If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22192 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.613375,"lon":-76.3367,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Terry Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148328 | |
Farm/Lease Name: FERRARO NE BRA 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-04-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.613375 | |
Longitude: -76.3367 |
Date | Event |
---|---|
2012-04-25 | New Permit Application |
2012-08-27 | Performed Spud Operation |
2013-04-02 | Perforation |
2014-01-24 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-10 | 2013-04-17 | 7,616 | 5,698,390 | 395,973 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | PUMPCO | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 1.26861 | 0 |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 10.7403 | 0 | |
SC30 | X CHEM | Scale Inhibitor | Sodium Polyacrylate | 009003-04-7 | 100 | 0.00999 | 0 | |
B84, SC30, SFR-451, SFR-470 | X CHEM | Anti-Bacterial Agent, Friction Reducer, Scale Inhibitor | Proprietary Surfactant | TRADE SECRET | 0 | 0.05215 | 0 | |
Ethoxylated Oleylamine | 026635-93-8 | 0 | 0.03215 | 0 | ||||
Polypropenamide | 910644-97-2 | 0 | 0.03215 | 0 | ||||
Water | 007732-18-5 | 0 | 0.09925 | 0 | ||||
Polyacrylamide (Acrylamide, Ammonium Acrylate Copolymer) | 026100-47-0 | 0 | 0.02001 | 0 | ||||
Sorbitan Monooleate | 001338-43-8 | 0 | 0.05215 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 0 | 0.03215 | 0 | ||||
Sorbitol Tetraoleate | 061723-83-9 | 0 | 0.02001 | 0 | ||||
Polyethylene Glycol Monooleate | 009004-96-0 | 0 | 0.02001 | 0 | ||||
Ethoxylated Alcohol | 068439-50-9 | 0 | 0.03215 | 0 | ||||
Alcohol ethoxylate C-10/16 with 6.5 EO | 068002-97-1 | 0 | 0.03215 | 0 | ||||
Alcohols, C12-C14-Secondary, Ethoxylated | 084133-50-6 | 0 | 0.02001 | 0 | ||||
Northern White Sand | PUMPCO | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 13.3178 | 0 | |
Ferriplex 40 | PUMPCO | Iron Control Agent | Trisodium Nitrilotriacetate | 005064-31-3 | 40 | 0.00056 | 0 | |
Sodium Hydroxide | 001310-73-2 | 1 | 0.00001000 | 0 | ||||
Water | 007732-18-5 | 60 | 0.00084 | 0 | ||||
Sodium Sulfate | 007757-82-6 | 2 | 0.00003000 | 0 | ||||
SFR-470 | X CHEM | Friction Reducer | Alcohol ethoxylate C-10/16 with 6.5 EO | 068002-97-1 | 5 | 0.00122 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 35 | 0.00854 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 5 | 0.00122 | 0 | ||||
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 15 | 0.00366 | 0 | ||||
Ethoxylated Alcohol | 068439-50-9 | 5 | 0.00122 | 0 | ||||
Plexbreak 145 | PUMPCO | Non-Emulsifier | Diethanolamine | 000111-42-2 | 2 | 0.00001000 | 0 | |
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 15 | 0.00009000 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 15 | 0.00009000 | 0 | ||||
Coconut oil, Diethanolamide | 068603-42-9 | 10 | 0.00006000 | 0 | ||||
Water | 007732-18-5 | 65 | 0.0004 | 0 | ||||
Acid HCL | PUMPCO | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.04236 | 0 | |
Water | 007732-18-5 | 85 | 0.24003 | 0 | ||||
SFR-451 | X CHEM | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 35 | 0.01201 | 0 | |
Ammonium Acetate | 000631-61-8 | 6 | 0.00206 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 74.2894 | 0 | |
B84 | X CHEM | Anti-Bacterial Agent | Quaternary Ammonium Compound | 068424-85-1 | 6 | 0.00166 | 0 | |
Glutaraldehyde (Pentanediol) | 000111-30-8 | 27 | 0.00816 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 007173-51-5 | 8 | 0.00242 | 0 | ||||
Ethanol | 000064-17-5 | 4 | 0.00121 | 0 | ||||
Plexhib 256 | PUMPCO | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 60 | 0.00028 | 0 | |
Modified Thiourea Polymer | 068527-49-1 | 30 | 0.00014 | 0 | ||||
Alkenes^ C>10 alpha- | 064743-02-8 | 5 | 0.00002000 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00005000 | 0 | ||||
Ethoxylated Alcohols^ C14-15 | 068951-67-7 | 30 | 0.00014 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 1,190,628.00 | 117 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 2,311,325.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 1,573,257.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 1,386,761.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 1,127,721.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 965,834.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 1,162,302.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 54.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 54.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 989.73 Tons | LANDFILL | THR029 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 6,863.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 138.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,036.69 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 277.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 306.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 144.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 81.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 102.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.15 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 26.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2087225 | Primary Facility | 2012-07-25 | Routine/Complete Inspection | No Violations Noted | |
2095691 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | United Drilling on site working. At TD = 76', hole is dry. |
2099622 | Primary Facility | 2012-09-11 | Drilling/Alteration | No Violations Noted | NOMAC 44 Comp. Man - Marvin Loper |
2101064 | Primary Facility | 2012-09-19 | Drilling/Alteration | No Violations Noted | NOMAC 44, Comp. Man- Darrell McDowell drilling @ 8142' |
2465579 | Primary Facility | 2016-03-17 | Routine/Complete Inspection | No Violations Noted | |
2551818 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | Two Wells in production phase. Two each sand and water separators. Two production tanks within containment. No leaks detected. No violations noted. |
2688296 | Primary Facility | 2018-01-30 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted. |
2850807 | Primary Facility | 2019-03-08 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 11:29; the weather was ~33°F, calm, and overcast. The gate was open when I arrived and a well tender and and construction crew onsite putting up a building for a compressor already onsite.
There were properly tagged Marcellus wells staged for production. A total of 3 cellars were onsite; no bubbling was observed. There were 2 GPUs, sand separators, and produced water tanks onsite. A compressor was also onsite but was not running. Some areas around the pad were snow covered but the majority of the site was clear and appeared stable and well vegetated. A section of the stream bank at the culvert crossing along the access road showed signs of errosion (Photo #4). At the time of inspection no PCSM BMPs were noted. It is recommended that, if the pad meets restoration criteria, PCSM has been addressed, the site has been permanently stabilized, and it is appropriate to do so, an NOT and well site restoration report be submitted for review as needed. No violations wer |
For data sources see[8]