Well ID: 37-019-21553
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Allegheny Township
Operator Name: EM ENERGY PA LLC
Well Pad ID: 146248
Farm/Lease Name: F ROSS
License Status: Plugged and Abandoned
Spud Date: 2008-04-28
Permit Date: 2008-02-14
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 41.113621
Longitude: -79.740299

For data sources see[1][2][3]

Well History

Date Event
2008-02-14 New Permit Application
2008-04-25 Performed Spud Operation
2008-05-06 Drilling Completion
2009-10-05 Perforation
2009-10-08 Performed Stimulation
2009-11-30 Newly Drilled
2017-11-14 Begin Plugging
2017-11-17 Finished Plugging

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2009-10-08 Sand 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 BLX INC 432.00 4 0.00 0 0.00 0
2010 BLX INC 14,688.06 127 0.00 0 219.14 127
2011 BLX INC 33,879.39 215 0.00 0 0.00 0
2012 BLX INC 18,531.26 119 164.41 103 157.03 16
2013 EM ENERGY PA LLC 33,460.83 165 0.00 0 30.60 11
2014 EM ENERGY PA LLC 30,166.00 214 0.00 0 0.00 0
2015 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2016 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2017 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0
2019 EM ENERGY PA LLC 0.00 0 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 BLX INC Brine 425.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 BLX INC Fracing Fluid Waste 480.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 BLX INC Produced Fluid 180.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 BLX INC Produced Fluid 77.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 BLX INC Produced Fluid 70.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013 REDMILL DRILLING Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-22403

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1702746 Primary Facility 2008-04-29 Drilling/Alteration No Violations Noted
1703314 Primary Facility 2008-05-01 Drilling/Alteration No Violations Noted
1708972 Primary Facility 2008-05-15 Routine/Complete Inspection No Violations Noted
1713071 Primary Facility 2008-06-12 Drilling/Alteration No Violations Noted
1713520 Primary Facility 2008-06-05 Routine/Complete Inspection No Violations Noted
1841978 Primary Facility 2009-11-09 Routine/Complete Inspection No Violations Noted
1901928 Primary Facility 2010-07-27 Routine/Complete Inspection No Violations Noted
2375862 Primary Facility 2015-06-03 Routine/Partial Inspection No Violations Noted
2412581 Primary Facility 2015-10-01 Routine/Partial Inspection No Violations Noted
2660606 Primary Facility 2017-11-15 Plugging(Includes Plugged/Mined Through) No Violations Noted ID sign was posted at the end of the jurisdictional road. Equipment was rigged up on grass to the extent possible. Waiting on fresh water when I arrived. Plan was to cement through tubing from 5582 to 5000. Mixed, pumped and displaced approximately 50 sks of cement. Tubing was pulling dry.

BOB was being used.

2662742 Primary Facility 2017-11-14 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, NWP is onsite setting up to plug well. The gate valves are still hooked up to the well. Valves were opened while onsite and no pressure was encountered. Plan was to get tubing to bottom today and begin plugging tomorrow.
2664006 Primary Facility 2017-11-16 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, NWP just finished cementing Stage 2 of the job. Bottom stage set from 5582' (TD) to 5000'. A cast iron bridge plug was set here. From 5000'-3765', gel was placed. 4 1/2" casing was cut at 3765' and pulled up. Stage 2 was set from here to 3470' with 54 sxs cement.
2664009 Primary Facility 2017-11-21 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, cement plugs have all been set. NWP has moved rig offsite. A pipe truck and 2 plastic totes remain at the site, one is covering the wellhead. Stone drop was 2 seconds and hit water. This will need emptied prior to venting. Since last inspection, gel was added from 3470'-2430', then cement from here to 1840' using 106 sxs cement. Gel was again added from 1840'-1650'. A 4th cement plug was set from 1650'-1490' using 295 sxs cement. More gel was set to 495' and a 100' cement plug was set to give a top of cement at 395'.
2671005 Primary Facility 2017-12-14 Administrative/File Review No Violations Noted