37-007-20413

Well Details

Well ID: 37-007-20413
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 150486
Farm/Lease Name: B3 PER B3-3H
License Status:
Spud Date:
Permit Date: 2013-11-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.760158
Longitude: -80.167081

For data sources see[1][2][3]

Well History

Date Event
2013-11-12 New Permit Application
2014-04-10 Performed Spud Operation
2014-05-09 Drilling Completion
2014-09-21 Drilling Completion
2015-04-14 Perforation
2015-06-04 Newly Drilled
2016-01-05 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-05-04 2015-05-08 5,145 10,270,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00302294 3067.29
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.7567 11,929,200.0
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.822797 834868
Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0223716 22699.8
Unihib G GeoSafe Acid Corrosion Inhibitor Ethoxylated Alcohol 68002-97-1 35 0.000238255 241.75
Thiourea 62-56-6 1 0.00000681 6.907
Glycol Ether 112-34-5 60 0.000408437 414.429
Acetophenone 98-86-2 1 0.00000681 6.907
Methanol 67-56-1 5 0.00003404 34.536
Formaldehyde 50-00-0 1 0.00000681 6.907
WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.00142903 1450
EC6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.0064663 6561.17
Polyethylene Glycol 25322-68-3 60 0.0129326 13122.3
Dibromoacetonitrile 3252-43-5 5 0.00107772 1093.53
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.0554 87,317,900.0
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00001485 15.068
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00325289 3300.61

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 256,302.00 60 0.00 0 3,390.00 60
2016 PENNENERGY RESOURCES LLC 1,070,971.00 366 0.00 0 7,161.00 366
2017 PENNENERGY RESOURCES LLC 763,612.00 343 0.00 0 3,818.00 343
2018 PENNENERGY RESOURCES LLC 633,004.00 349 0.00 0 2,437.00 349
2019 PENNENERGY RESOURCES LLC 538,214.00 344 0.00 0 1,634.00 344

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,105.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2014 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,105.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2014 PENNENERGY RESOURCES LLC Drill Cuttings 828.13 Tons LANDFILL CID # 28726
2015 PENNENERGY RESOURCES LLC Fracturing Fluid Waste 15.46 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Produced Fluid 1,068.12 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Produced Fluid 257.50 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 PENNENERGY RESOURCES LLC Produced Fluid 483.43 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 PENNENERGY RESOURCES LLC Produced Fluid 1,047.40 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 12,815.38 Bbl REUSE OTHER THAN ROAD SPREADING
2016 PENNENERGY RESOURCES LLC Produced Fluid 257.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC 14.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Produced Fluid 2,655.27 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC 2,774.65 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 14.30 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,592.86 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 28.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 29.84 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 83.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,750.48 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 25.41 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2260625 Primary Facility 2014-04-08 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2267286 Primary Facility 2014-04-21 Routine/Complete Inspection No Violations Noted The conductor was set for this well targeting the either the Genesee or the Marcellus layer. The inspection for this well was conducted concurrently with the inspection for site number 776908 (inspection report # 2267205). The water impoundment was under construction at time of inspection. All E&S controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. No erosion or sedimentation issues were noted.
2274952 Primary Facility 2014-04-16 Drilling/Alteration No Violations Noted CONDUCTOR IS IN. A SOUND WALL IS BEING BUILT. STILL WORKING ON THE PAD.
2275021 Primary Facility 2014-05-06 Drilling/Alteration No Violations Noted HIGHLANDS 7 DRILLING 15" HOLE AT 225'. THE SITE IS OK.
2275025 Primary Facility 2014-04-23 Drilling/Alteration No Violations Noted 40' OF 20" CONDUCTOR IS INSTALLED. THE SITE IS OK.
2276866 Primary Facility 2014-05-23 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE. THE RIG HAS MOVED.
2276916 Primary Facility 2014-06-03 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE. ALL EQUIPTMENT REMOVED. PROTECTIVE COVER IS STILL DOWN.
2288981 Primary Facility 2014-06-12 Routine/Complete Inspection No Violations Noted The inspection for this well was conducted concurrently with the inspection for site number 776908. The tophole was drilled. The water impoundment was constructed but not lined at time of inspection. All E&S controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. A moderate slip was noted on the topsoil pile but adequate vegetative growth and E&S controls appeared to prevent off-site transport of sediment.
2297591 Primary Facility 2014-08-22 Routine/Complete Inspection No Violations Noted The inspection for this well was conducted concurrently with the inspection for site number 776908. Well was properly labeled. Topsoil pile had adequate vegetative growth. E&S controls were sufficient to prevent off-site transport of sediment. Damp area was noted at corner of containment. Department requests operator ensure containment is adequate to contain residual waste.
2307376 Primary Facility 2014-09-25 Drilling/Alteration No Violations Noted DRILLING COMPLETE. THE PRODUCTION CASING IS IN AT 10,892'.
2350396 Primary Facility 2015-01-20 Complaint Inspection No Violations Noted
2361483 Primary Facility 2015-04-10 Routine/Complete Inspection No Violations Noted
2365875 Primary Facility 2015-04-28 Routine/Complete Inspection No Violations Noted
2372378 Primary Facility 2015-04-02 Drilling/Alteration No Violations Noted THIS WELL HAS BEEN PRESSURE TESTED BUT NOT FRACED.
2374345 Primary Facility 2015-05-26 Routine/Complete Inspection No Violations Noted
2381768 Primary Facility 2015-06-19 Routine/Complete Inspection No Violations Noted
2383242 Primary Facility 2015-06-29 Drilling/Alteration No Violations Noted THIS WELL IS FRACED AND SHUT-IN.
2396576 Primary Facility 2015-08-04 Drilling/Alteration No Violations Noted FLOWBACK HAS STARTED FOR THIS WELL. THE PAD IS COVERED AND IN GOOD CONDITION.
2436863 Primary Facility 2015-12-29 Routine/Complete Inspection No Violations Noted
2448597 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted THIS WELL IS DRILLED, FRACED, AND PRODUCING.

THE SITE AND EQUIPTMENT ARE IN GOOD CONDITION.

2480582 Primary Facility 2016-04-26 Drilling/Alteration No Violations Noted THE 3H HAS BEEN COMPLETED AND IS NOW PRODUCING.

THE SITE IS IN GOOD CONDITION.

2561317 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign installed and maintained. Freshwater impoundment installed and fenced in. Four wells in production. Two four hundred bbl tanks installed and maintained within secondary steel containment structure. Erosion and Sedimentation Best Management practices installed and maintained. Site stabilized in previously disturbed areas around pad and access road with vegetative growth. No apparent E/S issues.
2665298 Primary Facility 2017-11-29 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluid tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Freshwater impoundment located onsite and it contained what appeared to be freshwater.
2686193 Primary Facility 2018-01-12 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. All erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Two brine tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained fluids.
2856225 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]