X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22058

Well Details

Well ID: 37-019-22058
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Oakland Township
Operator Name: XTO ENERGY INC
Well Pad ID: 144824
Farm/Lease Name: CLOUSE UNIT 1H
License Status:
Spud Date:
Permit Date: 2013-04-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.916050
Longitude: -79.823397

For data sources see[1][2][3]

Well History

Date Event
2013-04-29 New Permit Application
2014-01-15 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-27 2015-02-13 5,765 5,964,050 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0376732 21121.1
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0161457 9051.91
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Methanol 67-56-1 5 0.00002595 14.551
Formaldehyde 50-00-0 1 0.00000519 2.91
Short chained glycol ether 112-34-5 60 0.000311455 174.614
Acetophenone 98-86-2 1 0.00000519 2.91
Thiourea 62-56-6 1 0.00000519 2.91
Ethoxylated alcohol 68002-97-1 35 0.000181682 101.858
Hydrochloric Acid (7.5%) Axiall Acidizing Other - (non-hazardous) NA 92.5 0.97255 545250
Hydrochloric Acid 7647-01-0 7.5 0.0417934 23431
Hydrochloric Acid 7647-01-0 7.5 0.0197138 11052.4
Hydrochloric Acid 7647-01-0 7.5 0.0173482 9726.08
Sand (Proppant) Universal Proppant Silica Substrate NA 100 10.0216 5,618,500.0
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.7736 49,770,000.0
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.00713684 4001.2
Ethylene Glycol 107-21-1 30 0.00305865 1714.8
Biocide, EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00593903 3329.66
Other - (non-hazardous) NA 5 0.000494919 277.471
Dibromoacetonitrile 3252-43-5 5 0.000494919 277.471
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00296951 1664.83
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00627591 3518.53
Hydrochloric Acid 7647-01-0 15 0.0026051 1460.52
Other - (non-hazardous) NA 85 0.067101 37619.5
Hydrochloric Acid 7647-01-0 15 0.00296034 1659.68

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 285,954.00 206 0.00 0 464.19 206
2016 XTO ENERGY INC 215,708.00 316 0.00 0 629.31 255
2017 XTO ENERGY INC 112,875.00 169 0.00 0 549.08 169
2018 XTO ENERGY INC 235,443.57 233 0.00 0 972.35 233
2019 XTO ENERGY INC 265,969.36 348 0.00 0 1,295.91 348

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 1,071.36 Tons LANDFILL 100403
2015 XTO ENERGY INC Fracing Fluid Waste 576.64 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 1,000.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 188.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 12,370.51 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 926.30 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 128.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,350.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 240.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 121.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 1,246.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 102.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 578.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 2,398.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 1,291.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 60.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 584.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 341.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2239347 Primary Facility 2014-01-16 Drilling/Alteration No Violations Noted
2260818 Primary Facility 2014-04-03 Drilling/Alteration No Violations Noted
2275223 Primary Facility 2014-05-28 Drilling/Alteration No Violations Noted
2323896 Primary Facility 2014-11-24 Routine/Partial Inspection No Violations Noted
2338980 Primary Facility 2015-01-26 Routine/Partial Inspection No Violations Noted
2595732 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted On site for a partial inspection of Clouse Unit 1H well.

Well is completed, production equipment in place (production tanks & GPU) & in containment. Well is fenced and has a jersey barrier. Well tag in place. Site has 1 combustor, and well is connected to a pipeline, with a pipeline header on well pad.

All temporary site E/S controls are removed, & PCSM plan implemented. Site is stabilized with 100% vegetation growth.

For data sources see[8]

References