X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22025

Well Details

Well ID: 37-019-22025
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jackson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 144590
Farm/Lease Name: BAILLIE TRUST UNIT 4H
License Status:
Spud Date:
Permit Date: 2013-01-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.760458
Longitude: -80.087081

For data sources see[1][2][3]

Well History

Date Event
2013-01-29 New Permit Application
2013-04-15 Performed Spud Operation
2013-05-14 Drilling Completion
2013-09-20 Perforation
2014-08-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-25 2013-10-18 5,586 6,363,000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand Vertex Proppant Silica Sand 14808-60-7 100 10.4106 0
Water Rex Base Fluid Water 7732-18-5 100 87.9424 0
FE-100L ICI Iron Control Citric Acid 77-92-9 55 0.00269 0
Acid FTS Acidizing Hydrochloric Acid 007647-01-0 7.5 0.11142 0
HVG-1 FTS Gel Petroleum Distillate 64742-47-8 50 0.00111 0
Surfactant 68439-51-0 2.5 0.00006000 0
Clay 14808-60-7 2.5 0.00006000 0
Guar Gum 9000-30-0 45 0.001 0
ICI-3240 ICI Bacteriacide Sodium Hydroxide 1310-73-2 4 0.00189 0
Dazomet 533-74-4 24 0.01136 0
FRW-200W ICI Friction Reducer Ethylene Glycol 107-21-1 4 0.00227 0
Petroleum Distillate 64742-47-8 30 0.01703 0
CS-500 SI ICI Scale Inhibitor Ethylene Glycol 107-21-1 10 0.00461 0
NE-100L ICI Non-Emulsifier 2-Propanol 67-63-0 10 0.00014 0
Dodecylbenzenesulfonic Acid 27176-87-0 5 0.00007000 0
2-Butoxyethenol 111-76-2 10 0.00014 0
APB-1 FTS Breaker Ammonium Persulfate 7727-54-0 95 0.00004000 0
CI-150L ICI Corrosion Inhibitor Quaternary Ammonium Compound Proprietary 5 0.00013 0
Aromatic Aldehyde Proprietary 5 0.00013 0
Dimethylformamide 68-12-2 10 0.00025 0
Organic Amine Resin Salt Proprietary 10 0.00025 0
Isopropanol 67-63-0 30 0.00076 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 RE GAS DEV LLC 94,842.44 35 0.00 0 136.94 35
2014 RE GAS DEV LLC 708,480.78 365 559.12 184 974.00 181
2015 RE GAS DEV LLC 526,698.85 357 0.00 0 426.65 328
2016 RE GAS DEV LLC 471,372.21 363 0.00 0 122.00 363
2017 RE GAS DEV LLC 442,904.72 360 0.00 0 67.40 237
2018 PENNENERGY RESOURCES LLC 354,459.22 360 0.00 0 48.55 208
2019 PENNENERGY RESOURCES LLC 316,731.00 361 0.00 0 206.00 62

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 RE GAS DEV LLC Produced Fluid 1,485.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2013 RE GAS DEV LLC Produced Fluid 553.35 Bbl INJECTION DISPOSAL WELL 34-155-23223
2013 RE GAS DEV LLC Produced Fluid 130.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2013 RE GAS DEV LLC Drill Cuttings 865.13 Tons LANDFILL 100585
2013 RE GAS DEV LLC Produced Fluid 258.77 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2013 RE GAS DEV LLC Produced Fluid 1,095.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2013 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-007-24523
2013 RE GAS DEV LLC Produced Fluid 471.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 RE GAS DEV LLC Produced Fluid 840.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-155-23759
2014 RE GAS DEV LLC Produced Fluid 60.00 Bbl INJECTION DISPOSAL WELL 34-155-23732
2014 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-031-27178
2014 RE GAS DEV LLC Produced Fluid 1,401.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2014 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-24076
2014 RE GAS DEV LLC Produced Fluid 958.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2014 RE GAS DEV LLC Produced Fluid 435.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2014 RE GAS DEV LLC Produced Fluid 615.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2014 RE GAS DEV LLC Produced Fluid 1,696.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2014 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-24075
2015 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-155-24063
2015 RE GAS DEV LLC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-155-24076
2015 RE GAS DEV LLC Produced Fluid 1,162.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2015 RE GAS DEV LLC Produced Fluid 105.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-553
2015 RE GAS DEV LLC Produced Fluid 300.00 Bbl INJECTION DISPOSAL WELL 34-151-21179
2015 RE GAS DEV LLC Produced Fluid 894.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Produced Fluid 205.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 675.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 RE GAS DEV LLC Produced Fluid 925.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 3192
2016 RE GAS DEV LLC Produced Fluid 440.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 195.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 880.00 Bbl REUSE (AT WELL PAD)
2017 RE GAS DEV LLC Produced Fluid 1,715.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 RE GAS DEV LLC Produced Fluid 1,025.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 735.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 PENNENERGY RESOURCES LLC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 RE GAS DEV LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 98.90 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 27.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 302.10 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 795.13 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 37.10 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 117.14 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 119.30 Bbl INJECTION DISPOSAL WELL 34-155-22403

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2157238 Primary Facility 2013-04-12 Routine/Partial Inspection No Violations Noted
2157411 Primary Facility 2013-04-15 Drilling/Alteration No Violations Noted
2166064 Primary Facility 2013-05-08 Routine/Partial Inspection No Violations Noted
2247447 Primary Facility 2014-02-13 Routine/Partial Inspection No Violations Noted
2275580 Primary Facility 2014-06-02 Routine/Partial Inspection No Violations Noted
2299943 Primary Facility 2014-08-29 Routine/Partial Inspection No Violations Noted
2654762 Primary Facility 2017-10-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well appears to be producing. Well integrity is in good condition, with no signs of any leaks or spills at the site. The wellhead has very minor rust on it which is superficial. A gauge for casing was reading 295 psi. Cellar was filled with gravel. No water present. The well is properly labeled. The Emergency Response sign remains posted at the lease access entrance. There is a tank for condensate and one for water for each well on the pad contained in an earthen dike (12 total). There are 6 line heaters also present. A gas buster is hooked up as well. Pad is fenced in.
2683194 Primary Facility 2018-01-17 Routine/Complete Inspection No Violations Noted On 1/17/2018, WQS Brian MacQuarrie onsite. Site sign posted at access road entrance. Well pad fenced in and locked. Six wells tagged and in production. Twelve 400 bbl tanks ( six production fluids and six condensate) and six GPUs installed within stainless steel secondary containment. Snow on ground during inspection. No apparent issues.
2787482 Primary Facility 2018-10-11 Site Restoration No Violations Noted On 10/11/2018, WQS Brian MacQuarrie onsite for the purpose of conducting a Notice of Termination inspection for ESCGP ESX13-019-0002. Site consists of six producing wells; 1H-019-22023, 2H-019-22024, 4H-019-22025, 3H-019-22030, 5HB-019-22026 and 6HB-019-22067. Tank battery consists of twelve 400 bbl tanks installed within containment. The well site has achieved permanent stabilization according to 25 Pa Code 102.22(a)(2). Therefore, the Notice of Termination request is approved.

For data sources see[8]

References