X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-21903

Well Details

Well ID: 37-019-21903
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: XTO ENERGY INC
Well Pad ID: 147573
Farm/Lease Name: PAUL SMITH UNIT 1H
License Status:
Spud Date:
Permit Date: 2011-10-21
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.793506
Longitude: -79.829056

For data sources see[1][2][3]

Well History

Date Event
2011-10-21 New Permit Application
2012-02-20 Performed Spud Operation
2012-04-29 Drilling Completion
2012-09-01 Perforation
2014-04-01 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-07 2012-11-07 6,151 5,023,946

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Corrosion Inhibitor - EcoAcid CI Geosafe Chemicals Corrosion Inhibitor Other -(non hazardous) 50.00 0.00022000
100.00
Diethylene glycol monobutyl ether 112-34-5 50.00 0.00022000
Water Water 7732-18-5 100.00 89.72
Scale Inhibitor - MC-MX-588-2 Multi-Chem Group Scale Inhibitor
Other -(non hazardous) 100.00 0.01
Biocide - MC 8520 Multi-Chem Group Biocide 2-Amino-2-methylpropan-1-ol 124-68-5 0.50 0.00006000
3,4,4-Trimethyloxazolidine 75673-43-7 4.50 0.00054000
4,4-Dimethyloxazolidine 51200-87-4 95.00 0.01
Clay Stabilizer - ClaChek G Shrieve Clay Stabilizer Not hazardous 70.00 0.00270000
Water 7732-18-5 30.00 0.00110000
Acid - 15 HCl Acid PPG Industries Acid
Hydrochloric acid 7647-01-0 15.00 0.19
Other -(non hazardous) 85.00 1.05
Sand Proppant Quartz 14808-60-7 100.00 8.88
Friction Reducer - MC MX-14-5 Multi-Chem Group Friction Reducer Other -(non hazardous) 70.00 0.05
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Biocide - MC 8650 Multi-Chem Group Biocide Glutaraldehyde 111-30-8 60.00 0.00320000
Other -(non hazardous) 40.00 0.00210000
Acid - 7.5 HCl Acid PPG Industries Acid
Other -(non hazardous) 92.50 0.04
Hydrochloric acid 7647-01-0 7.50 0.00400000

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2013 XTO ENERGY INC 388,504.00 194 0.00 0 0.00 0
2014 XTO ENERGY INC 615,240.00 357 0.00 0 0.00 0
2015 XTO ENERGY INC 468,313.00 359 0.00 0 0.00 0
2016 XTO ENERGY INC 249,345.00 272 0.00 0 0.00 0
2017 XTO ENERGY INC 382,649.00 365 0.00 0 0.00 0
2018 XTO ENERGY INC 228,591.86 266 0.00 0 0.00 0
2019 XTO ENERGY INC 291,679.93 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 XTO ENERGY INC Drill Cuttings 850.68 Tons CENT WASTE TRT FAC NPDES DISCHARGE 100403
2012 XTO ENERGY INC Drill Cuttings 850.68 Tons CENT WASTE TRT FAC NPDES 100403
2013 XTO ENERGY INC Fracing Fluid Waste 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2013 XTO ENERGY INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Fracturing Fluid Waste 148.11 Tons LANDFILL 100585
2013 XTO ENERGY INC Produced Fluid 215.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 XTO ENERGY INC Fracing Fluid Waste 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 XTO ENERGY INC Produced Fluid 4,085.00 Bbl CENT WASTE TRT FAC NPDES PA0254185
2013 XTO ENERGY INC Produced Fluid 4,085.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2013 XTO ENERGY INC Produced Fluid 307.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 331.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 216.20 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 3,341.42 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 119.90 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 1,820.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 207.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 335.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 385.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 1,507.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 43.75 Bbl RESIDUAL WASTE PROCESSING FACILITY 101674
2018 XTO ENERGY INC Produced Fluid 1,629.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 178.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 393.47 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 831.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2044869 Primary Facility 2012-02-23 Drilling/Alteration No Violations Noted
2048415 Primary Facility 2012-02-28 Routine/Partial Inspection No Violations Noted
2056775 Primary Facility 2012-04-04 Routine/Partial Inspection No Violations Noted
2059527 Primary Facility 2012-04-12 Drilling/Alteration No Violations Noted
2064084 Primary Facility 2012-04-30 Drilling/Alteration No Violations Noted
2121463 Primary Facility 2012-12-03 Routine/Partial Inspection No Violations Noted
2139845 Primary Facility 2013-02-14 Routine/Partial Inspection No Violations Noted
2163782 Primary Facility 2013-05-01 Routine/Partial Inspection No Violations Noted
2366298 Primary Facility 2015-04-29 Routine/Partial Inspection No Violations Noted
2374853 Primary Facility 2015-05-27 Routine/Partial Inspection No Violations Noted
2692786 Primary Facility 2018-02-09 Routine/Partial Inspection No Violations Noted On 02/09/2018, WQS Brian MacQuarrie onsite. Site sign installed and maintained. One well properly tagged and in production. One 400 bbl produced water tank installed within stainless steel secondary containment. Freshwater impoundment fenced in and located adjacent to well pad. Snow on ground.

For data sources see[8]

References