X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-013-20015

Well Details

Well ID: 37-013-20015
Loading map...
Country: United States
State: Pennsylvania
County: Blair
Municipality: Juniata Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149193
Farm/Lease Name: RITCHEY UNIT 3H
License Status:
Spud Date:
Permit Date: 2010-08-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.353253
Longitude: -78.565786

For data sources see[1][2][3]

Well History

Date Event
Deviated
2010-08-16 New Permit Application
2010-10-03 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-08-18 2011-08-18 6,838 3,628,968

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Base Fluid Water 100.00 85.25
FE OXCLEAR Universal Well Services Oxygen Scavenger Ammonium bisulfite 10192-30-0 0.01
Sand (Proppant) Universal Well Services Propping Agent Quartz 14808-60-7 99.90 14.59
ScaleHib 100 Universal Well Services Scale Inhibitor Ethylene glycol 107-21-1 0.04
Unislik ST 50 Universal Well Services Friction Reducer
Distillates, petroleum, hydrotreated light 64742-47-8 0.07
Biocide EC 6116A Universal Well Services Biocide Dibromoacetonitrile 3252-43-5 0.02
Polyethylene glycol 25322-68-3
2,2-Dibromo-3-nitrilopropionamide 10222-01-2

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 161,102.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 110,106.00 334 0.00 0 0.00 0
2015 LPR ENERGY LLC 65,660.55 200 0.00 0 0.00 0
2016 LPR ENERGY LLC 79,752.74 249 0.00 0 0.00 0
2017 LPR ENERGY LLC 78,157.00 348 0.00 0 0.00 0
2018 LPR ENERGY LLC 80,548.00 358 0.00 0 0.00 0
2019 LPR ENERGY LLC 70,869.00 363 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CHEVRON APPALACHIA LLC Drilling Fluid Waste 392.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 22.72 Tons LANDFILL 101397
2013 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 0.05 Tons LANDFILL 101397
2013 CHEVRON APPALACHIA LLC Produced Fluid 8,920.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,430.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 4,749.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015 LPR ENERGY LLC Produced Fluid 393.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 LPR ENERGY LLC Produced Fluid 1,121.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 LPR ENERGY LLC Produced Fluid 53.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2015 CHEVRON APPALACHIA LLC Produced Fluid 443.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 LPR ENERGY LLC Produced Fluid 531.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 LPR ENERGY LLC 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 1,191.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 LPR ENERGY LLC Produced Fluid 1,732.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC 405.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 365.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC 531.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 2,131.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC 2,131.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 525.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 1,067.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC 525.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 LPR ENERGY LLC Produced Fluid 250.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 LPR ENERGY LLC 517.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 LPR ENERGY LLC 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid 409.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 614.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 3,076.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 600.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 LPR ENERGY LLC Produced Fluid 3,482.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1919973 Primary Facility 2010-10-05 Drilling/Alteration No Violations Noted Patterson 255 is preparing to run 9 5/8" casing
1924077 Primary Facility 2010-10-27 Drilling/Alteration No Violations Noted Drilling completed moving rig off pad
1924760 Primary Facility 2010-10-06 Routine/Complete Inspection No Violations Noted
1929531 Primary Facility 2010-10-29 Routine/Complete Inspection Viol(s) Noted & Immediately Corrected
1931656 Primary Facility 2010-11-29 Routine/Complete Inspection Violation(s) Noted Gas venting from the 9 5/8" annulus.
1980362 Primary Facility 2011-04-12 Routine/Complete Inspection No Violations Noted
1993521 Primary Facility 2011-06-20 Routine/Complete Inspection No Violations Noted
1997608 Primary Facility 2011-07-06 Routine/Complete Inspection No Violations Noted
2001279 Primary Facility 2011-07-22 Routine/Complete Inspection No Violations Noted
2024740 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted
2035486 Primary Facility 2011-12-21 Routine/Complete Inspection No Violations Noted
2049136 Primary Facility 2012-02-14 Routine/Complete Inspection No Violations Noted
2058973 Primary Facility 2012-03-08 Routine/Complete Inspection No Violations Noted
2111542 Primary Facility 2012-10-24 Follow-up Inspection No Violations Noted
2130527 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted
2139887 Primary Facility 2013-02-05 Routine/Complete Inspection No Violations Noted
2150783 Primary Facility 2013-03-19 Routine/Complete Inspection No Violations Noted
2170031 Primary Facility 2013-05-29 Routine/Complete Inspection No Violations Noted
2196053 Primary Facility 2013-08-13 Routine/Complete Inspection No Violations Noted
2223719 Primary Facility 2013-11-19 Routine/Complete Inspection No Violations Noted
2232658 Primary Facility 2013-12-27 Routine/Complete Inspection No Violations Noted
2500008 Primary Facility 2016-06-27 Site Restoration No Violations Noted
2688326 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Ritchey Unit, Well # 3H on January 30, 2018.

There are 3 producing wells on this pad. Annulus is closed and not vented at time of inspection. Mechanical gauge on the production line reads pressure 500 PSI, the gauge on the annulus reads 0 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist.

2818798 Primary Facility 2018-12-24 Routine/Complete Inspection No Violations Noted Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on December 24, 2018. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.

The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and covered in snow.

Well site restoration reports were previously submitted by LPR in June 2016. The Department denied those reports because the well heads were not properly labeled per OAG3211(h). The Department recommending addressing the labeling issue and then resubmitting well site restoration reports for wells 013-20012, 013-20013, and 013-20015. These reports shall be submitted through the Departments Greenport system.

2854591 Primary Facility 2019-03-15 Routine/Complete Inspection No Violations Noted Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on March 15, 2019. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.

The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and slopes are well vegetated.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1929531 600011 10/29/2010 2010-10-29 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety When cleaning up the pad liner, waste material was spilled on the pad from the liners.
1931656 600639 11/29/2010 2010-11-29 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
600639 265808 NOV - Notice of Violation

For data sources see[8]

References