X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-013-20014

Well Details

Well ID: 37-013-20014
Loading map...
Country: United States
State: Pennsylvania
County: Blair
Municipality: Juniata Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 147458
Farm/Lease Name: LIGHTNER UNIT 1H
License Status:
Spud Date: 2010-08-12
Permit Date: 2010-07-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.360578
Longitude: -78.555903

For data sources see[1][2][3]

Well History

Date Event
2010-07-16 New Permit Application
2010-08-12 Performed Spud Operation
2010-08-30 Drilling Completion
2011-01-20 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 18,688.00 31 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 334,073.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 151,733.00 334 0.00 0 0.00 0
2015 LPR ENERGY LLC 143,132.01 322 0.00 0 0.00 0
2016 LPR ENERGY LLC 128,428.56 364 0.00 0 0.00 0
2017 LPR ENERGY LLC 111,925.00 355 0.00 0 0.00 0
2018 LPR ENERGY LLC 110,678.00 361 0.00 0 0.00 0
2019 LPR ENERGY LLC 101,494.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 190.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 831.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Produced Fluid 11,075.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 592.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014 CHEVRON APPALACHIA LLC Produced Fluid 3,110.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 LPR ENERGY LLC Produced Fluid 334.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 LPR ENERGY LLC Produced Fluid 1,814.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 LPR ENERGY LLC Produced Fluid 19.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC Produced Fluid 318.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 LPR ENERGY LLC 419.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 2,236.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC 203.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 332.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC Produced Fluid 1,130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC 318.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 1,118.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC 1,118.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 422.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 868.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC 422.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 LPR ENERGY LLC Produced Fluid 310.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2018 LPR ENERGY LLC Produced Fluid 307.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 2,658.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 314.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 LPR ENERGY LLC Produced Fluid 2,660.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1903213 Primary Facility 2010-08-04 Drilling/Alteration De minimus Violations Noted Setting up Patterson 255. well drilled by Zigenfuss to 405'. DVN permit number not on site id sign
1909507 Primary Facility 2010-08-31 Drilling/Alteration Violation(s) Noted Patterson 255 finished drilling. well drilled to TMD 11,550'. pemitted TMD is 11,148'
1911894 Primary Facility 2010-08-10 Routine/Complete Inspection No Violations Noted
1912774 Primary Facility 2010-09-13 Drilling/Alteration No Violations Noted Gas leaking out of what appears to be the 9 5/8" annulus. 2%LEL on Impact Pro monitor
1915134 Primary Facility 2010-09-23 Follow-up Inspection No Violations Noted Gas coming from annulus of 9 5/8" casing. Company man will get a piece built to seal annulus and vent through a 2" port in order to monitor.
1924764 Primary Facility 2010-10-06 Routine/Complete Inspection No Violations Noted
1931659 Primary Facility 2010-11-29 Routine/Complete Inspection Violation(s) Noted Gas venting from the 9 5/8" annulus
1942016 Primary Facility 2010-11-09 Routine/Complete Inspection No Violations Noted
1951723 Primary Facility 2011-01-14 Routine/Complete Inspection No Violations Noted
1980390 Primary Facility 2011-04-12 Routine/Complete Inspection No Violations Noted
1981871 Primary Facility 2011-05-10 Routine/Complete Inspection No Violations Noted
1993524 Primary Facility 2011-06-20 Routine/Complete Inspection No Violations Noted
2001281 Primary Facility 2011-07-22 Routine/Complete Inspection No Violations Noted
2004544 Primary Facility 2011-08-03 Routine/Complete Inspection No Violations Noted
2024698 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted
2035532 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted
2058961 Primary Facility 2012-03-08 Routine/Complete Inspection No Violations Noted
2097967 Primary Facility 2012-09-04 Follow-up Inspection No Violations Noted
2107167 Primary Facility 2012-10-11 Follow-up Inspection No Violations Noted
2107176 Primary Facility 2012-10-11 Follow-up Inspection No Violations Noted
2108778 Primary Facility 2012-10-17 Follow-up Inspection No Violations Noted
2130535 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted
2170032 Primary Facility 2013-05-29 Routine/Complete Inspection No Violations Noted
2196025 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted
2223710 Primary Facility 2013-11-19 Routine/Complete Inspection No Violations Noted
2232634 Primary Facility 2013-12-27 Routine/Complete Inspection No Violations Noted
2468878 Primary Facility 2016-03-23 Site Restoration No Violations Noted
2688354 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Lightner Unit Pad, Well # 1H on January 30, 2018.

There is 1 producing well on this pad. Annulus is closed and not vented at time of inspection. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist.

2784106 Primary Facility 2018-10-01 Routine/Complete Inspection No Violations Noted Department representative Sue Herzing conducted a routine site inspection at LPR Energy's Lightner East Unit on October 1, 2018. There is one drilled and producing Marcellus well (013-20014) located on this partially reduced in size well pad. All areas surrounding the well pad are very well vegetated exceeding 70% uniform cover.

No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1909507 594296 08/31/2010 2010-08-31 78.12* - Oil or gas well drilled, altered or operated not in accordance with a permit or the regulations. Administrative Well drilled to TME 11,550'. Permitted TMD is 11,148'
1931659 600641 11/29/2010 2010-11-29 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
600641 265808 NOV - Notice of Violation

For data sources see[7]

References