If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21391 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6939,"lon":-79.69925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Buffalo Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: WM RALSTON 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2004-08-19 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.6939 | |
Longitude: -79.699250 |
Date | Event |
---|---|
2004-08-19 | New Permit Application |
2004-12-08 | Performed Spud Operation |
2004-12-15 | Drilling Completion |
2004-12-22 | Perforation |
2005-02-17 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 1,529.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 1,317.00 | 363 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 1,151.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 1,137.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 1,139.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 912.4 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 797.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 549.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 615.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Produced Fluid | 35.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1403019 | Primary Facility | 2004-12-17 | Drilling/Alteration | No Violations Noted | |
1417886 | Primary Facility | 2005-02-11 | Administrative/File Review | No Violations Noted | well record review |
1433479 | Primary Facility | 2005-03-24 | Site Restoration | No Violations Noted | |
2755974 | Primary Facility | 2018-07-18 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well appears to be producing. All the valves were open for production. Well integrity appeared to be in good condition, with no signs of any leaks or spills. Well was painted so there was no evident corrosion. Well was hooked up to a heater and corrector and drip. There was also a separator, but the valves to it were closed. A 50 bbl poly tank was also located onsite which the valves were closed to it as well. There was a label attached to the well. Access to well is through a locked gate and about 100 yards through a field. There was 2" tubing within 4 1/2" casing . Well record says that there is also 7" and 9 5/8" casing in the well. Also fresh water was noted at 483', brine at 895', and gas at 3129'. Production was reported in 2017 as 549 mcf for 334 days. |
For data sources see[7]