X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-21597

Well Details

Well ID: 37-019-21597
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Winfield Township
Operator Name: REDMILL DRILLING
Well Pad ID: 146489
Farm/Lease Name: D BREWER 1 67.3
License Status:
Spud Date:
Permit Date: 2009-03-30
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: No
Latitude: 40.764950
Longitude: -79.743740

For data sources see[1][2][3]

Well History

Date Event
2009-03-30 New Permit Application
2009-06-29 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 BLX INC 0.00 0 0.00 0 0.00 0
2010 BLX INC 9,905.70 73 0.00 0 0.00 0
2011 BLX INC 38,488.86 360 0.00 0 0.00 0
2012 BLX INC 29,819.57 362 0.00 0 0.00 0
2013 REDMILL DRILLING 24,884.52 358 0.00 0 0.00 0
2014 REDMILL DRILLING 20,547.84 363 0.00 0 0.00 0
2015 REDMILL DRILLING 18,798.95 354 0.00 0 0.00 0
2016 REDMILL DRILLING 18,461.36 355 0.00 0 0.00 0
2017 REDMILL DRILLING 14,555.65 358 0.00 0 0.00 0
2018 REDMILL DRILLING 15,212.40 358 0.00 0 0.00 0
2019 REDMILL DRILLING 13,927.01 345 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 BLX INC Produced Fluid 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 BLX INC Fracing Fluid Waste 4,920.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010 BLX INC Fracing Fluid Waste 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 BLX INC Produced Fluid 219.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 BLX INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 BLX INC Produced Fluid 400.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013 BLX INC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2013 REDMILL DRILLING Produced Fluid 98.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2014 REDMILL DRILLING Produced Fluid 115.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2015 REDMILL DRILLING Produced Fluid 35.00 Bbl INJECTION DISPOSAL WELL 34-151-23420
2016 REDMILL DRILLING Produced Fluid 50.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 REDMILL DRILLING Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 REDMILL DRILLING Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1806390 Primary Facility 2009-06-22 Drilling/Alteration No Violations Noted
1808727 Primary Facility 2009-06-29 Drilling/Alteration No Violations Noted
1808730 Primary Facility 2009-06-30 Drilling/Alteration No Violations Noted
1809573 Primary Facility 2009-07-01 Drilling/Alteration No Violations Noted
1810278 Primary Facility 2009-07-07 Drilling/Alteration No Violations Noted
1885449 Primary Facility 2010-05-19 Drilling/Alteration No Violations Noted
1992504 Primary Facility 2011-07-29 Routine/Partial Inspection No Violations Noted
2749730 Primary Facility 2018-07-03 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks or spills. There was only some minor rust on the well. The well was hooked up to a heater and separator. There was also a chart which had been changed on 7/2. A meter for house gas was being used. There were two 100 bbl fiberglass tanks within an earthen dike near the well. The well was properly labeled and the Emergency Response sign was posted at the site entrance. Production is being reported to the Department.
2827735 Primary Facility 2019-01-15 Routine/Partial Inspection No Violations Noted On 1/15/2019, WQS Brian MacQuarrie onsite. Sign posted at access road entrance. One well in production. Well properly tagged. Separator installed. Two 100 bbl Fiberglass tanks installed within earthen diking.

For data sources see[7]

References