X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31213

Well Details

Well ID: 37-005-31213
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 151874
Farm/Lease Name: AMBROSE 1H
License Status: Active
Spud Date: 2014-10-06
Permit Date: 2014-07-09
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.860744
Longitude: -79.5392

For data sources see[1][2][3]

Well History

Date Event
2014-07-09 New Permit Application
2014-10-06 Performed Spud Operation
2014-12-20 Drilling Completion
2015-08-18 Perforation
2015-08-26 Perforation
2015-08-26 Performed Stage 1 of Stimulation
2015-08-29 Perforation
2015-08-29 Performed Stage 2 of Stimulation
2015-08-29 Performed Stage 3 of Stimulation
2015-08-30 Perforation
2015-08-30 Performed Stage 4 of Stimulation
2015-08-30 Performed Stage 5 of Stimulation
2015-08-31 Perforation
2015-08-31 Performed Stage 6 of Stimulation
2015-08-31 Performed Stage 7 of Stimulation
2015-09-01 Perforation
2015-09-01 Performed Stage 8 of Stimulation
2015-09-01 Performed Stage 9 of Stimulation
2015-09-02 Perforation
2015-09-02 Performed Stage 10 of Stimulation
2015-09-02 Performed Stage 11 of Stimulation
2015-09-02 Performed Stage 12 of Stimulation
2015-09-03 Perforation
2015-09-03 Performed Stage 13 of Stimulation
2015-09-03 Performed Stage 14 of Stimulation
2015-09-04 Perforation
2015-09-04 Performed Stage 15 of Stimulation
2015-09-04 Performed Stage 16 of Stimulation
2015-09-05 Perforation
2015-09-05 Performed Stage 17 of Stimulation
2015-09-05 Performed Stage 18 of Stimulation
2015-09-06 Perforation
2015-09-06 Performed Stage 19 of Stimulation
2015-09-06 Performed Stage 20 of Stimulation
2015-09-06 Performed Stage 21 of Stimulation
2015-09-07 Perforation
2015-09-07 Performed Stage 22 of Stimulation
2015-09-08 Perforation
2015-09-08 Performed Stage 23 of Stimulation
2015-09-08 Performed Stage 24 of Stimulation
2015-09-08 Performed Stage 25 of Stimulation
2015-09-09 Perforation
2015-09-09 Performed Stage 26 of Stimulation
2015-09-09 Performed Stage 27 of Stimulation
2015-09-09 Performed Stage 28 of Stimulation
2015-09-09 Performed Stage 29 of Stimulation
2016-06-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-26 2015-09-09 6,464 10,401,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Keane Proppant Crystalline Silica, Quartz 14808-60-7 100 8.01178 7,618,900.0
SCALE CLEAR 112 Weatherford Scale Inhibitor Sodium Polyacrylate Copolymer 25987-30-8 40 0.00113616 1080.44
Ethylene Glycol 107-21-1 40 0.00113616 1080.44
FRA 408 Weatherford Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 40 0.0144216 13714.4
Ammonium Chloride 12125-02-9 12125-02-9 20 0.00721079 6857.19
PGS-214 Rockwater Guar Slurry PGS-214 Proprietary 100 0.00103051 979.974
Water Snyder Brothers Inc Carrier/Base Fluid Water 7732-18-5 100 91.2781 86,802,000.0
FFR 730 Nalco Friction Reducer Oxyalkylated alcohol A Proprietary 5 0.00204461 1944.34
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00311726 2964.39
BIOCLEAR 2000 Weatherford Biocide 2, 2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.00230468 2191.66
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00211513 2011.41
AI 600P Weatherford Acid Inhibitor Cinnamaldehyde 104-55-2 15 0.000184567 175.517
Methanol 67-56-1 2.5 0.00003076 29.253
Dimethylformamide 68-12-2 20 0.00024609 234.022
Nonyl Phenol Ethoxylate, Branched 127087-87-0 15 0.000184567 175.517
2-Butoxyethanol 111-76-2 5 0.00006152 58.506
Pyridine, alkyl derives., quaternized with benzyl chloride 68909-18-2 15 0.000184567 175.517
Ethylene Glycol 107-21-1 40 0.00049218 468.044
Alkyl Pyridine 68391-11-7 1 0.00001230 11.701
Triethyl Phosphate 78-40-0 2.5 0.00003076 29.253
1-Decanol 112-30-1 5 0.00006152 58.506
1-Octanol 111-87-5 5 0.00006152 58.506
Hydrochloric Acid (15%) FSTI Acid HCL 7647-01-0 15 0.0883529 84020.2
FRA 405 Weatherford Friction Reducer Ammonium Chloride 12125-02-9 7 0.000391332 372.142
Petroleum Distillates 64742-47-8 40 0.00223618 2126.52
Sodium Chloride 7647-14-5 10 0.000559045 531.631
Alcohols, C-12-16, Ethoxylated 68551-12-2 7 0.000391332 372.142
K BAC 1020 WST Biocide Polyethylene glycol 25322-68-3 60 0.00261843 2490.03
2,2-Diobrom-3nirilopropionamide 10222-01-2 20 0.000872812 830.01
LEB 10X Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00005980 56.871

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-08-26 1 SAND 0 8,640 9,160
2015-08-29 2 SAND 0 7,336 9,192
2015-08-29 3 SAND 0 6,746 6,974
2015-08-30 4 SILICA SAND 0 6,616 7,585
2015-08-30 5 SILICA SAND 0 0 0
2015-08-31 6 SILICA SAND 0 6,518 7,109
2015-08-31 7 SILICA SAND 0 6,725 7,830
2015-09-01 8 SILICA SAND 0 6,305 6,508
2015-09-01 9 SILICA SAND 0 6,414 7,066
2015-09-02 10 SILICA SAND 0 6,454 6,950
2015-09-02 11 SILICA SAND 0 6,704 8,798
2015-09-02 12 SILICA SAND 0 6,578 7,078
2015-09-03 13 SILICA SAND 0 6,170 6,720
2015-09-03 14 SILICA SAND 0 8,152 8,460
2015-09-04 15 SILICA SAND 0 6,814 7,283
2015-09-04 16 SILICA SAND 0 6,494 6,735
2015-09-05 17 SILICA SAND 0 6,548 6,986
2015-09-05 18 SILICA SAND 0 6,553 6,849
2015-09-06 19 SILICA SAND 0 6,842 7,300
2015-09-06 20 SILICA SAND 0 6,776 7,125
2015-09-06 21 SILICA SAND 0 6,788 7,088
2015-09-07 22 SILICA SAND 0 6,519 6,747
2015-09-08 23 SILICA SAND 0 6,467 6,761
2015-09-08 24 SILICA SAND 0 6,773 7,171
2015-09-08 25 SILICA SAND 0 7,082 7,581
2015-09-09 26 SILICA SAND 0 6,983 7,432
2015-09-09 27 SILICA SAND 0 7,055 7,459
2015-09-09 28 SILICA SAND 0 6,999 7,272
2015-09-09 29 SILICA SAND 0 7,169 7,807

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2015 SNYDER BROS INC 225,143.00 49 0.00 0 0.00 0
2016 SNYDER BROS INC 1,019,708.00 356 0.00 0 0.00 0
2017 SNYDER BROS INC 957,200.00 365 0.00 0 0.00 0
2018 SNYDER BROS INC 837,664.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 421,381.00 235 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 SNYDER BROS INC Drill Cuttings 1,167.05 Tons LANDFILL SWF 1025
2014 SNYDER BROS INC Drilling Fluid Waste 33.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 SNYDER BROS INC Drilling Fluid Waste 60.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 SNYDER BROS INC Fracturing Fluid Waste 43.61 Tons LANDFILL 100585
2015 SNYDER BROS INC Produced Fluid 1,918.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Produced Fluid 10,511.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2015 SNYDER BROS INC Fracing Fluid Waste 220.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2015 SNYDER BROS INC Fracing Fluid Waste 8,130.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 8,130.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 SNYDER BROS INC Produced Fluid 10,511.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 2,844.69 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 641.43 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 SNYDER BROS INC Produced Fluid 833.47 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 118.80 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2016 SNYDER BROS INC Produced Fluid 925.13 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SNYDER BROS INC Produced Fluid 1,553.38 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 SNYDER BROS INC Produced Fluid 1,388.81 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Produced Fluid 6,716.06 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Produced Fluid 2,844.69 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 SNYDER BROS INC 5,353.34 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 47.20 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 SNYDER BROS INC Produced Fluid 3,791.14 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 2,775.61 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Produced Fluid 619.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 6,563.07 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 604.50 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 7,573.30 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 138.70 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 625.60 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 2,707.20 Bbl INJECTION DISPOSAL WELL 34-099-23158

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2314196 Primary Facility 2014-10-09 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2315378 Primary Facility 2014-10-24 Routine/Complete Inspection No Violations Noted Drill rig was located onsite and drilling activities were ongoing for 005-31214 Ambrose 2H. Closed loop system was in use for drill cutting disposal resulting in drill cuttings being hauled off-site for disposal. Secondary containment located onsite and it appear to be intact and functioning as required. There was no observed accelerated erosion or sedimentation in relation to the site or existing access road.
2317073 Primary Facility 2014-10-27 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2327567 Primary Facility 2014-12-08 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2337432 Primary Facility 2015-01-20 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2352704 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2354562 Primary Facility 2015-03-19 Drilling/Alteration No Violations Noted Waiting on frac.
2366650 Primary Facility 2015-04-24 Drilling/Alteration No Violations Noted Waiting on frac.
2366807 Primary Facility 2015-04-29 Drilling/Alteration No Violations Noted Waiting on frac. Department site visit w/WQS S. Foulk and C. Witham.
2368639 Primary Facility 2015-05-11 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2377847 Primary Facility 2015-06-09 Drilling/Alteration No Violations Noted Waiting on frac.
2382186 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Waiting on frac.
2390263 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted Drill rig located onsite, drilling for Ambrose 5H was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2441957 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2442047 Primary Facility 2016-01-19 Routine/Complete Inspection No Violations Noted 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok.
2443469 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production units-equipment-tank battery look ok.
2480485 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2538004 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2583506 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok.
2589363 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2674085 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection, well 1H drilled and appears equipped for production. Wells 2H, 3H, 4H, 5H, 6H also drilled and appear equipped for production.
2683772 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 1H drilled and appears equipped for production. Wells 2H, 3H, 4H, 5H, 6H also drilled and appear equipped for production.
2709925 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2771428 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment.
2798040 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok.
2821098 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2847444 Primary Facility 2019-02-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 400 psi and the casing pressure was 650 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad.

For data sources see[9]

References