37-019-22149

Well Details

Well ID: 37-019-22149
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Oakland Township
Operator Name: XTO ENERGY INC
Well Pad ID: 144824
Farm/Lease Name: CLOUSE UNIT 2H
License Status:
Spud Date:
Permit Date: 2013-10-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.915961
Longitude: -79.823539

For data sources see[1][2][3]

Well History

Date Event
2013-10-22 New Permit Application
2014-03-12 Drilling Completion
2014-03-28 Performed Spud Operation
2015-05-08 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-02 2015-01-23 5,770 6,486,850 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short chained glycol ether 112-34-5 60 0.00032976 199.692
Methanol 67-56-1 5 0.00002748 16.641
Acetophenone 98-86-2 1 0.00000550 3.328
Formaldehyde 50-00-0 1 0.00000550 3.328
Thiourea 62-56-6 1 0.00000550 3.328
Ethoxylated alcohol 68002-97-1 35 0.00019236 116.487
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0162439 9836.75
Other - (non-hazardous) NA 70 0.0379024 22952.4
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.3921 54,132,800.0
Biocide, EC6116A Nalco Biocide Other - (non-hazardous) NA 5 0.000478872 289.989
Polyethylene Glycol 25322-68-3 60 0.00574647 3479.86
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00287323 1739.93
Dibromoacetonitrile 3252-43-5 5 0.000478872 289.989
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.0030805 1865.44
Other - (non-hazardous) NA 70 0.00718783 4352.7
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0449989 27249.8
Other - (non-hazardous) NA 92.5 1.04714 634114
Hydrochloric Acid 7647-01-0 7.5 0.0212259 12853.7
Hydrochloric Acid 7647-01-0 7.5 0.0186788 11311.2
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00591276 3580.57
Other - (non-hazardous) NA 85 0.0632182 38282.8
Hydrochloric Acid 7647-01-0 15 0.00245435 1486.27
Hydrochloric Acid 7647-01-0 15 0.00278904 1688.95
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.32698 5,648,100.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 215,727.00 198 0.00 0 302.35 163
2016 XTO ENERGY INC 207,289.00 306 0.00 0 422.96 252
2017 XTO ENERGY INC 53,208.00 139 0.00 0 171.84 135
2018 XTO ENERGY INC 86,357.84 146 118.75 30 398.63 103
2019 XTO ENERGY INC 148,479.54 295 0.00 0 442.98 246

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Drill Cuttings 1,796.42 Tons LANDFILL 100403
2014 XTO ENERGY INC Drilling Fluid Waste 770.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 1,558.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Fracing Fluid Waste 576.64 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 10,497.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 533.20 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 128.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 237.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 218.80 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 2,193.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,920.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 225.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 285.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 592.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 1,009.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 570.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 37.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2239348 Primary Facility 2014-01-16 Drilling/Alteration No Violations Noted
2254130 Primary Facility 2014-03-17 Drilling/Alteration No Violations Noted
2264962 Primary Facility 2014-04-16 Drilling/Alteration No Violations Noted
2323900 Primary Facility 2014-11-24 Routine/Partial Inspection No Violations Noted
2338982 Primary Facility 2015-01-26 Routine/Partial Inspection No Violations Noted
2377848 Primary Facility 2015-06-05 Routine/Partial Inspection No Violations Noted
2595727 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted On site for a partial inspection of Clouse Unit 2H well.

Well is completed, production equipment in place (production tanks & GPU) & in containment. Well is fenced and has a jersey barrier. Well tag in place. Site has 1 combustor, and well is connected to a pipeline, with a pipeline header on well pad.

All temporary site E/S controls are removed, & PCSM plan implemented. Site is stabilized with 100% vegetation growth.

For data sources see[8]

References