If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22142 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.865667,"lon":-79.783956,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Summit Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 150096 | |
Farm/Lease Name: GEIBEL UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-08-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.865667 | |
Longitude: -79.783956 |
Date | Event |
---|---|
2013-08-27 | New Permit Application |
2013-10-03 | Performed Spud Operation |
2013-11-16 | Drilling Completion |
2014-04-02 | Perforation |
2015-01-22 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-29 | 2014-06-10 | 5,926 | 5,875,580 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Friction Reducer, EXP F1111-13 | Nabors | Friction Reducer | Alcohol Ethoxylates component | 68585-36-4 | 5 | 0.00227054 | 1253.85 |
Petroleum distillate hydrotreated light | 64742-47-8 | 35 | 0.0158938 | 8776.94 | ||||
Alcohol Ethoxylates Component | 69227-21-0 | 5 | 0.00227054 | 1253.85 | ||||
Ethylene Glycol | 107-21-1 | 4 | 0.00181643 | 1003.08 | ||||
Anionic Polyacrylamide | 38193-60-1 | 35 | 0.0158938 | 8776.94 | ||||
Sorbitan Monoolite | 1338-43-8 | 5 | 0.00227054 | 1253.85 | ||||
Hydrochloric Acid (15%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0253875 | 14019.6 | |
Other - (non-hazardous) | NA | 85 | 0.143863 | 79444.4 | ||||
Scale Inhibitor, TSC | Nabors | Scale Inhibitor | Propylene glycol | 57-55-6 | 40 | 0.00392736 | 2168.78 | |
Other -(non hazardous) | NA | 15 | 0.00147276 | 813.294 | ||||
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt | 93858-78-7 | 15 | 0.00147276 | 813.294 | ||||
Anionic copolymer | NA | 15 | 0.00147276 | 813.294 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0926644 | 51171.5 | |
Other - (non-hazardous) | NA | 92.5 | 1.14286 | 631116 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.7895 | 49,031,700.0 | |
Sand (Proppant) | Nabors | Proppant | Silica Substrate | NA | 100 | 9.73318 | 5,374,900.0 | |
Acid Corrosion Inhibitor, A12 | Nabors | Corrosion Inhibitor | Propargyl Alcohol | 107-19-7 | 30 | 0.000408966 | 225.841 | |
Other -(non hazardous) | NA | 3 | 0.00004090 | 22.584 | ||||
Isopropyl Alcohol | 67-63-0 | 30 | 0.000408966 | 225.841 | ||||
Short Chained glycol ether | 112-34-5 | 30 | 0.000408966 | 225.841 | ||||
Proprietary Component | NA | 7 | 0.00009543 | 52.696 | ||||
Biocide KR-153SL | Nabors | Biocide | Polyethylene Glycol | 25322-68-3 | 50 | 0.00798082 | 4407.2 | |
2,2-Dibromo-3-nitrilo-propionamide | 10222-01-2 | 20 | 0.00319233 | 1762.88 | ||||
Other -(non hazardous) | NA | 30 | 0.00478849 | 2644.32 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 23,434.00 | 85 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 54,210.00 | 326 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 56,856.00 | 321 | 0.00 | 0 | 65.83 | 223 |
2017 | XTO ENERGY INC | 19,087.00 | 141 | 0.00 | 0 | 26.66 | 92 |
2018 | XTO ENERGY INC | 6,883.33 | 276 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 4,597.78 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 1,002.00 Tons | LANDFILL | 100403 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 6,823.18 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 519.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 299.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 518.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 250.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 798.40 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 489.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 5,876.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,628.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,812.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 110.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 547.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 53.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 13.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2210423 | Primary Facility | 2013-10-04 | Routine/Partial Inspection | No Violations Noted | |
2215294 | Primary Facility | 2013-10-23 | Routine/Partial Inspection | No Violations Noted | |
2222784 | Primary Facility | 2013-11-15 | Drilling/Alteration | No Violations Noted | |
2341661 | Primary Facility | 2015-02-04 | Routine/Partial Inspection | No Violations Noted | |
2523285 | Primary Facility | 2016-09-27 | Routine/Partial Inspection | No Violations Noted | |
2598393 | Primary Facility | 2017-05-30 | Routine/Partial Inspection | No Violations Noted | On site for a partial inspection of the Geibel Unit 2H well.
Well is drilled & completed, and in production. Well tag in place. On site production installed. Well is connected to a gathering pipeline. Site has well development water pipeline equipment on site. All temporary E/S controls removed. PCSM plan implemented. Site has 100% vegetation. |
2634212 | Primary Facility | 2017-08-30 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, it appears well is shut in. The well integrity was in good condition, with no signs of any leaks or spills at the well. The well is labeled and Emergency Response sign remains posted at the access road entrance. There are 5 line heaters and 6 tanks all contained in a lined, steel dike. There is also a gas buster onsite to destroy any gasses in the tanks. |
For data sources see[8]