforation
2014-02-27 Performed Stage 1 of Stimulation
2014-02-28 Performed Stage 2 of Stimulation
2016-06-06 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-27 2014-02-28 6,706 165,231 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Super 100 NE Nabors Completion and Production Services Surfactants & Foamers Methyl Alcohol 67-56-1 15 0.021732 0
Isopropyl Alcohol 67-63-0 40 0.057952 0
N-Cocoamidopropyl-N,N-dimethyl-N-2-hydroxypropylsulfobetaine
68139-30-0 15 0.021732 0
2-Butoxyethanol 111-76-2 5 0.007244 0
Nitrogen per MSCF Nabors Completion and Production Services Nitrogen Materials Nitrogen 7727-37-9 100 27.9379 0
Super TSC-LT Nabors Completion and Production Services Paraffin & Scale Additives Propylene Glycol 57-55-6 0 0 0
HCl Acid (12.5%-18.0%) Nabors Completion and Production Services Bulk Acid Hydrogen Chloride 7647-01-0 16 0.030568 0
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Ethoxylated Nonylphenol 68412-54-4 13 0.000123 0
Glycol Ethers 111-46-6 40 0.000378 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.00009500 0
Propargyl Alcohol 107-19-7 40 0.000378 0
Isopropyl Alcohol 67-63-0 40 0.000378 0
KR-153SL Nabors Completion and Production Services Biocides Polyethlyene-Glycol 25322-68-3 50 0.006209 0
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.002484 0
ICP-1000 Nabors Completion and Production Services Iron Control Additives Anionic Copolymer Proprietary 50 0.005564 0
Propylene glycol 57-55-6 50 0.005564 0
Water MDS Energy Development LLC Water Water 7732-18-5 100 52.6129 0
Other Ingredients Nabors Completion and Production Services Other Ingredients Water 7732-18-5 80 0.00947771 0
Dioxane 123-91-1 1 0.00000967 0
Water 7732-18-5 50 0.0767447 0
Solvent Proprietary 1 0.00153539 0
Ammonium salts Proprietary 30 0.0460466 0
Water 7732-18-5 40 0.0444714 0
2-Butoxyethanol 111-76-2 13 0.000125711 0
Proprietary Proprietary 1 0.00153539 0
Polymer Proprietary 10 0.0153485 0
Phosphoric Acid 7664-38-2 0.99 0.00151927 0
Proprietary Proprietary 15 0.000816581 0
Water 7732-18-5 48 0.000463088 0
Anionic Polyacrylamide 910644-97-2 40 0.0444714 0
Propylene glycol 57-55-6 15 0.0166765 0
Polymer Proprietary 1 0.00153539 0
Proprietary Proprietary 50 0.00272373 0
ammonium, (2-Hydroxyethyl)trimethyl-, chloride 67-48-1 80 0.000563011 0
Proprietary Proprietary 0.99 0.00151927 0
Monoethanolamine Proprietary 0.99 0.00151927 0
Alkyl Phosphate Ether Proprietary 1 0.00153539 0
Proprietary Proprietary 2 0.00222303 0
Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Crystalline Silica, quartz 14808-60-7 99.9 18.7848 0
HCL Acid (0%-7.5%) Nabors Completion and Production Services Bulk Acid Hydrogen Chloride 7647-01-0 7 0.011813 0
WFR-3B Nabors Completion and Production Services Friction Reducer Ethoxylated Alcohols 68551-12-2 4 0.004429 0
Mineral Spirits 8052-41-3 10 0.011073 0
Propylene Glycol 57-55-6 25 0.027683 0
Hydrotreated light distillates, non-aromatic, BTEX free 64742-47-8 30 0.03322 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-02-27 1 Sand 101,517 6,054 6,300
2014-02-28 2 Sand 101,517 5,535 6,283

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 MDS ENERGY DEV LLC 51,906.00 271 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 29,953.90 362 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 21,652.00 335 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 15,993.60 352 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 12,800.00 337 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 13,062.00 354 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 MDS ENERGY DEV LLC Drilling Fluid Waste 472.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2014 MDS ENERGY DEV LLC Produced Fluid 106.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 MDS ENERGY DEV LLC Fracing Fluid Waste 1,626.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 MDS ENERGY DEV LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 MDS ENERGY DEV LLC Produced Fluid 100.00 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2226682 Primary Facility 2013-12-05 Routine/Complete Inspection No Violations Noted Pre-operational Inspection. Site construction was underway at the time of the inspection. Perimeter E&S controls had been installed at the time of the inspection. There was no accelerated erosion or sedimentation in relation to the site or access road. The E&S plan as compiled should effectively minimize accelerated erosion or sedimentation provided the remaining erosion controls are implemented and maintained as outlined in the E&S plan.
2237991 Primary Facility 2014-01-14 Drilling/Alteration No Violations Noted First Class Energy rig#10 RD20 waiting on cement at time of inspection. Pit lined and freeboard maintained.
2239739 Primary Facility 2014-01-24 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well was not equipped for production. Drill pit was frozen and covered in snow. Site had been constructed and E&S controls implemented as outlined in the E&S plan.
2250415 Primary Facility 2014-03-03 Routine/Complete Inspection No Violations Noted Well stimulation activities appeared to have been completed, well was being flared at the time of the inspection. Drill pit located onsite and it contained frozen fluids and drill cuttings. There was no accelerated erosion or sedimentation in relation to the site or access road.
2265898 Primary Facility 2014-04-25 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite. Brine tanks appeared to be in sound condition. Drill pit located onsite and it contained fluids and drill cuttings. Drill pit had more than two feet of lined freeboard. Site had not been regraded or reclaimed. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2285563 Primary Facility 2014-07-09 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite. Brine tanks appeared to be in sound condition. Drill pit located onsite and it contained fluids and drill cuttings. Drill pit had more than two feet of lined freeboard. Site had not been regraded or reclaimed. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2316964 Primary Facility 2014-10-29 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production, brine tanks located onsite. Brine tanks appeared to be in sound condition. Site had been regraded, seed, mulched and the vegetation had begun to emerge but did not as of yet meet the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2511493 Primary Facility 2016-08-18 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.

For data sources see[9]

References