If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-027-21317 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.020593,"lon":-77.8925,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Centre | |
Municipality: Snow Shoe Township | |
Operator Name: TEXAS KEYSTONE INC | |
Well Pad ID: | |
Farm/Lease Name: C&K COAL CO (4910) 122-CEN | |
License Status: | |
Spud Date: | |
Permit Date: 2005-03-10 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.020593 | |
Longitude: -77.8925 |
Date | Event |
---|---|
2005-03-10 | New Permit Application |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2005 | TEXAS KEYSTONE INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2006 | TEXAS KEYSTONE INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2826428 | Primary Facility | 2018-12-17 | Follow-up Inspection | No Violations Noted | The weather is 35 Deg. F and cloudy at the time of inspection. Follow up inspection of XTO Energy Inc., PA Tract A Pad, well # 7H on December 17, 2018.
Performed an inspection of the drilling site. 5.5 in. production casing has been cemented in the 8.5 in. OH on December 13, 2018 with no issues, TD is 20871 ft. Verified Lead and Tail cement samples, looks good. All chemical additives and cement silos are placed on spill containment. Wellsite look neat and well organized. No concerns or violations noted at the time of inspection. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector. XTO Energy INC. Representative - Jerald A. Nietert, Rig Manager. |
For data sources see[6]