X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22142

Well Details

Well ID: 37-019-22142
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Summit Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150096
Farm/Lease Name: GEIBEL UNIT 2H
License Status:
Spud Date:
Permit Date: 2013-08-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.865667
Longitude: -79.783956

For data sources see[1][2][3]

Well History

Date Event
2013-08-27 New Permit Application
2013-10-03 Performed Spud Operation
2013-11-16 Drilling Completion
2014-04-02 Perforation
2015-01-22 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-29 2014-06-10 5,926 5,875,580 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, EXP F1111-13 Nabors Friction Reducer Alcohol Ethoxylates component 68585-36-4 5 0.00227054 1253.85
Petroleum distillate hydrotreated light 64742-47-8 35 0.0158938 8776.94
Alcohol Ethoxylates Component 69227-21-0 5 0.00227054 1253.85
Ethylene Glycol 107-21-1 4 0.00181643 1003.08
Anionic Polyacrylamide 38193-60-1 35 0.0158938 8776.94
Sorbitan Monoolite 1338-43-8 5 0.00227054 1253.85
Hydrochloric Acid (15%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 15 0.0253875 14019.6
Other - (non-hazardous) NA 85 0.143863 79444.4
Scale Inhibitor, TSC Nabors Scale Inhibitor Propylene glycol 57-55-6 40 0.00392736 2168.78
Other -(non hazardous) NA 15 0.00147276 813.294
2-Phosphonobutane-1,2,4-tricarboxylic acid, potassium salt 93858-78-7 15 0.00147276 813.294
Anionic copolymer NA 15 0.00147276 813.294
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0926644 51171.5
Other - (non-hazardous) NA 92.5 1.14286 631116
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.7895 49,031,700.0
Sand (Proppant) Nabors Proppant Silica Substrate NA 100 9.73318 5,374,900.0
Acid Corrosion Inhibitor, A12 Nabors Corrosion Inhibitor Propargyl Alcohol 107-19-7 30 0.000408966 225.841
Other -(non hazardous) NA 3 0.00004090 22.584
Isopropyl Alcohol 67-63-0 30 0.000408966 225.841
Short Chained glycol ether 112-34-5 30 0.000408966 225.841
Proprietary Component NA 7 0.00009543 52.696
Biocide KR-153SL Nabors Biocide Polyethylene Glycol 25322-68-3 50 0.00798082 4407.2
2,2-Dibromo-3-nitrilo-propionamide 10222-01-2 20 0.00319233 1762.88
Other -(non hazardous) NA 30 0.00478849 2644.32

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 23,434.00 85 0.00 0 0.00 0
2015 XTO ENERGY INC 54,210.00 326 0.00 0 0.00 0
2016 XTO ENERGY INC 56,856.00 321 0.00 0 65.83 223
2017 XTO ENERGY INC 19,087.00 141 0.00 0 26.66 92
2018 XTO ENERGY INC 6,883.33 276 0.00 0 0.00 0
2019 XTO ENERGY INC 4,597.78 361 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 1,002.00 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 6,823.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 519.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Produced Fluid 299.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 XTO ENERGY INC Produced Fluid 518.80 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Fracing Fluid Waste 210.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 250.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 798.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 91.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 489.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 5,876.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,628.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,812.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 110.80 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 547.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 53.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 13.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2210423 Primary Facility 2013-10-04 Routine/Partial Inspection No Violations Noted
2215294 Primary Facility 2013-10-23 Routine/Partial Inspection No Violations Noted
2222784 Primary Facility 2013-11-15 Drilling/Alteration No Violations Noted
2341661 Primary Facility 2015-02-04 Routine/Partial Inspection No Violations Noted
2523285 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted
2598393 Primary Facility 2017-05-30 Routine/Partial Inspection No Violations Noted On site for a partial inspection of the Geibel Unit 2H well.

Well is drilled & completed, and in production. Well tag in place. On site production installed. Well is connected to a gathering pipeline. Site has well development water pipeline equipment on site.

All temporary E/S controls removed. PCSM plan implemented. Site has 100% vegetation.

2634212 Primary Facility 2017-08-30 Routine/Partial Inspection No Violations Noted At the time of inspection, it appears well is shut in. The well integrity was in good condition, with no signs of any leaks or spills at the well. The well is labeled and Emergency Response sign remains posted at the access road entrance. There are 5 line heaters and 6 tanks all contained in a lined, steel dike. There is also a gas buster onsite to destroy any gasses in the tanks.

For data sources see[8]

References