37-031-00431

Well Details

Well ID: 37-031-00431
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Limestone Township
Operator Name: EQT PROD CO
Well Pad ID:
Farm/Lease Name: GALLAGHER BROS
License Status: Plugged and Abandoned
Spud Date:
Permit Date:
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.144231
Longitude: -79.303764

For data sources see[1][2][3]

Well History

Date Event
1915-05-30 Drilling Completion
1993-07-29 OLD WELL
2018-08-16 Begin Plugging
2018-09-20 Finished Plugging
2019-08-09 Fully Plugged

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1986 APOLLO GAS CO 874.00 362 0.00 0 0.00 0
1987 APOLLO GAS CO 979.00 368 0.00 0 0.00 0
1988 APOLLO GAS CO 987.00 361 0.00 0 0.00 0
1989 APOLLO GAS CO 749.00 372 0.00 0 0.00 0
1991 APOLLO GAS CO 448.00 369 0.00 0 0.00 0
1997 CARNEGIE PROD CO 45 365 0.00 0 0.00 0
1998 CARNEGIE PROD CO 166 365 0.00 0 0.00 0
1999 CARNEGIE PROD CO 338 365 0.00 0 0.00 0
2000 EQUITRANS INC 341 365 0.00 0 0.00 0
2001 EQUITABLE PROD EASTERN STATES EXPLORATION INC 51 365 0.00 0 0.00 0
2003 EQT PROD CO 0.00 0 0.00 0 0.00 0
2004 EQT PROD CO 0.00 0 0.00 0 0.00 0
2005 EQT PROD CO 0.00 0 0.00 0 0.00 0
2006 EQT PROD CO 0.00 0 0.00 0 0.00 0
2007 EQT PROD CO 0.00 0 0.00 0 0.00 0
2008 EQT PROD CO 0.00 0 0.00 0 0.00 0
2009 EQT PROD CO 6.00 61 0.00 0 0.00 0
2010 EQT PROD CO 0.00 0 0.00 0 0.00 0
2011 EQT PROD CO 0.00 0 0.00 0 0.00 0
2012 EQT PROD CO 0.00 0 0.00 0 0.00 0
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 0.00 0 0.00 0 0.00 0
2015 EQT PROD CO 0.00 0 0.00 0 0.00 0
2016 EQT PROD CO 0.00 0 0.00 0 0.00 0
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2018 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
213706 Primary Facility 1991-06-11 Routine/Complete Inspection No Violations Noted
218715 Primary Facility 1997-05-08 Routine/Complete Inspection No Violations Noted
2715334 Primary Facility 2018-04-06 Administrative/File Review No Violations Noted Reviewed Notice of Intent to Plug.
2742670 Primary Facility 2018-06-19 Administrative/File Review No Violations Noted Reviewed Notice of Intent to Plug.
2764882 Primary Facility 2018-08-17 Routine/Partial Inspection No Violations Noted At the time of inspection, Penn Mechanical was onsite working the location. The site had containment laid out, but had to be pulled back because more stone was needed. Plugging activities have not started taking place. The workers onsite believed that would take place on Monday. Hydrocarbon had a service rig laid down on the edge of location. The well had a proper label displayed.
2768338 Primary Facility 2018-08-27 Routine/Partial Inspection No Violations Noted At the time of inspection, there was no activity at the site. Hydrcarbon Well Service rig 9 was setup over the well. A 100 bbl steel tank was brought onsite for water. Well has been getting cleaned out so a half-round was brought onsite for residual waste. All of the equipment has containment under it.
2771155 Primary Facility 2018-09-04 Routine/Partial Inspection No Violations Noted At the time of inspection, there was no activity at the site. Depth was down to 1703' last Friday when they shut down for Labor Day weekend. They are circulating on gel to get returns, but string keeps sticking per Co. man. Due to this being a gas migration area, it is still highly recommended to keep trying.
2771157 Primary Facility 2018-09-05 Routine/Partial Inspection No Violations Noted At the time of inspection, Hydrocarbon was onsite cleaning out well. Progress is being made, but it is very slow. They can average about 14' an hour, but they are cutting a small hole through a larger bridge plug. So the outside edges eventually give way and cave in. This then needs cleaned out. Today they have been between 1713' and 1746'. Process is taking a lot of water and still losing some circulation. TD is 2493'.
2774676 Primary Facility 2018-09-11 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, no activity was occurring. Some equipment has been removed from the site. It appears that the open top tank has been pumped down and only had a small amount of waste. Attainable bottom as at 1620'. Plan was to cement a solid plug in 2 stages. The 1st would be from Attainable bottom to just below the 3" casing seat at 1144'. Then pull the 3" out and plug from there to surface. The 3" may need logged to locate the packer if it doesn't pull. In that case, pipe will be perforated below the packer and cut above it and pulled.

A cement plug was set this morning that only made it to 1577'. Operator will build off of this.

2775439 Primary Facility 2018-09-14 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, Hydrocarbon was onsite. Top of cement from previous days cement was tagged at 866'. 20 sxs cement were added following that. A copy of the bond log was given to me. Plugging operator will be back out on Monday to tag cement again, then attempt to pull the surface casing.
2778520 Primary Facility 2018-09-19 Plugging(Includes Plugged/Mined Through) No Violations Noted At the time of inspection, Hydrocarbon was onsite and had just finished cementing. The 7" casing was bond logged after it was not able to be pulled and found to be set to 490'. A copy of the log was received. 20 perfs were shot at 460' to squeeze cement. I preferred to not shoot above this point in order to preserve "good pipe" above which would protect fresh ground water better. 225 sxs total cement was used and well was cemented to surface. An above ground monument was placed with the API number on it. Plugging operator will wait until tomorrow snd see if cement top drops then rig down.
2784547 Primary Facility 2018-10-04 Routine/Complete Inspection No Violations Noted This site located south off Forest Drive in a wooded area. This well plugged-completed 9/19/2018.

No violations observed.

For data sources see[6]

References