37-019-22150

Well Details

Well ID: 37-019-22150
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Oakland Township
Operator Name: XTO ENERGY INC
Well Pad ID: 144824
Farm/Lease Name: CLOUSE UNIT 3H
License Status:
Spud Date:
Permit Date: 2013-10-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.915981
Longitude: -79.823508

For data sources see[1][2][3]

Well History

Date Event
2013-10-22 New Permit Application
2014-01-15 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-02 2015-01-22 5,770 4,955,490 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Universal Proppant Silica Substrate NA 100 10.1301 4,728,000.0
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0180771 8437.13
Other - (non-hazardous) NA 92.5 1.01341 472991
Hydrochloric Acid 7647-01-0 7.5 0.0205422 9587.65
Hydrochloric Acid 7647-01-0 7.5 0.0435494 20325.8
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00316415 1476.8
Hydrochloric Acid 7647-01-0 15 0.00359562 1678.18
Hydrochloric Acid 7647-01-0 15 0.00762272 3557.75
Other - (non-hazardous) NA 85 0.0815007 38038.8
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0383739 17910.2
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0164459 7675.81
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.6028 41,353,500.0
Biocide, EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.000496163 231.574
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00297698 1389.44
Polyethylene Glycol 25322-68-3 60 0.00595395 2778.89
Other - (non-hazardous) NA 5 0.000496163 231.574
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.00725887 3387.93
Ethylene Glycol 107-21-1 30 0.00311094 1451.97
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Formaldehyde 50-00-0 1 0.00000547 2.554
Thiourea 62-56-6 1 0.00000547 2.554
Methanol 67-56-1 5 0.00002736 12.771
Ethoxylated alcohol 68002-97-1 35 0.000191539 89.397
Short chained glycol ether 112-34-5 60 0.000328352 153.252
Acetophenone 98-86-2 1 0.00000547 2.554

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 161,583.00 185 0.00 0 160.42 124
2016 XTO ENERGY INC 104,100.00 315 0.00 0 284.39 254
2017 XTO ENERGY INC 33,049.00 102 0.00 0 117.43 102
2018 XTO ENERGY INC 257,363.17 322 75.59 30 1,157.18 292
2019 XTO ENERGY INC 76,056.66 288 0.00 0 306.43 288

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 1,150.23 Tons LANDFILL 100403
2014 XTO ENERGY INC Drilling Fluid Waste 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 701.80 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Fracing Fluid Waste 576.64 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 8,552.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 830.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 128.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 182.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 945.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,323.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 45.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 328.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 103.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 2,864.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 658.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 564.00 Bbl INJECTION DISPOSAL WELL 34-133-24096

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2239350 Primary Facility 2014-01-16 Drilling/Alteration No Violations Noted
2247442 Primary Facility 2014-02-20 Drilling/Alteration No Violations Noted
2251702 Primary Facility 2014-03-05 Routine/Partial Inspection No Violations Noted
2267135 Primary Facility 2014-04-29 Drilling/Alteration No Violations Noted
2269451 Primary Facility 2014-05-07 Routine/Partial Inspection No Violations Noted
2323899 Primary Facility 2014-11-24 Routine/Partial Inspection No Violations Noted
2338983 Primary Facility 2015-01-26 Routine/Partial Inspection No Violations Noted
2595728 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted On site for a partial inspection of Clouse Unit 3H well.

Well is completed, production equipment in place (production tanks & GPU) & in containment. Well is fenced and has a jersey barrier. Well tag in place. Site has 1 combustor, and well is connected to a pipeline, with a pipeline header on well pad.

All temporary site E/S controls are removed, & PCSM plan implemented. Site is stabilized with 100% vegetation growth.

For data sources see[8]