If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-013-20015 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.353253,"lon":-78.565786,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Blair | |
Municipality: Juniata Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149193 | |
Farm/Lease Name: RITCHEY UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-08-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.353253 | |
Longitude: -78.565786 |
Date | Event |
---|---|
Deviated | |
2010-08-16 | New Permit Application |
2010-10-03 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-08-18 | 2011-08-18 | 6,838 | 3,628,968 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Base Fluid | Water | 100.00 | 85.25 | |||
FE OXCLEAR | Universal Well Services | Oxygen Scavenger | Ammonium bisulfite | 10192-30-0 | 0.01 | |||
Sand (Proppant) | Universal Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 14.59 | ||
ScaleHib 100 | Universal Well Services | Scale Inhibitor | Ethylene glycol | 107-21-1 | 0.04 | |||
Unislik ST 50 | Universal Well Services | Friction Reducer | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.07 | ||||||
Biocide EC 6116A | Universal Well Services | Biocide | Dibromoacetonitrile | 3252-43-5 | 0.02 | |||
Polyethylene glycol | 25322-68-3 | |||||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 161,102.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 110,106.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | LPR ENERGY LLC | 65,660.55 | 200 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 79,752.74 | 249 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 78,157.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 80,548.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 70,869.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 392.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 22.72 Tons | LANDFILL | 101397 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.05 Tons | LANDFILL | 101397 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 8,920.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,430.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,749.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | LPR ENERGY LLC | Produced Fluid | 393.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | LPR ENERGY LLC | Produced Fluid | 1,121.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | LPR ENERGY LLC | Produced Fluid | 53.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 443.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | LPR ENERGY LLC | Produced Fluid | 531.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | LPR ENERGY LLC | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 | |
2016 | LPR ENERGY LLC | Produced Fluid | 1,191.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | LPR ENERGY LLC | Produced Fluid | 1,732.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | LPR ENERGY LLC | 405.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 | |
2016 | LPR ENERGY LLC | Produced Fluid | 365.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | 531.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | LPR ENERGY LLC | Produced Fluid | 2,131.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | 2,131.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM | |
2017 | LPR ENERGY LLC | Produced Fluid | 525.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | LPR ENERGY LLC | Produced Fluid | 1,067.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | LPR ENERGY LLC | 525.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | LPR ENERGY LLC | Produced Fluid | 250.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | LPR ENERGY LLC | 517.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | ||
2017 | LPR ENERGY LLC | 200.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2018 | LPR ENERGY LLC | Produced Fluid | 409.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 614.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 3,076.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 600.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | LPR ENERGY LLC | Produced Fluid | 3,482.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1919973 | Primary Facility | 2010-10-05 | Drilling/Alteration | No Violations Noted | Patterson 255 is preparing to run 9 5/8" casing |
1924077 | Primary Facility | 2010-10-27 | Drilling/Alteration | No Violations Noted | Drilling completed moving rig off pad |
1924760 | Primary Facility | 2010-10-06 | Routine/Complete Inspection | No Violations Noted | |
1929531 | Primary Facility | 2010-10-29 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1931656 | Primary Facility | 2010-11-29 | Routine/Complete Inspection | Violation(s) Noted | Gas venting from the 9 5/8" annulus. |
1980362 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | No Violations Noted | |
1993521 | Primary Facility | 2011-06-20 | Routine/Complete Inspection | No Violations Noted | |
1997608 | Primary Facility | 2011-07-06 | Routine/Complete Inspection | No Violations Noted | |
2001279 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | |
2024740 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | |
2035486 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | |
2049136 | Primary Facility | 2012-02-14 | Routine/Complete Inspection | No Violations Noted | |
2058973 | Primary Facility | 2012-03-08 | Routine/Complete Inspection | No Violations Noted | |
2111542 | Primary Facility | 2012-10-24 | Follow-up Inspection | No Violations Noted | |
2130527 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | |
2139887 | Primary Facility | 2013-02-05 | Routine/Complete Inspection | No Violations Noted | |
2150783 | Primary Facility | 2013-03-19 | Routine/Complete Inspection | No Violations Noted | |
2170031 | Primary Facility | 2013-05-29 | Routine/Complete Inspection | No Violations Noted | |
2196053 | Primary Facility | 2013-08-13 | Routine/Complete Inspection | No Violations Noted | |
2223719 | Primary Facility | 2013-11-19 | Routine/Complete Inspection | No Violations Noted | |
2232658 | Primary Facility | 2013-12-27 | Routine/Complete Inspection | No Violations Noted | |
2500008 | Primary Facility | 2016-06-27 | Site Restoration | No Violations Noted | |
2688326 | Primary Facility | 2018-01-30 | Routine/Complete Inspection | No Violations Noted | The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Ritchey Unit, Well # 3H on January 30, 2018.
There are 3 producing wells on this pad. Annulus is closed and not vented at time of inspection. Mechanical gauge on the production line reads pressure 500 PSI, the gauge on the annulus reads 0 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist. |
2818798 | Primary Facility | 2018-12-24 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on December 24, 2018. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.
The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and covered in snow. Well site restoration reports were previously submitted by LPR in June 2016. The Department denied those reports because the well heads were not properly labeled per OAG3211(h). The Department recommending addressing the labeling issue and then resubmitting well site restoration reports for wells 013-20012, 013-20013, and 013-20015. These reports shall be submitted through the Departments Greenport system. |
2854591 | Primary Facility | 2019-03-15 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on March 15, 2019. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.
The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and slopes are well vegetated. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1929531 | 600011 | 10/29/2010 | 2010-10-29 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | When cleaning up the pad liner, waste material was spilled on the pad from the liners. |
1931656 | 600639 | 11/29/2010 | 2010-11-29 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
600639 | 265808 | NOV - Notice of Violation |
For data sources see[8]